Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIO NS OF PERMIT B LR E-10-21 -7 207 Aspen Valley Polo Club LLC New S/F Dwelling 21 Equestrian Way, Carbondale Aspen Equestrian Estates, Lot B1 1) ALL WORK SHALL COMply W|TH THE 2015 INTERNATIONAL RESIDENTIAL CODE (t.R.c.)AND 2009 INTERNATIONAL ENERGY CONSERVATION CODE (l.E.C.C.) 2) PROPOSED IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED IN THE ATTACHED "GARFIELD COUNry BUILDING REOUIREMENTS". NUMBER REFERENCES NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST. 3) ELECTRTCAL PERMtTTtNG AND INSPECTIONS BY COLORADO STATE ELECTRIC BOARD, ELECTRICAL ROUGH.IN APPROVAL IS REOUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL IS REOUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY. 4) WILDFIRE MITIGATION REOUIREMENTS: COMPLY WITH WILDFIRE MITIGATION AND DEFENSIBLE SPACE REOUIREMENTS PER COLORADO STATE FOREST SERVICE AND LOCAL FIRE DISTRICT. 5) OPEN-HOLE SOTLS REPORT REOUTRED AT FOOTING INSPECTION TO VERIFY 2,OOO PsF SOIL BEARING CAPACITY. PROVIDE COPY OF ENGINEER'S REPORT FOR BUILDING INSPECTOR REVIEW AT FOOTING INSPECTION. ó) A LOT IMPROVEMENT CERTIFICATE, SEALED BY A COLORADO LICENSED SURVEYOR, IS REQUIRED AT FOUNDATION INSPECTION TO VERIFY STRUCTURE - INCLUDING OVERHANGS, DECKS AND ROOF PROJECTIONS -- IS IN COMPLIANCE WITH MINIMUM SETBACKS AND/OR BUILDING ENVELOPE REOUIREMENTS, 7) PRE-ENGTNEERED ROOF TRUSSES. HAVE ENGINEERING FOR INSPECTOR ATTIME OF FRAME INSPECTION,