HomeMy WebLinkAboutConditions of Permitc ONDITIONS OF PERMIT
BLRE-10-21 -7 211
David Eisele
New S/F Dwelling w/ attached garage
35ó Pinyon Mesa Dr, GWS
Pinyon Mesa, FLG 2, Lot78
1) ALL WORK SHALL COMply WITH THE 2015 INTERNAT|ONAL RESIDENTIAL CODE
(r.R,c.)AND 2009 INTERNATIONAL ENERGY CONSERVATION CODE (l.E.C.C.)
2) PROPOSED lMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED
IN THE ATTACHED "GARFIELD COUNTY BUILDING REOUIREMENTS". NUMBER
REFERENCES NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST.
3) ELECTRTCAL PERMtTTtNG AND TNSPECTTONS BY COLORADO STATE ELECTRIC
BOARD. ELECTRICAL ROUGH-IN APPROVAL IS REOUIRED AT FRAME INSPECTION
ELECTRICAL FINAL APPROVAL IS REOU]RED FOR FINAL INSPECTION &
CERTIFICATE OF OCCUPANCY,
4) WILDFIRE MITIGATION REOUIREMENTS: COMPLY WITH WILDFIRE MITIGATION
AND DEFENSIBLE SPACE REOUIREMENTS PER COLORADO STATE FOREST SERV¡CE
AND LOCAL FIRE DISTRICT.
5) OPEN-HOLE SOTLS REPORT REOUIRED AT FOOTING INSPECTION TO VERIFY 2.OOO
PSF SOIL BEARING CAPACITY. PROVIDE COPY OF ENGINEER'S REPORT FOR
BUILDING INSPECTOR REVIEW AT FOOTING INSPECTION.
contractor to ensure foundation ls protecfed from frost, freeze during winter conditions,
ó) A LOT IMPROVEMENT CERTIFICATE, SEALED BY A COLORADO LICENSED
SURVEYOR, IS REQU]RED AT FOUNDATION INSPECTION TO VERIFY STRUCTURE -
INCLUDING OVERHANGS, DECK AND ROOF PROJECTIONS -- IS IN COMPLIANCE
WITH MINIMUM SETBACKS AND/OR BUILDING ENVELOPE REOUIREMENTS,
7) PRE-ENGINEERED ROOF TRUSSES, HAVE ENGINEERING FOR INSPECTOR AT TIME
OF FRAME INSPECTION,