Loading...
HomeMy WebLinkAboutConditions of Permitc ONDITIONS OF PERMIT BLRE-10-21 -7 211 David Eisele New S/F Dwelling w/ attached garage 35ó Pinyon Mesa Dr, GWS Pinyon Mesa, FLG 2, Lot78 1) ALL WORK SHALL COMply WITH THE 2015 INTERNAT|ONAL RESIDENTIAL CODE (r.R,c.)AND 2009 INTERNATIONAL ENERGY CONSERVATION CODE (l.E.C.C.) 2) PROPOSED lMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED IN THE ATTACHED "GARFIELD COUNTY BUILDING REOUIREMENTS". NUMBER REFERENCES NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST. 3) ELECTRTCAL PERMtTTtNG AND TNSPECTTONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL ROUGH-IN APPROVAL IS REOUIRED AT FRAME INSPECTION ELECTRICAL FINAL APPROVAL IS REOU]RED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY, 4) WILDFIRE MITIGATION REOUIREMENTS: COMPLY WITH WILDFIRE MITIGATION AND DEFENSIBLE SPACE REOUIREMENTS PER COLORADO STATE FOREST SERV¡CE AND LOCAL FIRE DISTRICT. 5) OPEN-HOLE SOTLS REPORT REOUIRED AT FOOTING INSPECTION TO VERIFY 2.OOO PSF SOIL BEARING CAPACITY. PROVIDE COPY OF ENGINEER'S REPORT FOR BUILDING INSPECTOR REVIEW AT FOOTING INSPECTION. contractor to ensure foundation ls protecfed from frost, freeze during winter conditions, ó) A LOT IMPROVEMENT CERTIFICATE, SEALED BY A COLORADO LICENSED SURVEYOR, IS REQU]RED AT FOUNDATION INSPECTION TO VERIFY STRUCTURE - INCLUDING OVERHANGS, DECK AND ROOF PROJECTIONS -- IS IN COMPLIANCE WITH MINIMUM SETBACKS AND/OR BUILDING ENVELOPE REOUIREMENTS, 7) PRE-ENGINEERED ROOF TRUSSES, HAVE ENGINEERING FOR INSPECTOR AT TIME OF FRAME INSPECTION,