Loading...
HomeMy WebLinkAbout5.0 Land Use Change Permit; I I I l+,1 h ¡:1?'l'ïl l'll | { l{ r t [lt', I r{l ll TI I I'lrl"l'h h |{ I [r'i' I I I I I Reeeotion#: 876855 ô5JO6'12D1F. 10:16:10 fìlYl Jean Êiberica - -'í"åi-à-neã Èeel$0.éo Doc Fee,0.00 GÊRFIELn CoUNTY Ç0 LAND USE CHANGE PERMIT A Parcel of Land Located Approximately 3/¿ Mile Southwest of Battlement Mesa in Sectíon 24, Township 7 South, Range 96 West of the 6th P.M. and Legally Described ín Exhibit "A" wíth the Project Area Descríbed ín Exhibit "8" (Assessor's Parcel No. 2409-244-00-1 24) ln accordance with and pursuant to provisions of the Garfield County Land Use and Development Code, as amended, and the Director's Decision Letter dated Apri|22,2016, the Director of the Community Development Department hereby authorizes the following activity: A Booster Compressor Facílity known as the Ursa Speakman A Booster Compressor as shown on the Site Plan Attached as Exhibit "8" (GAPA-I2-1 5-8410) This Administrative Land Use Change Permit is issued subject to the conditions set fotth in Exhibit "C" and shall be valid only during compliance with such conditions and other applicable provisions of the Garfield County Land Use and Development Code, as amended, Building Code, and other regulations of the Board of County Commissioners of Garfield County, Colorado. COMMUN ITY DEVELOPMENT DEPARTMENT GARFIELD COUNTY, COLORADO Sl v /Lorv Tamra Allen, AICP Acting Director of Community Development I Date for et I l ll li,l hl' l I' l'¡4 lttl¡ l'þ1ç ll I¡ h iUU,t ? t',*l li'il l d hrur¡, I l ll lReceptionfi: 87685505/06/?016 10 16 10 nm Jean Êlberico2 of 4 R¿c Ëee:$O.óti DÕc [:ee:0.00 GËIRFIELI] COUNTY CO Exhibit A (Legal Description) The NWl/4 of rhê sE1/4, bhe NE1/4 of che sa]./4 and thalporrlôn of Uhe ¡lE1/4 of Ehe ,sl.rl./4 -l-ying soullr of Èhêêarfleld Counuy Road rraversing Êâid quarLer Eectlon, Section 24, Townehip 7 South, Rånge 96 WeEÈ, GarÊield Councy, Colorado $ii #,rr##ïrlf.4 Hrl-iHd f&k iÅF=j¡åf;fReceptiorr4. B7685505/06r;'016 t,J trì 1O (ìfl .leÂn Êil)e,ico3 nf 4 Re¡, tne nO .lû ir.c I oo.A óó iãñr ,F;:$#, tþ,1,[ H,,+, *l li I I FI-L) COIJT.JTY ';O Exhibit B (Project Site Plan) Mk.t¡&'t /æ \ \ \ Crapblc Scale {rË)lbr.Õ À L3.:{o. ,)\ Hil trirfu [i5 i,$¿H, l{!d_lúH,R_eceptionft: S76855u5/06/?0t6 t0 16 t0 Êtl4 Lr f 4 R..r I ÞÞ Sn nrÌ [)o. , fä:*,hl,rlfu'f'llil|l l${ r lJtl HC ;l lll Je¿rr ÊlbericoF+e û OO GÊRFIEL tr COl.lf,Jf y Co Exhibit C (page 1 of 2) That all representations made by the Applicant in the appl¡cation shall be conditions of approval unless specifically altered by the conditions of approval. That the Ursa Speakman A, Booster Compressor shall be operated in accordance with all applicable Federal, State, and local regulations governing the operation of this type of facility. Prior to issuance of the Land Use Change Permit, the Applicant shall confirm that the site is currently in complíance with afl existing conditions of approval for the injection well on the site as documented in Resolution No. 2014-41. The facility shall maintain compliance with CDPHE Storm Water Management Permits, Drainage and Grading Plans, Reclamation Plans, SPCC Plans and Erosion Control Plans for the site. The Applicant shall monitor and update if necessary water quality and erosion control measures during construction and during operation of the facility. The Applicant shall maintain all required COGCC permits and forms for the facility and shall comply with all conditions or requirements of said permits and forms. The facility shall maintain compliance with COGCC Noise Standards/Regulations at the residential 50 dBA standard or less. Within 30 days of initiating operation of the booster compressor the Applicant shall provide on-site noise readings to confirm compliance with the noise limit. lf compliance is not confirmed or if future compliance issues are identified, the Applicant shall provide additicnal ncíse mitigation in order to achieve compliance as confírmed by a qualified professional. As represented in the Application the facílity shall have only temporary lighting for unscheduled night time maíntenance. All lighting shall comply with Section 7-306, with all lighting to be directed inward and doward toward the interior of the site. The booster compressor facilíty and associated equipment shall be painted a non-glare neutral color to lessen any visual impacts. The Applicant shall maintain all required CDPHE permits forthe facility including any applicable air quality, APEN permits. The Applicant shall comply with the Battlement Mesa Wildlife Mitigation Plan and agreement between Ursa Operatíng Company and CPW. 10. A waiver regarding hours of operation is approved allowing the Applicant to operate the booster compressor on a 24 hour basis as represented in the submittals. 1 2 3 4 5 6 7 8 I