Loading...
HomeMy WebLinkAboutConditions of Permitco NDITIONS OF PERMIT BLM F-01 -22-7299 and SEPT-01-22-7 300 STEVE & BARBARA HOBSON New MF S/F dwelling unit on permanent foundation TBD CR 3OO, PARACHUTE HORBETZ, LOr 1 , 2407 07 101007 1) MANUFACTURED HOUSES ARE REGULATED & INSPECTED BY COLORADO DEPT, oF HOUS|Nc (C.D,O.H.)AND ALL FACTORY-BUTLT RESIDENTIAL STRUCTURES INSTALLED IN GARFIELD COUNry MUST MEET C.D.O.H. GUIDELINES FOR MANUFACTURE AND INSTALLATION AT THE JOB SIÏ8, 2) FOUNDATTON, CRAWL SPACE & S|TE WORK SHALL COMPLY WITH 201 5 LR,C.,2009 I. E,C.C, AN D MAN UFACTU RER'S I NSTALLATION REOU I REM ENTS, 3) REFER TO PLAN ATTACHMENTS FOR GARFIELD COUNTY'S BUILDING REOU I REM ENTS AN D MANU FACTU RER'S I NSTALLATION REOU IREM ENTS. 4) ALL PLUMBING AND GAS PIPING CONNECTIONS MUST BE PERFORMED BY A COLORADO LICENSED PLUMBER, AND ALL ELECTRICAL CONNECTIONS MUST BE PERFORMED BY A COLORADO LICENSED ELECTRICIAN. 5) ELECTRTCAL PERMtTTtNG AND TNSPECTIONS BY COLORADO STATE ELECTRIC BOARD, ELECTRICAL ROUGH-IN APPROVAL IS REOUIRED AT GARAGE FRAME INSPECTION. ELECTRICAL FINAL APPROVAL IS REOUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY. 6) pRtoR TO FTNAL BUtLD|NG tNSpECTtON & CERTIFICATE OF OCCUPANCY, PROVIDE BUILDING INSPECTOR WITH FINAL APPROVAL / SIGN-OFF FROM GARFIELD COUNTY'S PUBLIC HEALTH DEPARTMENT FOR INSTALLATION OF THE ON-SITE WASTEWATER TREATM ENT SYSTEM. 7) cARFtELD COUNTy BUtLDtNG DEPT. INSPECTIONS TO INCLUDE THE FOLLOWING: A. FOOTINGS B, FOUNDATION C. SEPTIC SYSTEM CONNECTION D. PLUMBING/GAS E. SITE / GARAGE FRAMING F. FINAL INSPECTION & CERTIFICATE OF OCCUPANCY* *NOTE: GARFIELD COUNry REQUIRES C.D.O,H, INSTALLATION INSIGNIA TO BE AFFIXED PRIOR TO FINAL BU:LDING INSPECTION & CERTIFICATE OF OCCUPANCY