I wanted to follow-up on our phone conversation yesterday afternoon concerning a couple of issues described in my
previous Plan Review Correction Notice for the Switzer Barn project at St. Finnbar.
From:
Sent:
To:
Cc:
Subiect:
a
a
Dave Argo
Thursday, January 13,2022 B:14 AM
Erik Hendrix
Maley Patrick; Colleen Wirth
RE: 33 St. Finnbar Farm, Barn Permit
Buildine Heieht - Following our conversation I consulted with Glenn Hartmann, our Planning Manager, about
my determination that this project is classified as "Residential" and therefore subject to the 2S-foot building
height limitation. Following a detailed conversation with Glenn focused on Land Use & Development Code
definitions and intent of Zone District Dimensional Limitations (Table 3-20L) we do not have the ability to
support your position that this barn structure qualifies as "Non-Residential" and it is therefore required to
comply with the 25-foot building height requirements.
Engineered Site Grading & Drainage Requirement - Just to reiterate our conversation, given that plans for the
primary residence (Building Permit #BLRE-07-21-6979) already included site grading plans as prepared by
Roaring Fork Engineering, we will waive this requirement for the barn project. However, we will still require an
Engineer's certification that flood plain issues and requirements referenced in Plat Note #14 have all been
addressed at both project locations (primary residence + barn).
Let me know if you have any further questions
Dave Argo
Chief BuildingOfficial
tarrteW Coanty
Building Department
708 8th Sûeet, Suite 401
Glenwood Springs, CO 81607
Te I : 970.945. 1377 x1560
Ema i I : d a rgo @ go rfie ld-co u nty.co m
We b : g a rfie I d -co u nty. co m
From: Erik Hendrix <erik@ka-designworks.com>
Sent: Wednesday, January t2,202211:16 AM
To: Dave Argo <dargo@garfield-county.com>
Cc: Maley Patrick <patrick@maleybuilding.com>
Subject: IExternal] 33 St. Finnbar Farm, barn permit
1
Dave, left you a message, following up with an email.
Please call me at your earliest convenience to discuss the issues you are having with the permit for the barn at the cell
phone number below.
Thank you,
IRIKHENDRIX
ARCHITECT AIA
KADESIGNWORKg
POBoxL2204
Asperr CO 81612
Office:
23400 Two Rivers Road #46
Basalt CO 81621
970-279-5356 - oifice
970-948-4840 - cell
erik(ôka- designworlis. c0in
ka-designworks.com
2
Dave Argo
From:
Sent:
To:
Cc:
Subject:
Attachments:
Dave Argo
Tuesday, January 11,2022 5:48 PM
Patrick Maley (patrick@maleybuilding.com); Ken Adler (ken@ka-designworks.com)
Colleen Wirth
Switzer Barn Permit #BLRE-12-21-7260 - Plan Review correction Report
33 St Finnbar Road correction Notice.pdf;2-Family Fire Reqts Policy.pdf
Patrick & Ken:
First off, my apologies for our office not getting back to you in a more timely fashion with regard to the above
referenced building permit application. As you may be aware, the Building Department has been significantly short
staffed since October and our turnaround timeframes have been adversely affected by this situation. I have recently
returned to Garfield County to become the new Chief Building Official and although we are still looking to fill a Building
lnspector position, we hope to be back to full strength soon.
I have recently stepped in to provide plan review services on the Switzer Barn project, and there are several issues that
must first be addressed prior to issuance of a building permit for this project. As part of my plan review commentary, I
have enclosed a couple of attachments more clearly identifying our questions or concerns and these attachments
include:
o Plan Review Correction Report
¡ PolicY Directive & lnformation Sheet
Thanks again for your patience and please let us know if you have any questions.
Dave Argo
Chi ef Buildíng offici al
Garfteld Connty
Building Department
708 9th Sûeet, Suite 407
Glenwood Springs, CO 81607
Tel: 970.945. 1377 x1560
E ma i I : d a rg o @ ga rfie ld -co u nty.co m