HomeMy WebLinkAboutVault and Haul OWTS DesignFive above ground sewage holding tanks with 1500-gallon (7500-gallon total) capacity on-site.
The Vault System is displayed in the pictures. Sewage flow is estimated to be 600 gallons per
day (8 individuals x 75 gpcd). Sewage holding tanks need to be emptied approximately every
12 days (7500 gallons/ 600 gallons per day). Wastewater vault is equipped with overflow alarm
device. Terra Energy Partners utilizes the services of a licensed contractor to remove and haul
the wastewater to a state certified treatment/disposal facility.
Two aboveground potable water tanks of approximately 3360 gallon capacity each on -site.
“Potable Water Only” signs will be posted on tanks. Potable water demand is estimated to be
600 gallons per day (8 individuals x 75 gpcd). Required minimum fire suppression demand is
2500 gallons.
Road access to the site is maintained year round through the services of a
private road maintenance and
construction contractor.
The site will temporarily office and house up to a maximum of eight
individuals during natural gas drilling activities and is expected to be
completed in one year or less. The individuals will occupy up to four
individual units located on the well pad. Office/houses have Colorado
Division of Housing compliance tags.
NR 23-3 Pad
Vault System Description
NR 23-3 2020.dwg 9/18/2020 13:33:321
3
NR 23-3 Location Sheets.dwg 9/9/2020 08:52:35