HomeMy WebLinkAboutOWTS DesignXXXXXXXXXCounty Road No. 309 (60' R.O.W.)54605455545054455440543554305425542054155395539053855380
N33° 45' 16"E 261.81' (TIE)Proposed
4 Bedroom w/
Beauty Shop
76 (4x19) QUICK 4 INFILTRATOR UNITSOR 60 (4x15) ADS ARC UNITSPROFILE PIT, TYP.
TIE TO PROPERTY CORNER TO
BE ASBUILT UPON COMPLETION
C/O
PP
PP
PP
5' MIN.
Lot Size:
37.68± Ac.
SS SS
SS SS C/O
Ex.
OWTS1-1/4''Ø1-
1
/
4
'
'
Ø
1-
1
/
4
'
'
Ø
1-
1
/
4
'
'
Ø
1-
1
/
4
'
'
Ø
1-
1
/
4
'
'
Ø
1-1/4''Ø1-1/4''ØF
V
F
V
F
V
F
V
4"Ø SCH.40 OR SDR35 PVC @
2% MIN. & 2-WAY CLEANOUT
(SEE DETAIL)
CDPHE APPROVED 1,500-GALLON
PRECAST CONCRETE THREE (3)
CHAMBER SEPTIC TANK W/ HIGH
HEAD PUMP ASSEMBLY (SEE DETAIL)
INSPECTION PORT AT
EACH END OF EACH
CHAMBER ROW, TYP.>>>>>>CONSTRUCT A 12" DEEP
SWALE ABOVE THE
ABSORPTION FILED
380 LF 1-1/4"Ø SCH.40 TRANSPORT PIPE FROM
THE TANK TO THE SOIL TREATMENT AREA (STA).
SLOPE THE PIPE TO DRAIN BACK TO THE TANK
WITH NO SAGGING IN THE PIPELINE
FLUSH VALVE ASSEMBLY,
TYP. (SEE DETAIL)
Ex. Shop
& ADU THE WELL IS LOCATED
SOUTH OF THE EX. SHOP
& ADU BUILDING
37110DERIC J O N WA
L
T
ERCOLOR A D O LICE
N
S
EDPROF
E
SSIONA L E N GINEER1/13/22
SURFACE
6"-12"
TOPSOIL
6' TO 7'VERY
SANDY,SLIGHTLY
CLAYEY SILT
00 40'80'
Scale: 1" = 40'
SITE EVALUATION
1.SITE AND SOIL EVALUATIONS WERE PERFORMED BY:
DERIC J. WALTER, PE DANIEL E. HARDIN, PE
BOUNDARIES UNLIMITED INC.KUMAR & ASSOCIATES, INC.
923 COOPER AVE., STE. 201 5020 C.R.#154
GLENWOOD SPRINGS, CO 81601 GLENWOOD SPRINGS, CO 81601
970.945.5252 970.945.7988
2.EVALUATION DATE(S): SEPTEMBER 2020 & JUNE 2021.
3.SETBACK REQUIREMENTS FOR A TREATMENT LEVEL 1 STA TRENCH/BED, UNLINED
SAND FILTER OR SEEPAGE PIT (PER TABLE 7-1) AND AN ADWF < 1000 GPD:
3.A.SPRING OR WELL=100'
3.B.POTABLE WATER SUPPLY LINE=25'
3.C.POTABLE WATER SUPPLY CISTERN=25'
3.D.DWELLING=20'
3.E.PROPERTY LINE, PIPE OR LINED IRRIGATION DITCH=10'
3.F.INTERMITTENT IRRIGATION LATERAL, INFILTRATION STRUCTURE=25'
3.G.LAKE, WATER COURSE, IRRIGATION DITCH, STREAM OR WETLAND=50'
3.H.DRY GULCH, CUT BANK OR FILL AREA=25'
3.I.SEPTIC TANK=5'
3.J.RESTRICTIVE LAYER OR GROUNDWATER (VERTICAL): 3' (TREATMENT LEVEL 1,
PRESSURE DOSING FEED)
3.SETBACK REQUIREMENTS FOR THE SEPTIC TANK SHALL BE (PER TABLE 7-1):
3.A.SPRING OR WELL=50'
3.B.POTABLE WATER SUPPLY LINE=10'
3.C.POTABLE WATER SUPPLY CISTERN=25'
3.D.DWELLING=5'
3.E.PROPERTY LINE, PIPE OR LINED IRRIGATION DITCH=10'
3.F.INTERMITTENT IRRIGATION LATERAL, INFILTRATION STRUCTURE=10'
3.G.LAKE WATER COURSE, IRRIGATION DITCH, STREAM OR WETLAND=50'
3.H.DRY GULCH, CUT BANK OR FILL AREA=10'
3.I.STA TRENCH/BED, UNLINED SAND FILTER OR SEEPAGE PIT=5'
Vicinity Map
Scale: N.T.S.
Site & Soils Evaluation
SOIL EVALUATION
1.GEOTECHNICAL EVALUATION
INDICATED AND SITE OBSERVATION
CONFIRMED ABOUT 6 TO 12 INCHES
OF TOPSOIL OVER VERY STIFF, LOW
PLASTIC VERY SANDY,SLIGHTLY
CLAYEY SILT TO A PROFILE DEPTH
OF 6-FEET (TYPE-2A). THE
ASSOCIATED TREATMENT LEVEL 1
LONG TERM ACCEPTANCE RATE
(LTAR) IS 0.50 gpd/SF.
2.USDA SOIL TEXTURE CALCULATOR
RESULTS: SILT LOAM.
2.1.% SAND: 38
2.2.% CLAY: 11
2.3.% SILT: 51 NORTHMAINTENANCE NOTES
1.TO ENCOURAGE THE HEALTH AND LONGEVITY OF THE OWTS SYSTEM, THE OWNER SHALL CONSIDER THE FOLLOWING:
1.A.MINIMIZE THE AMOUNT OF WATER THAT GOES DOWN THE DRAIN, THE BETTER YOUR SYSTEM WILL WORK.
1.B.MINIMIZE SOLIDS GOING DOWN THE DRAIN.
1.C.ELIMINATE GARBAGE DISPOSALS OR KEEP THE USE OF GARBAGE DISPOSALS TO A MINIMUM.
1.D.MINIMIZE GREASE AND OILS THAT GO DOWN THE DRAIN.
1.E.USE LINT FILTERS ON LAUNDRY MACHINE DRAINS.
1.F.KEEP SAND AND DIRT OUT OF THE BUILDING DRAIN.
1.G.AVOID FLUSHING SANITARY NAPKINS OR PAPER PRODUCTS OTHER THAN TOILET PAPER.
1.H.DO NOT USE LYE-BASED DRAIN UNCLOGGER CHEMICALS SUCH AS DRAINO, OVEN-OFF, OR OTHER STRONG
CLEANING AGENTS.
1.I.DO NOT PUT ANY “ROOT DETERRENTS” DOWN THE DRAIN.
1.J.DO NOT POUR PAINT THINNER, PESTICIDES, PAINTS OR PHOTO LAB CHEMICALS DOWN THE DRAIN
1.K.MINIMIZE USE OF CHLORINE BLEACH AND TOILET ADDITIVES.
2.THE OWNER SHALL CONTRACT WITH A SEPTIC TANK INSPECTOR TO INSPECT THE TANK ANNUALLY FOR GREASE AND
SEDIMENT ACCUMULATION. THE INSPECTOR SHALL REMOVED AND PROPERLY DISPOSED OF ACCUMULATED GREASE
AND SEDIMENT AS NEEDED TO ENSURE PROPER FUNCTION OF THE SYSTEM.
3.THE OWNER SHALL FOLLOW THE GUIDANCE OUTLINED IN THE OPERATIONS AND MAINTENANCE (O&M) MANUAL
PROVIDED BY THE PUMP AND TANK MANUFACTURERS.
Battlement
Mesa
Parachute
SITEI-70
NORTH
ByRevisionNo.Date923 Cooper Ave., Ste. 201
Glenwood Springs, CO 81601
(T) 970.945.5252
www.bu-inc.com
Engineer or Surveyor Seal
Sheet
Client Information:
PROJECT NO.
File Name:
Designer:
Drafter:
Date:N:\PROJECTS\2021\21033-Perdue OWTS\dwg\21033-V-Topo.dwg 1/13/2022 9:13 AMSubsurface Utility Engineering (SUE)
Required Project:
If "Yes", SUE Certification by:
Firm:
Job #:
Date:987654321/13/22
DJW
DJW
21033-v-topo.dwg
21033
970.948.1735
Parachute, CO 81635
PO Box 476
Michael Perdue
Garfield County, Colorado1.Parcel ID: 2407-054-00-0086Onsite Wastewater Treatment System (OWTS)Perdue ResidenceC.1
NO
N/A
N/A
N/A
SYSTEM NOTES
1.ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH CDPHE REGULATION 43 ONSITE WASTEWATER TREATMENT SYSTEM (OWTS) REGULATION, MOST CURRENT
EDITION AND LOCAL AGENCY REQUIREMENTS WHICH MAY OR MAY NOT SPECIFICALLY BE NOTED ON THE DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE
FOR KNOWING AND CONFORMING TO SUCH SPECIFIC DETAILS AS ARE REFERRED TO IN THE ABOVE MENTIONED REGULATIONS. THIS DRAWING DOES NOT
CONSTITUTE AN OWTS PERMIT. A PERMIT MUST BE OBTAINED FROM APPROPRIATE LOCAL AGENCY. THE ENGINEER MUST OBSERVE THE CONSTRUCTED SYSTEM
BEFORE BACKFILL AND PROVIDE A LETTER OF INSPECTION AS REQUIRED BY THE LOCAL AGENCY. A REQUEST FOR INSPECTION MUST BE MADE BY THE
CONTRACTOR AT LEAST 48-HOURS PRIOR TO THE EXPECTED TIME OF BACKFILLING.
2.DEMAND CALCULATIONS (SEC.43.6.A)
2.A.FOUR (4) BEDROOM RESIDENCE PLUS BEAUTY SHOP WITH ONE (1) CHAIR USING TREATMENT LEVEL 1 (TL1).
2.B.AVERAGE DAILY WASTEWATER FLOW (ADWF) AND ORGANIC LOAD RATE (BOD5):
2.B.1.SINGLE FAMILY DWELLING: 75 gpdc & 0.20 BOD5 lbs/day
2.B.2.BEAUTY SHOP: 100 gpd/CHAIR * 0.70 BOD5 lbs/day
2.B.2.ADWF = 75 gpd * (3 BEDROOMS * 2 PERSONS/BEDROOM + 1 BEDROOM * 1 PERSON/BEDROOM) + 100 gpd * 1 CHAIR = 625 gpd
2.B.3.BOD5 = 0.20 lbs/day * (3 BEDROOMS * 2 PERSONS/BEDROOM + 1 BEDROOM * 1 PERSON/BEDROOM)+ 0.70 lbs/day * 1 CHAIR = 2.10 lbs/day
BOD5 mg/L = BOD5*1,000,000 = 2.10 lbs/day*1,000,000 = 403 mg/L
ADWF*8.34 625 gpd*8.34
2.B.4.CBOD5 = BOD5 * 0.85 = 343 mg/L
3.SEPTIC TANK (SEC.43.9.B.2.a):
3.A.48 HOURS DETENTION: ADWF * (48 HRS/24 HRS) = 1,250-GALLONS STANDARD STORAGE + 50% DOSING STORAGE = 1,875 GALLONS
3.B.INSTALL A 1,500-GALLON THREE-COMPARTMENT TANK WITH A HIGH HEAD DOSING PUMP ARRANGEMENT (2,000-GALLON TOTAL).
3.C.THE TANK IS NOT SUBJECT TO BUOYANCY.
4.ABSORPTION AREA CALCULATIONS
4.A.GROUNDWATER WAS NOT ENCOUNTERED, THE SITE SLOPES AT THE OWTS ARE BETWEEN 4-8%. THEREFORE, THE SYSTEM SHALL BE A SHALLOW
GRAVELLESS CHAMBER SYSTEM IN A PRESSURE DOSED BED CONFIGURATION.
4.B.SOILS WERE ANALYZED BY KUMAR & ASSOCIATES, INC GEOTECHNICAL ENGINEERS 09/23/20; PROJECT NO.20-07-416) AND SITE CONFIRMED BY
BOUNDARIES UNLIMITED INC (6/26/21). THE LONG TERM ACCEPTANCE RATE (LTAR) IS ESTIMATED AT 0.50 gpd/SF (SEE THE SITE & SOILS EVALUATIONS
DETAIL).
4.C.MINIMUM SOIL TREATMENT AREA, A:
A = ADWF = 625 = 1,250 SF
LTAR 0.50 gpd/SF
4.D.SIZE ADJUSTMENT FACTORS: PRESSURE DOSED BED= 1.0; CHAMBERS= 0.7
4.D.1.A, adj = 1,250 SF * 1.0 * 0.7 = 875 SF
4.E.GRAVELLESS CHAMBER SYSTEM:
4.E.1.INFILTRATOR QUICK4: 875 SF / 12 SF/UNIT = 73 UNITS IN BED CONFIGURATION (USE 76 IN A 4x19 CONFIGURATION).
4.E.2.ADS ARC 36: 875 SF / 15 SF/UNIT = 59 UNITS IN A BED CONFIGURATION (USE 60 IN A 4x15 CONFIGURATION).
5.THIS SYSTEM IS SIZED FOR TYPICAL DOMESTIC WASTES ONLY. BACKWASH OR FLUSHING FLOWS FOR REVERSE OSMOSIS UNITS OR WATER SOFTENERS AND/OR
FILTERS SHOULD NOT BE INTRODUCED INTO THIS SYSTEM.
6.CLEAN OUTS ARE REQUIRED AT THE HOUSE AND AT ALL BENDS AND AT LEAST EVERY 100-FEET BETWEEN THE HOUSE AND THE SEPTIC TANK.
7.THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLING ALL WATER TIGHT COMPONENTS THROUGHOUT THE SYSTEM TO PREVENT INFILTRATION.
8.INSTALL RISERS AS NECESSARY TO BRING ALL ACCESS PORTS TO FINAL GRADE. PORTS SHALL BE MARKED IF CAPS ARE TO BE BURIED.
9.INSTALL 3-INCHES OF BLUEBOARD INSULATION, 3-FEET WIDE, OVER SEWER AND EFFLUENT PIPE WHEREVER DEPTH IS LESS THAN 5-FEET. UNDER NO
CIRCUMSTANCES SHALL COVER BE LESS THAN 2-FEET.
10.SITE PLAN INFORMATION FROM OTHERS. LOCATIONS OF ALL COMPONENTS MAY BE VARIED AS NECESSARY AS LONG AS ALL MINIMUM DISTANCES AND SLOPES
MEET THOSE REQUIRED.
11.PRESSURE DISTRIBUTION DESIGN:
11.A.DOSE SIZE: 30 GALLONS
11.B.PUMP ON TIME: 120 SECONDS
11.C.DOSES PER DAY: 21
11.D.PIPE DIAMETER/MATERIAL: 1-1/4"Ø SCH.40 PVC
11.E.ORIFICE SIZE/SPACING: 3/32"Ø AT 5' 0.C.
11.F.OPERATING HEAD AT THE DISTAL END ORIFICE: 5'
11.G.PUMP INFORMATION: ORENCO MODEL PF30 HIGH HEAD EFFLUENT PUMP (1/2 HP, 115V, 1"Ø, 60Hz)(DESIGN POINT OF 15 GPM @ 42' TDH), OR
MANUFACTURER APPROVED EQUAL.
11.H.DRAIN-BACK VOLUME FROM FORCEMAIN: 29.5 GALLONS
11.I.DESIGN SOFTWARE REFERENCE: ORENCO SYSTEMS PUMPSELECT V. 2.18, PUMP DATA FILE 1.11 (2018).
Scale: N.T.S.
Cleanout
Scale: N.T.S.
Flush Valve
4" PVC TEE/RISER
4" PVC TEE/RISER WITH EFFLUENT
FILTER ON THE TANK OUTLET
FLOW
ATTACH REMOVABLE CAP OR
THREADED CLEANOUT ASSEMBLY.
INSTALL MARKER IF CAP IS TO
BE BURIED.
FINISH GRADE
4"Ø PVC RISER4"Ø PVC
TWO-WAY
CLEANOUT TEE
4"Ø SEWER LINE
1-1/4"Ø PVC
DISTRIBUTION PIPE
1-1/4"Ø PVC
ELBOW
1"Ø BALL VALVE &
TREADED ASSEMBLY
FOR BACKFLUSHINGIRRIG. VALVE BOX
1"x-1/4" PVC
REDUCER
GENERAL ABSORPTION AREA NOTES
1.BOUNDARIES UNLIMITED INC. SHALL BE CONTACTED
IMMEDIATELY IF BEDROCK OR GROUNDWATER IS
ENCOUNTERED IN THE OVER-EXCAVATION.
2.INSTALL CHAMBER UNITS IN ACCORDANCE WITH
MANUFACTURER'S RECOMMENDATIONS.
3.THE BOTTOM OF THE ABSORPTION FIELD SHALL BE LEVEL
AND THE BOTTOM AND SIDEWALLS MUST BE RAKED TO
REMOVE ANY SOIL SMEARS INCURRED DURING THE
EXCAVATION. FAILURE TO DO SO MAY REQUIRE THE
CONTRACTOR TO REPLACE THE ABSORPTION FIELD AT
HIS/HER OWN EXPENSE.
4.DRAINAGE SWALES ARE TO BE PROVIDED ABOVE AND
AROUND THE FIELD, AS NECESSARY, TO PREVENT
SURFACE RUNOFF FROM ENTERING ABSORPTION AREA.
5.NO EXCAVATION OF THE ABSORPTION FIELD IS TO BE
DONE DURING WET WEATHER AND USE OF RUBBER TIRE
VEHICLES OVER THE ABSORPTION AREA IS STRICTLY
PROHIBITED.
6.TOPSOIL COVER MAY BE VARIED (1-FOOT MINIMUM,
2-FOOT MAXIMUM) TO ALLOW FOR LANDSCAPING.
Scale: N.T.S.
Chamber Bed System
12' (MAX.)
EX. GRADE
3:1
M
A
X
2% MIN
UNDISTURBED
NATIVE TOPSOIL
BOTTOM TO BE LEVEL AND FLAT OVER
ENTIRE AREA TO WITHIN 0.05'±. (TYP.),
COMPACT REPLACEMENT SOIL TO 90%
STANDARD PROCTOR AND RACK THE
SURFACE TO REMOVE SOIL SMEARS.
PVC COUPLING FOR SUPPORT
STANDARD INSPECTION PORT, TYP.
(4"Ø PVC SOLID PIPE CUT TO FIT.
LOCATE PER PLAN VIEW. ATTACH
REMOVABLE CAP OR THREADED
CLEANOUT ASSEMBLY.
GRAVELLESS CHAMBER SYSTEM:
INFILTRATOR QUICK 4, ADVANCED
DRAINAGE SYSTEMS BIODIFFUSER
(STANDARD), OR ENGINEER
APPROVED EQUAL.
TOPSOIL FILL
CIRCULAR IRRIGATION-STYLE VALVE
BOX & COVER - LID COLOR PURPLE OR
GREEN - LABEL "SEWER"
5' MIN.
1-1/4"Ø PRESSURE DOSING PIPE
WITH 3/32"Ø HOLES DRILLED EVERY
5' O.C. FACING UP WITH ONE (1)
HOLE FACING DOWN AT THE END OF
EACH LATERAL (FOR WEEPING).
INSTALL A 12" PAVER OR SPLASH
STONE BELOW THE DOWN FACING
HOLE TO PREVENT SOIL EROSION.