HomeMy WebLinkAbout3.05 Wastewater Management Plan_CDP
BJU N23-496 Central Delivery Point
Administrative Review Caerus Piceance LLC Garfield County, Colorado 1001 17th Street, Suite 1600 2022 Denver, CO 80202
BJU N23-496 Central Delivery Point
Article 4 Section 203.N. Wastewater Management and System Plan
Wastewater Management and System Plan Narrative
The Wastewater Management and System Plan, Section 4-203(N) of the Garfield County Land Use and Development Code is not applicable to the proposed site. The subject use is not served by an existing public collection system or treatment facility. The proposed site will not require an on-site wastewater treatment system. During construction of the facility (30 days), interim reclamation (10 days), and initial production phases the site will be access daily. After production operations are fully established, the site will only be access 2-3 times a week. Due to the minimal presence of personnel onsite, a wastewater use will not be required onsite. A portable toilet will be located onsite. The portable toilet will be provided and maintained by Western Colorado Waste.
Western Colorado Waste 910 Coffman Road Whitewater, CO 81527 (970) 255-7072