Loading...
HomeMy WebLinkAboutConditions of Permitco NDITIONS OF PERMIT BLRE-03-22-7387 PEAK3 SUNDANCE LLC NEW S/F DWELLING W/ ATTACHED GARAGE 1042 BALD EAGLE WAY, CARBONDALE ASPEN GLEN, FLG 4, LOT SD-ó 1 ) ALL WORK SHALL COMply W|TH THE 201 5 INTERNATIONAL RESIDENTIAL CODE (r.R.c,)AND 2009 INTERNATIONAL ENERGY CONSERVATION CODE (l.E.C.C.) 2} PROPOSED IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED IN THE ATTACHED "GARFIELD COUNry BUILDING REOUIREMENTS". NUMBER REFERENCES NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST. 3) ELECTRICAL pERMtTTtNG AND TNSPECTIONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL ROUGH.IN APPROVAL IS REOUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL IS REOUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY. 4) WILDFIRE MITIGATION REOUIREMENTS: COMPLY WITH WILDFIRE MITIGATION AND DEFENSIBLE SPACE REOUIREMENTS PER COLORADO STATE FOREST SERVICE AND LOCAL FIRE DISTRICT, 5) ON-SITE WASTEWATER TREATMENT SYSTEM (OWTS) SHALL BE INSPECTED BY PROFESSIONAL ENGINEER LICENSED IN STATE OF COLORADO. PROVIDE ENGINEER'S FINAL REPORT PRIOR TO BUILDING FINAL INSPECTION & CERTIFICATE OF OCCUPANCY. ó) AN ELEVATION SURVEY, SEALED BY A COLORADO LICENSED SURVEYOR, IS REOUIRED AT FRAMING INSPECTION TO VERIFY ACTUAL BUILDING HEIGHT, 7) A LOT TMPROVEMENT CERTIFICATE, SEALED BY A COLORADO LICENSED SURVEYOR, IS REOUIRED AT FOUNDATION INSPECTION TO VERIFY STRUCTURE - INCLUDING ROOF OVERHANGS, DECKS AND OTHER PROJECTIONS - IS IN COMPLIANCE WITH MINIMUM SETBACKS AND/OR BUILDING ENVELOPE REOUIREMENTS. 8) OPEN HOLE SOTLS REPORT tS REOUTRED AT FOOTING INSPECTION 2500 PSF 9) PRE-ENGTNEERED ROOF TRUSSES. HAVE ENGINEERING FOR INSPECTOR AT TIME OF FRAME INSPECTION.