HomeMy WebLinkAboutConditions of Permitco NDITIONS OF PERMIT
BLRE-03-22-7387
PEAK3 SUNDANCE LLC
NEW S/F DWELLING W/ ATTACHED GARAGE
1042 BALD EAGLE WAY, CARBONDALE
ASPEN GLEN, FLG 4, LOT SD-ó
1 ) ALL WORK SHALL COMply W|TH THE 201 5 INTERNATIONAL RESIDENTIAL CODE
(r.R.c,)AND 2009 INTERNATIONAL ENERGY CONSERVATION CODE (l.E.C.C.)
2} PROPOSED IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED
IN THE ATTACHED "GARFIELD COUNry BUILDING REOUIREMENTS". NUMBER
REFERENCES NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST.
3) ELECTRICAL pERMtTTtNG AND TNSPECTIONS BY COLORADO STATE ELECTRIC
BOARD. ELECTRICAL ROUGH.IN APPROVAL IS REOUIRED AT FRAME INSPECTION.
ELECTRICAL FINAL APPROVAL IS REOUIRED FOR FINAL INSPECTION &
CERTIFICATE OF OCCUPANCY.
4) WILDFIRE MITIGATION REOUIREMENTS: COMPLY WITH WILDFIRE MITIGATION
AND DEFENSIBLE SPACE REOUIREMENTS PER COLORADO STATE FOREST SERVICE
AND LOCAL FIRE DISTRICT,
5) ON-SITE WASTEWATER TREATMENT SYSTEM (OWTS) SHALL BE INSPECTED BY
PROFESSIONAL ENGINEER LICENSED IN STATE OF COLORADO. PROVIDE
ENGINEER'S FINAL REPORT PRIOR TO BUILDING FINAL INSPECTION & CERTIFICATE
OF OCCUPANCY.
ó) AN ELEVATION SURVEY, SEALED BY A COLORADO LICENSED SURVEYOR, IS
REOUIRED AT FRAMING INSPECTION TO VERIFY ACTUAL BUILDING HEIGHT,
7) A LOT TMPROVEMENT CERTIFICATE, SEALED BY A COLORADO LICENSED
SURVEYOR, IS REOUIRED AT FOUNDATION INSPECTION TO VERIFY STRUCTURE -
INCLUDING ROOF OVERHANGS, DECKS AND OTHER PROJECTIONS - IS IN
COMPLIANCE WITH MINIMUM SETBACKS AND/OR BUILDING ENVELOPE
REOUIREMENTS.
8) OPEN HOLE SOTLS REPORT tS REOUTRED AT FOOTING INSPECTION 2500 PSF
9) PRE-ENGTNEERED ROOF TRUSSES. HAVE ENGINEERING FOR INSPECTOR AT TIME
OF FRAME INSPECTION.