Loading...
HomeMy WebLinkAboutClarification Letter from Engineer 03.24.2022KAUPENGINEERING F.lC. 1129 Grand Avenue Glenwood $prings, CO 81601 (970) e4S9613 March 24,2A22 Crawford Design Build P.O. Box4525 Carbondale CO 81623 RE: Niro Residence,3g RoyalCoachman, Garfield County, GO ATTN: DonGþnn Dear Don: per your rcquest, I reviewed the Questions that he Garfield County Building Ðepartment inrprå"tor naå askãd for clarification. You provided the list of items verbally to me. Item 1: The.areas of ¡oof over framing shall be supported with vertical 2x4s @ 4'-0" on center that support the over framing diiectly to the prefab trusses below This shall be done in alloverframd areas. Item 2: The üimmer studs at the upper level bedroom wirdolv on Grid 7 were interupted by a horizontal sill phte. À new 2x4 x å +" sister shall be ¡ßBtal¡€d to the side of the existing king studs frorn üæ ffoor S# e*erding tprãd. Aüach with PL40t dfteÉ¡ue & 3" screurs @ 4" ã.". .tæg"red. A S¡ripson MSTC2ã sùap shall be ded to fF ¡nside face of the intemrpted trimmers centered on the sillplate. Ite¡yr 3: Tfæ sbe gf *æ Ðper sfrair openirg was feúþed bV ã*J*rg Q'l 11 7'8 ML's with nãngão. Thís is "6¿¡¡pdËËas natr,äg. *ltre Éfltood sf*m at thê hanger' aü (10) 3r screws each side into the ML beam behind. Item 4: The (3) 11 718 ML beam at the edge of the- upper floor opening on Grid J was hung är'ä piv*ooa ånim. rrtã contractor conf¡rmãd that the ihimmed boards would not impact the finish materials. The sn¡m snau have (10) 3" screws added each side into the ML beam behind. Item 5: The upper deck area was removed from the pro¡ec{' The roof trusses were modified io "pãn t¡om'erio ı io r and the (3) 14" ML beam was removed. This is acceptabre as framed, Pþase ser¡l pffiograpf6 çf *Ê cg¡npteûed rcp€úrs. Ftæe c¿ü if you need additional fiauP