Loading...
HomeMy WebLinkAboutCorrespondenceColleen W¡rth c)*eçFe/*,æ C/arrigiz,hiz* az From: Sent: To: Cc: Follow Up Flag: Flag Status: Subject: Tai jacober <tai @jacoberbrothers.com > Thursday, April 7, 2022 9:04 AM Colleen Wirth m arcybalderson @m ac.com; sara @evolvestru Re: [External] Deck replacement questions Follow up Flagged O/Øî/ tuark,srya cr.com uþh. rØtb 6R*o7-v7a5 Good morning, 1. This is correct the current request for permit is to add the new deck and roof over the new deck. 2. A. Thepool isunderreviewwiththeHOA. lthasnotyetbeenapproved. lfthepoolisapproveditisourintentto apply for a separate permit at that time. B. This is accurate. A little lighting will be added at front entry way. 3. The new retainíng wall will be built approxímately 8' to the south of the new deck. Thís is to hold the current ground back and if the pool is eventually allowed it will retain the pool. This wall can be seen on 52.001 Thanks much, Tai Jacober J2 Bar LLC 97A3L9-I106 cell tai rothers.com On Apr 7,2022, at 8:37 AM, Colleen Wirth <cwirth@garfield-county.com> wrote: BLRE-03-22-7395 - Balderson repair / addition perm¡t is UNDER REVIEW Hello Marcy and Sara and Tai- Courtesy update to let you know l'm starting work on your plan review and have questíons T L. ls the permitted work scope contained to replacing the existing deck with new covered deck .aeree f 2. Sheet 1.2.001. from the lanclscape architect illr.rstrates an outdoor pool and spa at the back of the pfoperty dnd some step lighting in the presumed front entry deck. 2.a Are the pool aàd spa elements already existing? Or is this intended to be another future building phase outside the scope of work you want permitted now? 2.b Mayl presr¡'me no new work (beyond electrical and lighting) is planned at the front entry deck, as there appears to be no structural changes for that area on the drawings? 3. Sara Mickus from"Evolve Structural Design shows on 56.001 (detaíl 2) a foundation retaining wall. Will there be ány new retaining walls in this current permitfecl phase of constrr,¡ction? lf so, where? An email narrative or explanation will suffice; I don't believe my questions will necessitate REVISING and RESUBMITTING any plan sheets. Any support you can provide to clarify and confirm work scope and detaíls is greatly appreciated. I want to correctly mark up plans, and not create confusion for the builder and inspectors. Colleen Wirth Plans Examiner Garfield County Building Division L08 8th Street, Suite 401 Glenwood Springs, CO 8L601 cwi rth @earfiel d-cou ntv. co m offíce (970) 945-1377 ext. L6L0 2