HomeMy WebLinkAboutFire Sprinkler Rough-In Inspection ReportJim Wilson
From:
Sent:
lo:
Subject:
Orrin Moon < Orrin.Moon@Crfr.us >
Friday, October 08,2021 12:42 PM
Jim Wilson
lExternal] Fire Sprinkler Rough-in lnspection 206n Native Springs
Jim,
This e-mail to advise you that I have completed a fire sprinkler rough-in inspection on 206 Native Springs, Olivas
Residence. I have advised him that a 200 psi test will be required for the system prior to final inspection and that he is
responsible for any leaks if the dry-wall is installed prior to the hydro. test. As far as dry-wall and insulation, you can go
ahead and issue the permit.
Please let me know if you need anything else.
TÌ{ÀTÙK YOU,
oßßtN D. MOON
Pß-E-VENTIONDIVTSIO'NCHIE.FÆ'IR-EM&RST{AL
COLOR,&DO RIV-Eß FIRË RESCUE.
g,70-625-12.48
orrin.moon@crfr.us