HomeMy WebLinkAboutOWTS Design 05.02.2022 2789 Riverside Parkway Grand Junction, Colorado 81501 Phone: 970-255-8005 Info@huddlestonberry.com May 2, 2022 Project#02347-0001 Sarah Moon 2334 Acacia Avenue Rifle, Colorado 81650
Subject: OWTS Design 5620 County Road 342 Silt, Colorado
Reference: Geotechnical Investigation, 5620 County Road 342, Silt, Colorado by Huddleston-Berry Engineering & Testing, LLC for Sarah Moon, October 26, 2021.
Dear Ms. Moon,
At your request, Huddleston-Berry Engineering & Testing, LLC completed design of an Onsite Wastewater Treatment System (OWTS) for a single-family residence at 5620 County Road 342 in Silt, Colorado. The site location is shown on Figure 1 – Site Location Map. A site plan is
included as Figure 2. Site Description At the time of the investigation, the site was heavily vegetated by large bushes and trees and generally sloping down towards the south. Site topography is shown on Figure 2. Vegetation
consisted of grasses, weeds, and small to large bushes and trees. The site was bordered to the north by a vacant property, to the west by open land, to the south by a rural residential property, and to the east by County Road 342. Subsurface Investigation
As indicated in the referenced report, three test pits were excavated in the vicinity of the proposed OWTS. The test pits encountered 1.0 foot of topsoil above brown, moist, blocky sandy loam soils with a weak structure. Groundwater was not encountered in the subsurface at the time of the investigation. In general, HBET believes that the seasonal high groundwater in the vicinity of the proposed Soil Treatment Area (STA) is deeper than 8.0 feet.
The locations of the test pits are shown on Figure 2. Copies of the test pit logs are included in Appendix A.
5620 County Road 342 #02347-0001 05/02/22
C:\HBET\Project Files\2022\02347-0001 5620 CR 342\200 - Geo\02347-0001 LR050222.doc 2
Onsite Wastewater Treatment System Seepage Bed Design The design of the absorption system generally follows the requirements of the Garfield County Board of Health as outlined in the Garfield County On-Site Wastewater Treatment System (OWTS) Regulations, adopted June 2018. The proposed construction at the site is anticipated to
include a four-bedroom home. Based upon visual-tactile classification of the site soils, a Long-Term Acceptance Rate (LTAR) of 0.6 will be utilized for the absorption field design. Infiltrator Systems Quick4 Standard Chambers are proposed. The daily flow of the sewage disposal system is calculated below, and a
plan and profile of the absorption system are shown on Figure 3. Average Daily Flow = (7 persons)(75 GPD/person) = 525 GPD
Soil Treatment Area = (525 GPD / 0.6) = 875 Square Feet Adjusted Soil Treatment Area = (875 SF)(1.2)(0.7) = 735 Square Feet # of Quick4 Chambers = (735 / 12) = 62 Chambers; Use 64 Chambers
System Installation The installation of the septic tank, plumbing lines, Infiltrators, etc. should be completed in accordance with the Garfield County On-Site Wastewater Treatment System (OWTS) Regulations and Infiltrator Systems, Inc. specifications. In addition, the following construction procedures
are recommended:
The septic tank and distribution box should be placed level over native soils that have been scarified to a depth of 8 to 12 inches, moisture conditioned, and recompacted to a minimum of 95% of the standard Proctor maximum dry density, within ±2% of optimum moisture content. However, up to 3-inches of washed rock or pipe bedding
passing the 1-inch sieve may be used as a leveling course under the septic tank and/or distribution box.
The bottoms of trenches and backfill around the septic tank and distribution box which will support sewer or effluent lines should be compacted to at least 90 percent
of the standard Proctor maximum dry density, within ±2% of optimum moisture
content. Pipe bedding should have a maximum particle size of 1-inch.
Vehicular or heavy equipment traffic and placement of structures should not encroach within 10 feet of the septic tank or distribution box.
Inspection Schedule
Huddleston-Berry Engineering & Testing LLC should be retained to monitor the construction of the OWTS. The following schedule of observation and/or testing should be followed:
Observe the absorption bed excavation prior to placement of Infiltrator chambers.
Observe placement of the septic tank, distribution box, and all connecting sewer and
effluent lines prior to backfill. Verify proper fall between inverts.
Observe and verify installation of the absorption bed prior to placement of cover and backfill.
5620 County Road 342 #02347-0001 05/02/22
C:\HBET\Project Files\2022\02347-0001 5620 CR 342\200 - Geo\02347-0001 LR050222.doc 3
In conformance with Garfield County regulations, HBET will be required to provide the Garfield County Board of Health with documentation certifying that the OWTS was placed in
conformance to the plan and profile and Garfield County regulations.
General Notes
The OWTS design was based upon the results of the subsurface investigation and on our local experience. The design is valid only for the proposed construction.
We are pleased to be of service to your project. Please contact us if you have any questions or
comments regarding the contents of this report.
Respectfully Submitted: Huddleston-Berry Engineering and Testing, LLC
Michael A. Berry, P.E.
Vice President of Engineering
05/02/22
FIGURES
Garfield County, CO
1,601 ft
2789 Riverside ParkwayGrand Junction, CO 81501Project No.: 02347-0001Date: 05/02/22By: MAB5620 COUNTY ROAD 342PARCEL 245515100030FIGURE 2 - SITE PLANAPPROX. TEST PIT LOCATIONC.I. = 2 FTSCALE: 1" = 50'SCALE: 1" = 100'SITE PLANENLARGED VIEW05/02/22
GENERALIZED BED PROFILECOVER SOIL; NATIVE SOILS OR OTHER SUITABLETOPSOIL. GRADE TO CARRY SURFACE WATERAWAY FROM BED.NONWOVEN, NEEDLE PUNCHED, GEOTEXTILEFABRIC IMMEDIATELY ABOVE CHAMBERSGENERALIZED SYSTEM PROFILE2789 Riverside ParkwayGrand Junction, CO 81501MINIMUM SETBACKS(UNITS = FT)**OTHER SETBACKS NOT LISTED HERE SHOULD BE IN ACCORDANCE WITH GARFIELD COUNTY OWTS REGULATIONSINFILTRATOR SYSTEMS QUICK4STANDARD CHAMBERS**USE SWEEP 90'S ORTWO 45'S AT 90DEGREE BENDS**DETAIL AREASCALE: 1" = 40'4-INCH DIAMETER SEWER ANDEFFLUENT PIPE MEETING ASTMD1785, SCHEDULE 40 OR SDR 35SEPTIC TANK WITHMINIMUM 1,250GALLON CAPACITYDISTRIBUTION BOXTHAT ENSURES EVENDISTRIBUTION OFEFFLUENTINFILTRATOR SYSTEMSQUICK4 STANDARD CHAMBERSNEW RESIDENCEINSPECTION PORTSINSPECTION PORTSWATER LINEWELLProject No.: 02347-0001Date: 05/02/22By: MAB5620 COUNTY ROAD 342PARCEL 245515100030FIGURE 3 - SEPTIC SYSTEMDETAILS05/02/22
APPENDIX A Typed Test Pit Logs
Sandy LOAM with Organics (TOPSOIL)
Sandy LOAM, brown, moist, blocky, weak structure
Bottom of test pit at 7.0 feet.
NOTES
GROUND ELEVATION
LOGGED BY SD
EXCAVATION METHOD Trackh/Backhoe AT TIME OF EXCAVATION dry
AT END OF EXCAVATION dry
AFTER EXCAVATION ---
TEST PIT SIZE
EXCAVATION CONTRACTOR Client GROUND WATER LEVELS:
CHECKED BY MAB
DATE STARTED 9/24/21 COMPLETED 9/24/21
DEPTH(ft)0.0
2.5
5.0 GRAPHICLOGATTERBERG
LIMITS
MATERIAL DESCRIPTION
SAMPLE TYPENUMBERFINES CONTENT(%)RECOVERY %(RQD)BLOWCOUNTS(N VALUE)POCKET PEN.(tsf)DRY UNIT WT.(pcf)MOISTURECONTENT (%)LIQUIDLIMITPLASTICLIMITPLASTICITYINDEXPLASTICITYINDEXPAGE 1 OF 1
TEST PIT NUMBER TP-1
CLIENT Sarah Moon
PROJECT NUMBER 02347-0001
PROJECT NAME 5620 CR 342
PROJECT LOCATION Silt, CO
GEOTECH BH COLUMNS 02347-0001 5620 CR 342 USDA.GPJ GINT US LAB.GDT 4/29/22Huddleston-Berry Engineering & Testing, LLC2789 Riverside Parkway
Grand Junction, CO 81501970-255-8005
Sandy LOAM with Organics (TOPSOIL)
Sandy LOAM, brown, moist, blocky, weak structure
Bottom of test pit at 7.0 feet.
NOTES
GROUND ELEVATION
LOGGED BY SD
EXCAVATION METHOD Trackh/Backhoe AT TIME OF EXCAVATION dry
AT END OF EXCAVATION dry
AFTER EXCAVATION ---
TEST PIT SIZE
EXCAVATION CONTRACTOR Client GROUND WATER LEVELS:
CHECKED BY MAB
DATE STARTED 9/24/21 COMPLETED 9/24/21
DEPTH(ft)0.0
2.5
5.0 GRAPHICLOGATTERBERG
LIMITS
MATERIAL DESCRIPTION
SAMPLE TYPENUMBERFINES CONTENT(%)RECOVERY %(RQD)BLOWCOUNTS(N VALUE)POCKET PEN.(tsf)DRY UNIT WT.(pcf)MOISTURECONTENT (%)LIQUIDLIMITPLASTICLIMITPLASTICITYINDEXPLASTICITYINDEXPAGE 1 OF 1
TEST PIT NUMBER TP-2
CLIENT Sarah Moon
PROJECT NUMBER 02347-0001
PROJECT NAME 5620 CR 342
PROJECT LOCATION Silt, CO
GEOTECH BH COLUMNS 02347-0001 5620 CR 342 USDA.GPJ GINT US LAB.GDT 4/29/22Huddleston-Berry Engineering & Testing, LLC2789 Riverside Parkway
Grand Junction, CO 81501970-255-8005
Sandy LOAM with Organics (TOPSOIL)
Sandy LOAM, brown, moist, blocky, weak structure
Bottom of test pit at 3.0 feet.
NOTES
GROUND ELEVATION
LOGGED BY SD
EXCAVATION METHOD Trackh/Backhoe AT TIME OF EXCAVATION dry
AT END OF EXCAVATION dry
AFTER EXCAVATION ---
TEST PIT SIZE
EXCAVATION CONTRACTOR Client GROUND WATER LEVELS:
CHECKED BY MAB
DATE STARTED 9/24/21 COMPLETED 9/24/21
DEPTH(ft)0
1
2
3 GRAPHICLOGATTERBERG
LIMITS
MATERIAL DESCRIPTION
SAMPLE TYPENUMBERFINES CONTENT(%)RECOVERY %(RQD)BLOWCOUNTS(N VALUE)POCKET PEN.(tsf)DRY UNIT WT.(pcf)MOISTURECONTENT (%)LIQUIDLIMITPLASTICLIMITPLASTICITYINDEXPLASTICITYINDEXPAGE 1 OF 1
TEST PIT NUMBER TP-3
CLIENT Sarah Moon
PROJECT NUMBER 02347-0001
PROJECT NAME 5620 CR 342
PROJECT LOCATION Silt, CO
GEOTECH BH COLUMNS 02347-0001 5620 CR 342 USDA.GPJ GINT US LAB.GDT 4/29/22Huddleston-Berry Engineering & Testing, LLC2789 Riverside Parkway
Grand Junction, CO 81501970-255-8005