Loading...
HomeMy WebLinkAboutStructural Closeout Letter Letter of Involvement Structural Closeout Letter May 9, 2022 Client: Ben and Sarah Thornal 100 Home Place Glenwood Springs, CO 81601 Reference: Thornal Residence 100 Home Place Glenwood Springs, CO 81601 To Whom It May Concern: I performed a site visit on 5/9/2022 and walked the site with Scott Baltzer of Level Build Co to observe the project under construction for general compliance with the structural contract documents and responded to construction questions from the field. These observations were not continuous or exhaustive, therefore all conditions may not have been observed. Based on my observations and experience, to the best of my knowledge, the structure of the Thornal Residence was constructed in general conformance with the structural contract documents and is, in my opinion, substantially in conformance with the structural provisions of the 2015 International Building/Residential Code. Sincerely, Nate Decker, PE, SE 05/09/2022