HomeMy WebLinkAboutEngineer's Correspondence - Over FramingJohn Hendricks
Sent:
To:
Cc:
From:Dan Berg <dan.berg@giardhomes.com >
Friday, May 20, 202210:27 AM
John Hendricks
Roger Giard
Fwd: lExternal] Merriman Residence Clarifications
Hi John,
I
Here are our communications with the engineer. l've also included photos as per requested. Let me know if this will
suffice. I hope you are well.
Dan
Subject:
1
Begin forwarded message
From: Geoff Heller <geoff@coloradostructura Lcom>
Date: May t9,2022 at 5:06:45 PM MDT
To: Dan Berg <dan.berg@giardhomes.com>
Cc: Roger Giard <roger.giard@giardhomes.com>, Mike Arbaney <mike@coloradostructural.com>
Subject: Re: Merriman Residence Clarifications
Hey Dan,
Thanks for sending the photo's over. Yes, if all of the over-framing is supported @ 48" o.c. (which it
appears it is) we will sign-off on the over-framing as well as the LVL's we discussed this morning.
Thank you,
Geoff Heller
Colorado Structural, Inc.
tel: (970)-349-5922
fax: (970)-349-5926
geoffl@co loradostluctural. com
From: Dan Berg <dan.berg@giardhomes.com>
Date: Thursday, May 19, 2022at 5:03 PM
To: Geoff Hel ler <geoff@coloradostructu ral.com>
Cc: Roger G iard <roger.giard @gia rd homes.com>
Subject: Re: Merriman Residence Clarifications
Hi Geoff,
We stiffened up the over framing above the garage today as per your specs. Please let me know if you
can sign off on this for the inspector. l've included some photos. Thanks
Dan
<image001.jpg>
<image002.jpg>
<image003.jpg>
<image004.jpg>
<image005.jpg>
On May L9,2022, at 10:02 AM, Geoff Heller <geoff@coloradostructural.com> wrote:
Hey Rodger,
What's your phone number? I have a few questions l'd like to discuss with you.
Thanks,
10
Geoff Heller
Colorado Structural, Inc.
tel: (970)-349-5922
fax: (970)-349-5926
geoff@co loladostructural. com
From : Roger G iard <roger.g¡ard @giard homes.com>
Date: Thursday, May 19, 2O22 at 8:44 AM
To: Geoff Hel le r <geoff@ coloradostru ctu ra l. com >
Cc: Dan Berg <dan.berg@giardhomes.com>
Subject: Merriman Residence Clarifications
Geoff,
As discussed yesterday, there are a few issues that the building inspector will need
clarified/approved before he will let us move on to insulation. Here are the main items
that need to be addressed;
L. Overframe as-built bracing (See attached pictures)
<image006.jpg>
<image007.jpg>
<image008.jpg>
<image009.jpg>
<imageOL0.jpg>
<imageO1L.jpg>
2. Beam bearing assembly/detail at 52.1, Gridlines D3. ls bearing adequate and
per plan based on attached p¡cs?
lnstead of using the HUC hanger for the 2-Ll-7/8" beam, it bears on top of the
5-L/2" LVL beam pack coming from plan left, and the 3-LL-7 /8" lvl Beam in the
roof rafters (Coming from plan right) bears on top of both with a stud pack in
between.
<imageO12.jpg>
<imageO13.jpg>
<imageO14.jpg>
11