Loading...
HomeMy WebLinkAboutEngineer's Correspondence - Over FramingJohn Hendricks Sent: To: Cc: From:Dan Berg <dan.berg@giardhomes.com > Friday, May 20, 202210:27 AM John Hendricks Roger Giard Fwd: lExternal] Merriman Residence Clarifications Hi John, I Here are our communications with the engineer. l've also included photos as per requested. Let me know if this will suffice. I hope you are well. Dan Subject: 1 Begin forwarded message From: Geoff Heller <geoff@coloradostructura Lcom> Date: May t9,2022 at 5:06:45 PM MDT To: Dan Berg <dan.berg@giardhomes.com> Cc: Roger Giard <roger.giard@giardhomes.com>, Mike Arbaney <mike@coloradostructural.com> Subject: Re: Merriman Residence Clarifications Hey Dan, Thanks for sending the photo's over. Yes, if all of the over-framing is supported @ 48" o.c. (which it appears it is) we will sign-off on the over-framing as well as the LVL's we discussed this morning. Thank you, Geoff Heller Colorado Structural, Inc. tel: (970)-349-5922 fax: (970)-349-5926 geoffl@co loradostluctural. com From: Dan Berg <dan.berg@giardhomes.com> Date: Thursday, May 19, 2022at 5:03 PM To: Geoff Hel ler <geoff@coloradostructu ral.com> Cc: Roger G iard <roger.giard @gia rd homes.com> Subject: Re: Merriman Residence Clarifications Hi Geoff, We stiffened up the over framing above the garage today as per your specs. Please let me know if you can sign off on this for the inspector. l've included some photos. Thanks Dan <image001.jpg> <image002.jpg> <image003.jpg> <image004.jpg> <image005.jpg> On May L9,2022, at 10:02 AM, Geoff Heller <geoff@coloradostructural.com> wrote: Hey Rodger, What's your phone number? I have a few questions l'd like to discuss with you. Thanks, 10 Geoff Heller Colorado Structural, Inc. tel: (970)-349-5922 fax: (970)-349-5926 geoff@co loladostructural. com From : Roger G iard <roger.g¡ard @giard homes.com> Date: Thursday, May 19, 2O22 at 8:44 AM To: Geoff Hel le r <geoff@ coloradostru ctu ra l. com > Cc: Dan Berg <dan.berg@giardhomes.com> Subject: Merriman Residence Clarifications Geoff, As discussed yesterday, there are a few issues that the building inspector will need clarified/approved before he will let us move on to insulation. Here are the main items that need to be addressed; L. Overframe as-built bracing (See attached pictures) <image006.jpg> <image007.jpg> <image008.jpg> <image009.jpg> <imageOL0.jpg> <imageO1L.jpg> 2. Beam bearing assembly/detail at 52.1, Gridlines D3. ls bearing adequate and per plan based on attached p¡cs? lnstead of using the HUC hanger for the 2-Ll-7/8" beam, it bears on top of the 5-L/2" LVL beam pack coming from plan left, and the 3-LL-7 /8" lvl Beam in the roof rafters (Coming from plan right) bears on top of both with a stud pack in between. <imageO12.jpg> <imageO13.jpg> <imageO14.jpg> 11