Loading...
HomeMy WebLinkAboutConditions of PermitCONDITION OF PERMIT BLRE-O5-22-7 513 Walt Whitaker lll New S/F Dwelling with attached garage 11454 CR 1 1 5, GWS Sec.0ó, T .07 , R.B7 - 2391 0ó400146 1) ALL WORK SHALL COMply W|TH THE 2015 TNTERNATIONAL RESIDENTIAL CODE (l.R.C.) AND 2009 TNTERNATIONAL ENERGY CONSERVATION CODE (l.E.C.C.) 2) PROPOSED TMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED lN THE ATTACHED "GARFI ELD COU NTY BU I LDING REOUI REM ENTS". NU MB ER REFERENCES NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST. 3) ELECTRTCAL PERMtTTtNc AND TNSPECTTONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL ROUGH-IN APPROVAL IS REOUIRED AT FRAME INSPECTION. ELECÏRICAL FINAL APPROVAL IS REOUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY. 4) WILDFIRE MITIGATION REOUIREMENTS: COMPLY WITH WILDFIRE MITIGATION AND DEFENSIBLE SPACE REOUIREMENTS PER COLORADO STATE FOREST SERVICE AND LOCAL FIRE DIsÏRICT. 5) pRE FABRTCATED ROOF TRUSSES. HAVE ENGINEERING FOR INSPECTOR AT TIME OF FRAME INSPECTION. SNOW ROOF LOAD 50 PSF TCLL ó) opEN HOLE SOTLS REPORT tS REOUTRED AT FOOTING INSPECTION AND PRIOR TO ANY CONCRETE POUR. PROVIDE COPY OF GEOTECHNICAL ENGINEERS REPORT TO THE BUILDING INSPECTOR. 3,OOO PSF 7) ON-S|TE WASTEWATER TREATMENT SYSTEM (OWTS)TO BE INSPECTED BY A PROFESSIONAL ENGINEER LICENSED IN THE STATE OF COLORADO. PROVIDE ENGINEER'S FINAL REPORT TO GARFIELD COUNTY PUBLIC HEATH PRIOR TO SCHEDULING A FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY. g) ALL HlcH STRENGTH BOLTTNG AND F|ELD WELDTNG REOUIRES SPECIAL INSPECTOR. PROVIDE APPROVAL REPORT AT FRAMING INSPECTION.