Loading...
HomeMy WebLinkAboutConditions of PermitCONDIT¡ON OF PERMIT BLRE-04-22-7 493 JULIE & MATT FADDEN New S/F Dwelling with attached garage (future barn is excluded from the permít scope) ó9 Weeping Willow Ln, Carbondale Roaring Fork Preserve, Lot 9 1 ) ALL WORK SHALL COMply W|TH THE 2015 TNTERNATIONAL RESIDENTIAL CODE (l.R.C.) AND 2009 INTERNATIONAL ENERGY CONSERVATION CODE (l.E.C.C.) 2) PROPOSED TMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED lN THE ATTACH ED "GARFI ELD COU NTY BUILD I NG REOUI REM ENTS". NU M BER REFERENCES NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST. 3) ELECTRTCAL pERMtTTtNG AND TNSPECTIONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL ROUGH-IN APPROVAL IS REOUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL IS REOUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY. 4) WILDFIRE MlTlcATloN REOUIREMENTS: COMPLY WITH WILDFIRE MITIGATION AND DEFENSIBLE SPACE REOUIREMENTS PER COLORADO STATE FOREST SERVICE AND LOCAL FIRE DISÏRICT. 5) pRE FABRTCATED ROOF TRUSSES. HAVE ENGINEERTNG FOR INSPECTOR AT TIME OF FRAME INSPECTION. ó) opEN HOLE SOTLS REPORT tS REOUTRED AT FOOTING INSPECTION AND PRIOR ÏO ANY CONCRETE POUR. PROVIDE COPY OF GEOTECHNICAL ENGINEERS REPORT TO THE BUILDING INSPECTOR. STRUCTURAL ENGINEER HAS DESIGNED FOUNDATION SYSTEM AT 1.500 PSF SOIL BEARING. 7) A LOT TMPROVEMENT CERT|F|CATE, SEALED BY A COLORADO LICENSED SURVEYOR, lS REOUIRED AT FOUNDATION INSPECTION TO VERIFY STRUCTURE _ INCLUDING ROOF OVERHANGS, DECKS AND OTHER PROJECTIONS - IS IN COMPLIANCE WITH MINIMUM SETBACKS ANDiOR BU I LD I NG ENVELOPE REOU I REM ENTS. 8) ON-S|TE WASTEWATER TREATMENT SYSTEM (OWTS)TO BE INSPECTED BY A PROFESSIONAL ENGINEER LICENSED IN THE STATE OF COLORADO. PROVIDE ENGINEER'S FINAL REPORT TO GARFIELD COUNTY PUBLIC HEATH PRIOR TO SCHEDULING A FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY. g) ATTACHED TO SHEET S1,0 FOUNDATTON PLAN lS THE ENGINEER OF RECORD',S CLARIFICATION NOTES ON FOUNDATION DESIGN DATED JUNE 1, 2022. 10) wHEN /WHERE MULTIPLE FRAM|Nc ASSEMBLY "OPTIONS" OR "ALTERNATE APPROVED MATERIALS" ARE EXPRESSED BY THE ENGINEER OF RECORD. GARFIELD COUNTY BUILDING INSPECTION STAFF REQUEST THE GENERAL CONTRACTOR PROVIDE AT FRAMING INSPECTION ONE OF THE FOLLOWING: 10. a. Mark or highlight on structural pages the options, materials, assemblies used 10.b. Supply a written list of selected options, materials, assemblies used in as-built construction, 1 1) FOR PROPERTY OWNER GENERAL AWARENESS AND UNDERSTANDING, ENCLOSED IS A COURTESY COPY OF THE AMENDED PLAT INCLUDING PLAT NOTES. 12) NQTE FoR FUTURE oWNERS: MAIN LEVEL OFFICE AND (UNCONDITIONED) EXERCISE ROOM NOT APPROVED AS FUTURE BEDROOMS.