Loading...
HomeMy WebLinkAboutConditions of PermitCONDIT¡ON OF PERMIT BLCO -06-22-7564 Caerus Piceance LLC New Control Room @ M23 49ó CDP - Parachute SE, SW1 /4 af Sec 23, T.4S, R.9óW 1) ALL WORK SHALL COMpLy W|TH THE 2015 INTERNATIONAL BUILDING CODE (l.B.C.) AND MAN UFACTURER'S I NSTALLATION I NSTRUCTIONS. 2l ALL WORK MUST COMpLy W|IH CONDTTTONS OF THE CURRENT LAND USE PERMIT. 3) ALL WORK MUST COMPLY WITH STATE AND FEDERAL REGULATIONS. 4) LOCKS, LATCHES AND LANDTNGS SHALL COMPLY WITH 2015 lBC, SECTION 1008 5) CONTRACTOR TO VERtFy CDOH CERT|F|CAT|ON PRIOR TO SCHEDULING BUILDING FINAL INSPECTION ó) pRoposED tMpRovEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED lN THE ATTACH ED "GARFI ELD COU NTY BUI LDING REOUIREM ENTS". NU M BER REFERENCES NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST. 7) ELECTRTCAL pERMtTTtNc AND tNSPECT|ONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL ROUGH-IN APPROVAL IS REOUIRED AT FRAME INSPECTION. ELECÏRICAL FINAL APPROVAL IS REOUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY. B) LtcHT AND VENTTLATTON PER 201 5 tBC, CHAPTER 12 AND 2015 IMC CHAPÏER 3-4 9) HIGH STRENGTH BOLTING / FIELD WELDING (IF ANY PERTAINS), SHALL BE REOUIRED BY SPECIAL INSPECTOR. COPY OF SPECIAL INSPECTOR REPORT TO BE AVAILABLE FOR BUILDING FINAL. 10) GARFTELD COUNTY FINAL / COMPLETION INSPECTION lS RËOUIRED.