Loading...
HomeMy WebLinkAboutSite Plan7^ COLôiÀDô ß11 @äiffi U z9fi= -;'ôtr ã93l¡¡:oô - EËe9E = guí? U ägËHE ÈiEg¡iltRt ã'rã I z s 0 UÉ oz otrN þ oI\N FozJ< =ÈH9<=ro0.< UÜO I¡¡f;hzo É, PROJECT NO. 22llo25 toFt oo oJU tr É. o IEGTN D r) sEr t8in. tRoN PIN wtH 1-25' YELLOW PUSÍ rC CAP 1W3875 EXIST]NG 5' MAJOR CONIOUR EXISINC ]' MINOR CONIOUR PROPOSED 5' MAIOR CONIOUR PROPOSEO ]' MINOR CONIOUR PROPOSEO FLOINE SEDIMENI CONIROL FENCE sEDIMENI CONfROL FENCE ffi N EI ',9" EIISTINC SANIIARY SEWER LINE CONCREIE PR-SS -PR ?,!.----- \l srMw waDDLE al;ùÞ sPorELEvAroN (Æo soo) 3.O% - SLOPEMROW PROPOSTD SANIIARY SEÆR LNE FIISINC WAIFR ] INF ELEPHONE PEDESIAL ÉLÊCIRICA PEOÊSTAT ROOF LINE --{900---590t 5900- 59C1 20 NOTES 1. LOÌS2T9tNTHENENDEOFtN{PUIOFAL@K2PtrE[(dCÊPf1O1S27i,274,286,2ü,2S,ND2S)OF FINAL ÞUIOF IRONBRIOGE PWNÊO UNITOEWIOPMENIPHASE il, FILINGS 1,2 ND 3 ACCOROING TO THE PUT RECORDEO JULY 22.2014 UNDER RECEPTION &iq1, COUNÛ OF WFIELD, STAÍE OF COLO@O. 2, OATE OF FIEIO SURVEY: JULY 7, 2021 , 3. FOR ALL INFORMAÍION REGMOING ilSEMÊNÌ R¡GHfS¡F-WAY ND/OR ÌIILE OF RËCORO, HIGH COUÑIRY ÊÑGIÑEERING, INC. RELIEO UPON TINE COMMITMENT NO. A8S63016'*'0 ISUED AY WDTIILE GUAMNIEE COMPNY. EFFECÍIW DATE: DECEMBERIS,2020. rHlS PROPERry ß SUilECTTOAL CONoIIIONS NO RÊSmCnONS COñlAtN€O f ÉEREtN. 4. [L SURVEY MONUMEMAI¡ON LOCATIONS INSTALEO AS OEPICED ON THIS PUT WERE OBIAINED FROM IHE ORIGINA! SURWY DATÀ IN THEARCHIWS OF HIGH COUMY ÊNGINEÉRING,INC. ÞER¡VÉO FROM IHE NENÞEO FTNAL Pút OF BTOCK 2 OF PHÆÊ [, (EXCEPT LOÌS 271,274,2&,288,2$. AND 2S)AND ALOCK 3 OF PMSE il, {UCEPTIOIS 250,29,2S,259,260, ANO 2æ) OF THE FtN[ PUT OF TRONBRTOGE PUNNED UNI DEVELOPMENI PUSE [, FIL¡NGS 1,2 ¿ 3, REæRDÊOAS RECEPIION NUMBER 85191, COUNÛ OF GÆFIETO, STATE OF COLOMOO. IHE SAID PUT RECOROED 2JULY2O14 UNDER RECENþN NUMBER ff191. øRFIELD COUNW, COLOruO. 5- IHE ACTUA LOCAIION OF UNÞÉRGROUNÞ UfILIIIES MUSI SË FIÊLÞ VERIFIED PRIOR TO CONSIRUCTION. 6. ÊLryAIIONS SHOWN HEREON WERE OERIVED FROM GPS OBSERVAIIONS ON O}29.202i AND ARE BASEO ON NORIH AMERICN VERIICAI DAruM OF 1 S8 (NAVD&) WHICH OAIA WAS OBIAINEÞ ÊROM IHÉ MI¡ONAL GÉOÞÊÌ¡C SURVry ON{NÊ pOStf¡ONtNG USERSERVTCE (OPUS). 7, COÑIOURINTERVALEOUÁS I FOOT, (N U,S. SURVryFEM 10. CHNGESIO IHE GN¡NG PUN ÑO DMINAGE SWL SÉVÊRIFIED IHROUGH IHÊ ÊNGINEER OF RECORO PRIORIO BEING COMPLFED IN üE FIED. 11. NORIHNERTCNGREÊNSlSEROSÍONCONÌROLSNkÊl{ORÊQUrV{ÉNr)tSlOSÊPUCEOON4LSLOPESGR4ER]ru3I. 13, frE IRONBRIDGE SUADMßION IS SUPPLIED WAÍER FROM A MUNICIPru SYSIEM. NO WETLS fO BE LOCAEO, 14. INIERIORIWGE SWIO SLOPE IO FRONÍ OF MMGEAT il4'PER F@I f5. IHE SWÆ SLOPE fO BE A MINIMUM OF 3% NO MUST BE Af IASI 5 OFFSET FROM BE FOUNDAIION, 16. UNDSMPING CANNOT IMPÀCT GMDINGAND OMIMGE ON THE SIE, WDSCÀPING BAI REOUIRES REGUUR HAW IRRIGAION SHOULD BE 6ÊYONO 5' OF NÉ FOUNDA¡ON WALS. 17, AN UNDERDMIN IS NOT NECESSARY FOR THE PROPOSËO FOÙNDAIION DESIGN. RæF DOWNSPOUß SHOULO DISCNGE WELL AryOND TÉ LIMÍS Of SCKFILL. 8OÑD GUIDÊLINÊS W[ BE FOTIOWËD OURINGNO ÆR CONSfRUCIION OF HOME. 19. AREPRESENTAI¡VEOFIIEGEOECHNICALENGINEERSHOULOEVATUAIETHECOMPACIIONOFIHEFILLMIERAS ND OSSERVEAI F@IIÑG EXCAVATIONS PRIOR IO CONCRÊTÉ PúCÊMÊNÍ FORAffiING CONDtr¡ONS-L REFÊRtOfrEKUW&ASSæÁEStNC,SUæO|LSÌUDYFORLOt2T9|RONER|DGE{PROJECÌNO,2!7-591, ÀUGUSI9,2021)FORFOUNOAIIONDÊSIGN FOÂANDFORRESNIC1ONSONGrcIÑGNDDMINAGEFORNEGRAÍE=5966.50' INV lN=sS62.47' INV OUT=5962.37' SUMP=5961.87' 20, WATER ND SSER PIPE JOIMS SHOULD 8E MECHNICALLY RESTMINEO OUE fO HIGH POÍENIIAL FOR OIFFERENTI& SEMEMENT, WAIER NO SEWER SERVICE EFENSIONS SHIT MIMAIN A MINIMUM OF IO' 9. DESIGN BASED ON 6'OF qPOSED FOUNOATIOÑSUS WIIH MINIMUM WTH d OF FM AWAY FROM frE HOME WÍHIN THE FIRSI 5'OF PERV¡OUS WDSCÆING. NDAMINIMUM SLOPEOF 3'OF FIIAWAY FROM IHE HOMEWTHINÊE FIRST IO'OF PAVEOAR4S. MIÑÍAIN PGITIVE DMIMGE AWAYFROM SNUCruRES ìNALL OIRECTIONSATÀTL TIMES. ( 5'ø NYLOPUST ,/44ßlf,4 3Ct1-/ 40PVC@1.7o/ø SLOPE C\BASIN GRAfE=5965.60' INV lN=5961.61' INV lN=5960.94' INV OUT=5960.84' SUMP=5960.34' /Þ 41 l I 7"O1',26"W 15.41 o.2' t t L L I I 2.ROOF LOT 280 327 BLUE HERON VISTA LINE NYLOPLAST BASIN '_ sffi _-GRATE=5S66.50' INV lN=5962.98' INV OUT=5962.88' SUMP=5S62.38' ---'\FUTURE HousE FOOTPRINT @ _v (o oo lh 40 PVC @ 2.0o/, SLOPE N42 E -72.57', .t LF 12'ø ADS o N¡2 1olo sLoPE E|-cFltÍ{Ðoz (n -{ I L [* (f) ä o Þ. q ø .i4 ø RISERAND LOf 274 TEE lls LF 4" SCH 90" BEND GRATE-596ô.60' INV =5963.77'LF 4'SCH -t \",",,,un HOUSE llq 40 PVC @2.OVo SLOPE -A I \ COVEREDTI LoT279 gO3 BLUE HERON VISÍA PARCEL NO 2:1950 I 329278 F.F.E.5968.50' AREA'4590 5q FÌllo.1 I AcREs T I l I I L I I stoPEo@ 2% L ---l--- CURE STOP SÉRVICE -Ã-þà'o¿ ',6 3'X3' CONCRETE PAIIO 6" STEP lO a1% a STUB MARKER j t¡, '(Ð. -.3¡)v " (o.-46)_ "- '"!:::;:7-8"'PR-SS ,)à¿ef BOUNDARY 1t )) I L :g PVC RISER AND 90' ELBOW RIM=5966.50' INV =5963.67' NYLOPLAST BASIN GmTE=5s65.05' INV lN=5962.37' INV lN=5961.70' INV OUT=5961.60' SUMP=5961.10' 40 PVC @2.5Vo SLOPÊ 2.1'TOROOFLINE GRATE-5966.60 INV =5963.23' 40 PVC @2.O% SLOPE 3.1i ROOF ilVE 1 PEDESTAL