HomeMy WebLinkAboutApplicationGarfield County?>ts- ulz.EqfL¿^
8Ë(.:.] o H/:''..' J >-
.': tr=Iy=<
^:E(pı
oul
u¡()
UJÉ
Community Development Department
108 8th Street, Suite 401
Glenwood Springs, CO 81601
l970ls45-8212
www.sarf¡eld-counW.com
CONSTRUCTION
Commercial/Multi-Demolition
Manufactured Home (Single or Multi-Level)
=Reroof.Residential (SF, Duplex or Townhome)
Accessory Dwelling Unit (ADU)- MAXIMUM SIZE OF FEET1 nnn
INVOLVED PARTIES
Property Owner;
Mailing Address:
Jacobe McKittrick Phone:o3 477'335+
997 Brush Creek Lane, Glenwood Springs, CO 81601
Email Address:iake @f lywate routdoors. com
Contractor:Dutchman Ca , Inc phone:r970 ) (rt8'e35Z
Mailing Address:7297 Cr 233, Silt, CO 81652, US
Email Address:lctroyer@msn.com
Architect:Todd Young Architect, LLC Phone:970 - ot(o
Mailing Address:18 Spring View Drive, Glenwood Springs, CO 81601
Email Address:todd @toddyoungarchitect.com
Engineer:ERS Consultants, LLC Phone:720 13t. 33-3
Mailing Address:9354 Morning Glory Lane, Highlands Ranch, CO 80130
Email Address:david @ erseng i neers.com
Manufactured Home lnstaller:N/A Phone:
Mailing Address:
Email Addressl
i PROJECTDETAITS
Describe Workl New Home Residential Construction
Garage:
Job Address:144 Spring View Drive, Glenwood Springs, CO 81601
Assesso/s Parcel Number:23951 01 0901 4
Sub.spRrNcRrDcEREsERVEpuo,pHAsEr,puo lot 14 Block
Owne/s Valuation of Work:31,100,000.00 Property Size (Sq. Ft. or Acres):
Sq. Ft. of Building;3476 Height:22',6"# of Floors: 2
Addition
1.452
Class of Work:
Attached
Remodel/Alteration
Detached
i PROJECÎ DÊTAILS CONTINUED
Driveway
Permit:
NONCE
l
Septic:Community
Type of Heat:I Gas Propane Other
pt Permit #:
Author¡W. This application for a Building Permit must be signed by the Owner of the propert¡ described above,
or an authorized agent. lf the signature below is not that of the Owner, a separate letter of authority, signed by
the Owner, must be provided with this Application.
legal Access. A Building Permit cannot be issued without proof of legal and adequate access to the property for
purposes of inspections by the Building Division.
Other Permits. Mult¡ple separate permits may be required: (1) State Electrical Permit, (2) County OWTS Permit,
(3) another permit required for use on the property identified above, e.g. State or County Highway/ Road Access
or a State Wastewater Discharge Permit.
Void Permit. A Building Permit becomes null and void if the work authorized is not commenced within 180 days
of the date of issuance and if work is suspended or abandoned for a period of 180 days after commencement.
' CERT¡FICAT¡ON
I hereby certify that I have read this Application and that the information contained above is true and correct. I
understand that the Building Division accepts the Application, along with the plans and specifications and other
data submitted by me or on my behalf (submittals), based upon my certification as to accuracy. Assuming
completeness of the submittals and approval of this Application, a Building Permit will be issued granting
permission to me, as Owner, to construct the structure(s) and facilities detailed on the submittals reviewed by
the Building Division. ln consideration of the issuance of the Building Permit, I agree that I and my agents will
comply with provisions of any federal, state or local law regulating the work and the Garfield County Building
Code, OWTS regulations and applicable land use regulations (County Regulation(s)). I acknowledge that the
Building Permit may be suspended or revoked, upon notice from the County, if the location, construction or use
of the structure(s) and facility(ies), described above, are not in compliance with County Regulation(s) or any
other applicable law.
I hereby grant perm¡ssion to the Building Division to enter the propert¡ described above, to inspect the work. I
further acknowledge that the issuance of the Building Permit does not prevent the Building Official from: (1)
requiring the correction of errors in the submittals, if any, discovered after issuance; or (2) stopping
construction or use of the structure(s) or facility(ies) if such is in violation of County Regulation(s) or any other
applicable law. Review of this Application, including submittals, and inspections of the work by the Building
Division do not constitute an acceptance of responsibility or liability by the County of errors, omissions or
discrepancies. As the Owner, I acknowledge that responsibility for compliance with federal, state and local laws
and County Regulations rest with me and my authorized agents, including without limitation my architect
d
-e,¡!gn
e r,,e_n g !¡ e_,e¡ g ¡ Q/or builder.
I hereby acknowledge that I have read and understand the Notice and Certification above, as well as, have
provided the required information which is correct and accurate to the best of my knowledge.
7'/'/ct<"fut"Á
I
06t05t2022
Property Print and Sign Date
23
r
oFFlclA[ UsE oNtY ?¡rp.f trro0.g+ cK.{r t?83 a( /zr /zozz-fu
Special Conditions:
see atta che{ CaNÞ /77 A/1/S
Adiusted Valuation;,,'?Jâ ô20 s L'11ä'N:Vs Permit teel. .- r"
J¿l5l , ó?2 Manu.
tt
Home Fee:
/*
Misc,Fees: - r -
Í¿lt= 8Ì> çl p_
Total Fees: .-.4"3?_ rq. /'Fees Paid:
{l,l oo.Qtl z"i"Ëiw
BP No:
ßwg-lt to OWTS No:
¿ô¡1l4\rNtaY
s"tb,"y-2L.OCC Group:
t. B,c
Const. Type:
l.R..c.
Zoning:
P. rr, D.
7*27-22tiltr*l^BU]LDING / PLANNING DIVISION :
Signed Approval Date
Framing plans for each floor level and roof. All beams, columns, joists, rafters and trusses
specified. Pre-manufactured structures require the engineers stamp, signature and date.
Framing /connection details, braced wall lines, shear wall schedule, location and hold downs.
NOTE: lf any required information is missing, delays in issuing the permit are to be expected. lf
determined by the Building Officialthat additional information is necessary to review the application
and/or plans for compliance, the application may be placed on hold until the required information is
provided. Work may not proceed without the issuance of a permit.
The Building Division will collect a Plan Review fee at time of application submittal. The permit fee, as
well as any Road lmpact fees will be collected when the permit is issued.
The permit application must be signed by the owner or by person having written authority from the owner
to act as their representative.
Building cannot be occupied until a Certificate of Occupancy (CO) is issued. Using the building without a
CO wilfbe considered an illegal occupancy and may be grounds for vacating the premises. (Final/CO
inspection requirements will be attached to your approved field set of plans.)
I hereby acknowledge I have read, understand and will abide by the requirements of this
checklist.
%ct<fu""Á ô5 Lcz/
Owner Print and Sign Date
o
BUILDING DEPARTMENT
708 Eighth Street, Suite 407, Glenwood Springs, CO 87601
Tel: (9701 945-8272
PLAN RE VIEW CH EC KLIST
Permit No: øUeE-ObZZab l0
Gørfre.Id Cownty
Building lssues PlanninglZoning lssues
uenff
Engineered Foundation
Driveway Permit
Surveyed Site Plan
Septic Permit and Setbacks
Grade/ Topography 30%
Attach Residential Plan Review List
Subdivision Notes
Nn Ftood Plain
Property Line Setbacks
30 ft. Stream Setbacks
Building Height
Zoning Sign-Off
Road lmpact Fees Yß, PtZ
Fire Department Review
Valuation Determination/ Fees
Red Line Plans/ Stamps/ Sticker
ch Conditions
Grade/ TopographY 40%
'/ Planning lssues
Subdivision Plat
I
, bgto74- y.t,rtl-
-r' Application Signed
Parcel/ Schedule No.
Nh 40# Snowload Lette
Soils Report
Descri ot ion & Summa ¡'v
-/ pranReviewertosignApptication Ft^S 2548 x 4'b9t /?¿/2g46(.!* ?zs r 7z -- 27ô?¿, @
r-Manu.Homes ,*f/tl aQE X
oranl 2549 x
tZ = Ttt76.eo
l6 - 45/9b/.o"
4 27q0ru,6(
K+A
^t-?b+'T1Z.2,2ô?-l , t,5o07s4 c,úirsk{/w//,g
Ua/aq-h'æ,
Rlp g> =*tzz/,22