HomeMy WebLinkAboutConditions of PermitcoNDlilo NS OF PERMIT
BLRE-07 -22-7 680
Michael & Barbara Husaluk
New Single-Family Dwelling w Attached Garage
TBD Saddle Dr
Ranch at Coulter Creek, Lot22
1) ALL WORK SHALL COMply WITH THE 2015 INTERNATIONAL RESIDENTIAL CODE
(t.R.c.)AND 200e INTERNATIONAL ENERGY CONSERVATION CODE (l.E.C.C,)
2) PROPOSED IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED
IN THE ATTACHED "GARFIELD COUNry BUILDING REOUIREMENTS". NUMBER
REFERENCES NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST.
3) ELECTRTCAL PERMtTTtNG AND TNSPECTIONS BY COLORADO STATE ELECTRIC
BOARD. ELECTRICAL ROUGH-IN APPROVAL IS REOUIRED AT FRAME INSPECTION.
ELECTRICAL FINAL APPROVAL IS REOUIRED FOR FINAL INSPECTION &
CERTIFICATE OF OCCUPANCY.
4) WILDFIRE MITIGATION REOUIREMENTS: COMPLY WITH WILDFIRE MITIGATION
AND DEFENSIBLE SPACE REOUIREMENTS PER COLORADO STATE FOREST SERVICE
AND LOCAL FIRE DISTRICT.
5) OPEN HOLE SOTLS REPORT tS REOUTRED AT FOOTING INSPECTION AND PRIOR TO
ANY CONCRETE POUR. PROVIDE COPY OF GEOTECHNICAL ENGINEERS REPORT
TO THE BU]LDING INSPECTOR, 2,OOO PSF
ó) A LOT TMPROVEMENT CERTIFICATE, SEALED BY A COLORADO LICENSED
SURVEYOR, IS REOUIRED AT FOUNDATION INSPECTION TO VERIFY STRUCTURE -
INCLUDING ROOF OVERHANGS, DECKS AND OTHER PROJECTIONS - IS IN
COMPLIANCE WITH MINIMUM SETBACKS AND/OR BUILDING ENVELOPE
REOUIREMENTS.
7) PRE-ENGINEERED ROOF TRUSSES. PROVIDE ENGINEERING DETAILS FOR
INSPECTOR AT FRAMING INSPECTION,
8) ON-SITE WASTEWATER TREATMENT SYSTEM (OWTS)TO BE INSPECTED BY A
PROFESSIONAL ENGINEER'S FINAL REPORT PRIOR TO FINAL BUILDING
INSPECTION & CERTIFICATE OF OCCUPANCY