Loading...
HomeMy WebLinkAboutEnvelope Compliance CertificateGenerated by COMche ck-Web Software Envelope Compliance Certificate Section 1: Project lnformation Energy Code: 2009 IECC Project Title: High Aspen Ranch Clubhouse Project Type: New Construction Construction S¡te Building Localion (for weather data) Climate Zone: Vertical Glazing / Wall Area Pct.: Building Use: Activity Type(s) 1-Exercise Center : Nonresidential Owner/Agent Glenwood Spr¡ngs, Colorado 5b 4Oo/" Floor Area 3201 Designer/Contractor: Section 2: Envelope Assemblies and Requirements Checklist ,Envelqpe PASSFS: Design rl:3% bétter Envelope Assemblies: Component Name./Description Gross Area or Perimeter Cavity R-Value Cont. R- Value Proposed U-Factor Budget U- Factor(a) Roof: Attic Roof, Wood Joists, lBldg. Use 1 - Exercise Center] Floor: Heated Slab-On-Grade, Vertical 3 tt., [Bldg. Use 1 - Exercise Centerl Ext. Wall: Wood-Framed, 16in. o.c., [Bldg. Use 1 - Exercise Cente4 Window: Wood Frame, Perf. Specs.: Product lD o.25 overall unit U- value, SHGC 0.35, [Bldg. Use 1 - Exercise Center] (b) Door: Wood, Swinging, [Bldg. Use 1 - Exercise Center] Door: , Perf. Specs.: Product lD 0.35 Overall Unit U-value, SHGC 0.35, lBldg. Use 1 - Exercise Center] (b) 3201 308 2995 750 120 328 53.6 0.0 10.0 0.019 0.027 21.0 12.0 0.034 0.250 0.500 0.350 0.064 0.350 0.700 0.800 tr tr tr tr tr (a) Budget U{actors are used for software baseline calculations ONLY, and are not code requirements. (b) Feneslration product performance must be certified in accordance with NFRC and requires supporting documentat¡on. Air Leakage, Gomponent Certificatlon, and Vapor Retarder Requirements: g 1. All joints and penetrations are caulked, gasketed or covered with a moisture vapor-permeable wrapping material installed in accordance wilh the manufacturer's installation instructions. 2. Windows, doors, and skylights certified as meeling leakage requirements. 3. Component R-values & UJactors labeled as certified. 4. No roof insulation is installed on a suspended ceiling with removable ceiling panels. 5. 'Other'components have support¡ng documentation for proposed U-Factors. 6. lnsulation installed according lo manufacturer's instructions, in substantial contact with the surface being insulated, and in a manner that achieves the rated R-value without compressing the insulation. D 7. Stair, elevator shaft vents, and other outdoor air intake and exhaust openings in the building envelope are equipped with motorized dampers. ¡ 8. Cargo doors and load¡ng dock doors are weather sealed. ¡ 9. Recessed lighiing fixtures installed in the building envelope are Type lC rated as meeting ASTM E283, are sealed w¡th gasket or caulk. g 10. Building entrance doors have a vestibule equipped w¡th sellclosing devices. Exceptions: fl Building entrances with revolving doors. E Doors not intended to be used as a building entrance. Pro¡ect Title: High Aspen Ranch Clubhouse Data f¡lename: Report date: 08119121 Page 1 of 7 E Doors that open directly from a space less than 3000 sq. tt. in area. fl Doors used primarily to facilitate vehicular movement or materials handling and adjacent personnel doors. E Doors opening directly from a sleeping/dwelling unit. Section 3: Compliance Statement Compliance Statement: The proposed envelope design represenled in this document is consistenl wilh the building plans, specifications and other calculations submitted wilh this permit application. The proposed envelope syslem has been des¡gned to meet the 2009 IECC requirements in COMcheck-Web and to comply with the mandatory requirements in lhe Requirements Checklist. Name - Title Signature Date Project Title: High Aspen Ranch Clubhouse Data filename: Report date: OBl19l21 Page 2 oÍ 7