HomeMy WebLinkAboutEnvelope Compliance CertificateGenerated by COMche ck-Web Software
Envelope Compliance Certificate
Section 1: Project lnformation
Energy Code: 2009 IECC
Project Title: High Aspen Ranch Clubhouse
Project Type: New Construction
Construction S¡te
Building Localion (for weather data)
Climate Zone:
Vertical Glazing / Wall Area Pct.:
Building Use: Activity Type(s)
1-Exercise Center : Nonresidential
Owner/Agent
Glenwood Spr¡ngs, Colorado
5b
4Oo/"
Floor Area
3201
Designer/Contractor:
Section 2: Envelope Assemblies and Requirements Checklist
,Envelqpe PASSFS: Design rl:3% bétter
Envelope Assemblies:
Component Name./Description Gross
Area or
Perimeter
Cavity
R-Value
Cont. R-
Value
Proposed
U-Factor
Budget U-
Factor(a)
Roof: Attic Roof, Wood Joists, lBldg. Use 1 - Exercise Center]
Floor: Heated Slab-On-Grade, Vertical 3 tt., [Bldg. Use 1 - Exercise
Centerl
Ext. Wall: Wood-Framed, 16in. o.c., [Bldg. Use 1 - Exercise Cente4
Window: Wood Frame, Perf. Specs.: Product lD o.25 overall unit U-
value, SHGC 0.35, [Bldg. Use 1 - Exercise Center] (b)
Door: Wood, Swinging, [Bldg. Use 1 - Exercise Center]
Door: , Perf. Specs.: Product lD 0.35 Overall Unit U-value, SHGC
0.35, lBldg. Use 1 - Exercise Center] (b)
3201
308
2995
750
120
328
53.6 0.0
10.0
0.019 0.027
21.0 12.0 0.034
0.250
0.500
0.350
0.064
0.350
0.700
0.800
tr
tr
tr
tr
tr
(a) Budget U{actors are used for software baseline calculations ONLY, and are not code requirements.
(b) Feneslration product performance must be certified in accordance with NFRC and requires supporting documentat¡on.
Air Leakage, Gomponent Certificatlon, and Vapor Retarder Requirements:
g 1. All joints and penetrations are caulked, gasketed or covered with a moisture vapor-permeable wrapping material installed in accordance
wilh the manufacturer's installation instructions.
2. Windows, doors, and skylights certified as meeling leakage requirements.
3. Component R-values & UJactors labeled as certified.
4. No roof insulation is installed on a suspended ceiling with removable ceiling panels.
5. 'Other'components have support¡ng documentation for proposed U-Factors.
6. lnsulation installed according lo manufacturer's instructions, in substantial contact with the surface being insulated, and in a manner that
achieves the rated R-value without compressing the insulation.
D 7. Stair, elevator shaft vents, and other outdoor air intake and exhaust openings in the building envelope are equipped with motorized
dampers.
¡ 8. Cargo doors and load¡ng dock doors are weather sealed.
¡ 9. Recessed lighiing fixtures installed in the building envelope are Type lC rated as meeting ASTM E283, are sealed w¡th gasket or caulk.
g 10. Building entrance doors have a vestibule equipped w¡th sellclosing devices.
Exceptions:
fl Building entrances with revolving doors.
E Doors not intended to be used as a building entrance.
Pro¡ect Title: High Aspen Ranch Clubhouse
Data f¡lename:
Report date: 08119121
Page 1 of 7
E Doors that open directly from a space less than 3000 sq. tt. in area.
fl Doors used primarily to facilitate vehicular movement or materials handling and adjacent personnel doors.
E Doors opening directly from a sleeping/dwelling unit.
Section 3: Compliance Statement
Compliance Statement: The proposed envelope design represenled in this document is consistenl wilh the building plans, specifications
and other calculations submitted wilh this permit application. The proposed envelope syslem has been des¡gned to meet the 2009 IECC
requirements in COMcheck-Web and to comply with the mandatory requirements in lhe Requirements Checklist.
Name - Title Signature Date
Project Title: High Aspen Ranch Clubhouse
Data filename:
Report date: OBl19l21
Page 2 oÍ 7