HomeMy WebLinkAboutConditions of PermitCOND ITIONS OF PERMIT
BLMF-08-22-7715
LISA MORETTI & MIKE PODMORE
NEW IRC MANUFACTURED DWELLING ON FOUNDATION CRAWL SPACE WITH
ATTACHED GARAGE/GARAGE SLAB & ONSITE WASTEWATER TREATMENT SYSTEM
3347 CR 335, NEW CASTLE
RAPIDS ON THE COLORADO, LOT 1
1)MANUFACTURED HOUSES ARE REGULATED & INSPECTED BY COLORADO DEPT. OF
HOUSTNG (C.D.O.H.)AND ALL FACTORY-BUILT RESIDENTIAL STRUCTURES INSTALLED lN
GARFIELD COUNTY MUST MEET C.D.O.H. GUIDELINES FOR MANUFACTURE AND
INSTALLATION AT THE JOB SITE.
FOUNDATION CRAWL SPACE & ANY SITE COVERED DECKS/PATIOS SHALL COMPLY WITH 2015 I.R.C.,
2OO9 I.E.C.C. AN D MAN U FACTU RER'S I N STALLATION REOU I REM ENTS.
REFER TO PLAN ATTACHMENTS FOR GARFIELD COUNTY'S BUILDING REOUIREMENTS AND
MANUFACTURER'S INSTALLATION REOUI REMENTS.
ALL PLUMBING AND GAS PIPING CONNECTIONS MUST BE PERFORMED BY A COLORADO LICENSED
PLUMBER, AND ALL ELECTRICAL CONNECTIONS MUST BE PERFORMED BY A COLORADO LICENSED
ETECTRICIAN.
ELECTRICAL PERMITTING AND INSPECTIONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL
ROUGH-IN APPROVAL IS REOUIRED AT BASEN/ENT IRAME INSPECTION. ELECTRICAL FINAL
APPROVAL REOUIRED FOR FINAL INSPECTION & CERT. OF OCCUPANCY.
PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY, PROVIDE BUILDING
INSPECTOR WITH FINAL APPROVAL / SIGN-OFF FROM GARFIELD COUNTY'S PUBLIC HEALTH
DEPARTMENT FOR INSTALLATION OF THE ON-SITE WASTEWATER TREATMENT SYSTEM.
GARFIELD COUNTY BUILDING DEPT. INSPECTIONS TO INCLUDE THE FOLLOWING:
A. FOOTINGS DESIGNED AT 1,500 psf OPEN HOLE SOILS REPORT IS REOUIRED AT FIRST FooTlNG
INSPECTION
B. FOUNDATION
C. SEPTIC SYSTEM CONNECTION
D. PLUMBING/GAS
E. SITE / CRAWL SPACE FRAMING CONNECTIONS, STICK-BUILT GARAGE FRAN/ING & PRE-
ENGINEERED ROOFTRUSSES,, AND ANY EXTERIOR DECKS BALCONIES, STAIRS, DOOR LAINDGS
TO BE COMPLETED AT FRAMING INSPECTION.
F. FlNAL INSPËCTION & CERTIFICATE OF OCCUPANCY*
*NOTE: GARFIELD COUNTY REOUIRES C.D.O.H. INSTALLATION INSIGNIA TO BE AFFIXED PRIOR
TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY
2)
3)
4)
7)
s)
ó)
B) A LOT tN/PROVEMENT CERT|F|CATE, SEALED BYA COLORADO LICENSED SURVEYOR lS REOUIRED AT
FOUNDATION INSPECTION TO VERIFf STRUCTURE - INCLUDING ROOF OVERHANGS, DECKS AND
OTHER PROJECTIONS - IS IN COMPLIANCE WITH MINIMUM SETBACKS AND/OR BUILDING ENVELOPE
REOUIREMENTS.
9) A FLOODPLATN ELEVATTON CERTTFTCATE (FEN¡A FORM), SEALED BY A COLORADO PROFESSIONAL
LICENSED SURVEYOR. IS REOUIRED PRIOR TO FRAME INSPECTION. THIS CERTIFICATE SHALL VERIFY
THAT FINISH FLOOR ELEVATION ISA MINIMUM OF 12 INCHES ABOVE FLOODPLAIN ELEVATION.
1O) ANY CONSTRUCTION ACTIVITYTHAT CHANGESTHE BASIC CHARACTER ORTOPOGRAPHY OFTHE
NATURAL I-AND LOCATED IN THE lOO.YEAR FLOODPLAIN MUST FIRST OBTAIN A'FIOODPIAIN
D EVE LOPM ENT PERM IT' TH ROUG H GARFI ELD COU NTY'S PL,AN N I NG DEPT.