Loading...
HomeMy WebLinkAboutConditions of PermitCOND ITIONS OF PERMIT BLMF-08-22-7715 LISA MORETTI & MIKE PODMORE NEW IRC MANUFACTURED DWELLING ON FOUNDATION CRAWL SPACE WITH ATTACHED GARAGE/GARAGE SLAB & ONSITE WASTEWATER TREATMENT SYSTEM 3347 CR 335, NEW CASTLE RAPIDS ON THE COLORADO, LOT 1 1)MANUFACTURED HOUSES ARE REGULATED & INSPECTED BY COLORADO DEPT. OF HOUSTNG (C.D.O.H.)AND ALL FACTORY-BUILT RESIDENTIAL STRUCTURES INSTALLED lN GARFIELD COUNTY MUST MEET C.D.O.H. GUIDELINES FOR MANUFACTURE AND INSTALLATION AT THE JOB SITE. FOUNDATION CRAWL SPACE & ANY SITE COVERED DECKS/PATIOS SHALL COMPLY WITH 2015 I.R.C., 2OO9 I.E.C.C. AN D MAN U FACTU RER'S I N STALLATION REOU I REM ENTS. REFER TO PLAN ATTACHMENTS FOR GARFIELD COUNTY'S BUILDING REOUIREMENTS AND MANUFACTURER'S INSTALLATION REOUI REMENTS. ALL PLUMBING AND GAS PIPING CONNECTIONS MUST BE PERFORMED BY A COLORADO LICENSED PLUMBER, AND ALL ELECTRICAL CONNECTIONS MUST BE PERFORMED BY A COLORADO LICENSED ETECTRICIAN. ELECTRICAL PERMITTING AND INSPECTIONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL ROUGH-IN APPROVAL IS REOUIRED AT BASEN/ENT IRAME INSPECTION. ELECTRICAL FINAL APPROVAL REOUIRED FOR FINAL INSPECTION & CERT. OF OCCUPANCY. PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY, PROVIDE BUILDING INSPECTOR WITH FINAL APPROVAL / SIGN-OFF FROM GARFIELD COUNTY'S PUBLIC HEALTH DEPARTMENT FOR INSTALLATION OF THE ON-SITE WASTEWATER TREATMENT SYSTEM. GARFIELD COUNTY BUILDING DEPT. INSPECTIONS TO INCLUDE THE FOLLOWING: A. FOOTINGS DESIGNED AT 1,500 psf OPEN HOLE SOILS REPORT IS REOUIRED AT FIRST FooTlNG INSPECTION B. FOUNDATION C. SEPTIC SYSTEM CONNECTION D. PLUMBING/GAS E. SITE / CRAWL SPACE FRAMING CONNECTIONS, STICK-BUILT GARAGE FRAN/ING & PRE- ENGINEERED ROOFTRUSSES,, AND ANY EXTERIOR DECKS BALCONIES, STAIRS, DOOR LAINDGS TO BE COMPLETED AT FRAMING INSPECTION. F. FlNAL INSPËCTION & CERTIFICATE OF OCCUPANCY* *NOTE: GARFIELD COUNTY REOUIRES C.D.O.H. INSTALLATION INSIGNIA TO BE AFFIXED PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY 2) 3) 4) 7) s) ó) B) A LOT tN/PROVEMENT CERT|F|CATE, SEALED BYA COLORADO LICENSED SURVEYOR lS REOUIRED AT FOUNDATION INSPECTION TO VERIFf STRUCTURE - INCLUDING ROOF OVERHANGS, DECKS AND OTHER PROJECTIONS - IS IN COMPLIANCE WITH MINIMUM SETBACKS AND/OR BUILDING ENVELOPE REOUIREMENTS. 9) A FLOODPLATN ELEVATTON CERTTFTCATE (FEN¡A FORM), SEALED BY A COLORADO PROFESSIONAL LICENSED SURVEYOR. IS REOUIRED PRIOR TO FRAME INSPECTION. THIS CERTIFICATE SHALL VERIFY THAT FINISH FLOOR ELEVATION ISA MINIMUM OF 12 INCHES ABOVE FLOODPLAIN ELEVATION. 1O) ANY CONSTRUCTION ACTIVITYTHAT CHANGESTHE BASIC CHARACTER ORTOPOGRAPHY OFTHE NATURAL I-AND LOCATED IN THE lOO.YEAR FLOODPLAIN MUST FIRST OBTAIN A'FIOODPIAIN D EVE LOPM ENT PERM IT' TH ROUG H GARFI ELD COU NTY'S PL,AN N I NG DEPT.