Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF P ERMIT BLRE-O7 -22-7 659 Marcelino Holguin Detached Garage, with non-habitable storage basement / loft storage above TBD CR 218, SiIt Heavenly View Subdivision, Lot 3 1) ALL WORK SHALL COMply W|TH THE 2015 INTERNATIONAL RESIDENTIAL CODE (t.R.c.)AND 2009 INTERNATIONAL ENERGY CONSERVATION CODE (l.E,C.C.) 2) PROPOSED IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED IN THE ATTACHED "GARFIELD COUNTY BUILDING REOUIREMENTS", NUMBER REFERENCES NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST. 3) ELECTRTCAL PERMtTTtNG AND TNSPECTIONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL ROUGH-IN APPROVAL IS REOUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL IS REOUIRED FOR FINAL INSPECTION & CERTI FI CATE OF OCCUPANCY. 4) OPEN HOLE SOTLS REPORT tS REOUTRED AT FOOTING INSPECTION, 1,500 P.S.F, PROVIDE COPY OF ENGINEER'S REPORT FOR BUILDING INSPECTOR AT FOOTING INSPECTION. 5) PRE-ENGTNEERED ROOF TRUSSES. HAVE ENGINEERING FOR INSPECTOR AT TIME OF FRAME INSPECTION. ó) COURTESY MESSAGE TO CURRENT/ FUTURE OWNERS: THE DETACHED GARAGE PLAN IS APPROVED WITH AN NON-HABITABLE STORAGE BASEMENT (INCLUDING EMERGENCY BASEMENT EGRESS)AND AN OPEN STORAGE LOFT ABOVE. NO UNDERGROUND OR ROUGH-IN PLUMBING SYSTEMS DEPICTED ON APPROVED PLAN DRAWINGS. STRUCTURE REVIEWED AS A PRIVATE USE DETACHED GARAGE ACCESSORY STRUCTURE, STRUCTURE IS NOTAPPROVED FOR USE AS AN ADDITIONAL DWELLING UNITATTIME OF PERMIT ISSUANCE, ANY FUTURE CHANGE IN BUILDING OCCUPANCY OR USE, WILL FIRST BE SUBJECT TO A NEW BUILDING PERMIT AND LAND USE APPROVALS THROUGH GARFIELD COUNTY COM M U NITY DEVELOPM ENT DEPARTM ENT, 7) NO CONSTRUCTTON pARKtNc / STAGTNG OVER THE EXISTING SEPTIC TANK AND LEACH FIELD.