Loading...
HomeMy WebLinkAboutSubsoil Study 5020 County Road 154 Glenwood Springs, CO 81601 phone: (970) 945-7988 fax: (970) 945-8454 email: kaglenwood@kumarusa.com www.kumarusa.com Office Locations: Denver (HQ), Parker, Colorado Springs, Fort Collins, Glenwood Springs, and Summit County, Colorado SUBSOIL STUDY FOR FOUNDATION DESIGN PROPOSED RESIDENCE LOT 6, BLOCK 3, SECTION 2, BATTLEMENT CREEK VILLAGE 47 VALLEY VIEW PLACE GARFIELD COUNTY, COLORADO PROJECT NO. 22-7-523 SEPTEMBER 26, 2022 PREPARED FOR: RUSSELL CARTWRIGHT 35 WILLOWVIEW WAY PARACHUTE, COLORADO 81635 russecart@gmail.com Kumar & Associates, Inc. ® Project No. 22-7-523 TABLE OF CONTENTS PURPOSE AND SCOPE OF STUDY ....................................................................................... - 1 - PROPOSED CONSTRUCTION ................................................................................................ - 1 - SITE CONDITIONS ................................................................................................................... - 1 - FIELD EXPLORATION ............................................................................................................ - 1 - SUBSURFACE CONDITIONS ................................................................................................. - 2 - FOUNDATION BEARING CONDITIONS .............................................................................. - 2 - DESIGN RECOMMENDATIONS ............................................................................................ - 3 - FOUNDATIONS .................................................................................................................... - 3 - FLOOR SLABS ...................................................................................................................... - 4 - SURFACE DRAINAGE ......................................................................................................... - 4 - LIMITATIONS ........................................................................................................................... - 5 - FIGURE 1 - LOCATION OF EXPLORATORY BORINGS FIGURE 2 - LOGS OF EXPLORATORY BORINGS FIGURE 3 – LEGEND AND NOTES FIGURES 4 and 5 - SWELL-CONSOLIDATION TEST RESULTS TABLE 1- SUMMARY OF LABORATORY TEST RESULTS Kumar & Associates, Inc. ® Project No. 22-7-523 PURPOSE AND SCOPE OF STUDY This report presents the results of a subsoil study for a proposed residence to be located on Lot 6, Block 3, Section 2, Battlement Creek Village, 47 Valley View Place, Garfield County, Colorado. The project site is shown on Figure 1. The purpose of the study was to develop recommendations for the foundation design. The study was conducted in accordance with our agreement for geotechnical engineering services to Russell Cartwright dated July 25, 2022. A field exploration program consisting of exploratory borings was conducted to obtain information on the subsurface conditions. Samples of the subsoils obtained during the field exploration were tested in the laboratory to determine their classification, compressibility or swell and other engineering characteristics. The results of the field exploration and laboratory testing were analyzed to develop recommendations for foundation types, depths and allowable pressures for the proposed building foundation. This report summarizes the data obtained during this study and presents our conclusions, recommendations and other geotechnical engineering considerations based on the proposed construction and the subsurface conditions encountered. PROPOSED CONSTRUCTION The residence will be a single story wood frame structure located on the site as shown on Figure 2. Ground floors will be a combination of structural over crawlspace in the living area and slab-on-grade in the attached garage. Grading for the structure is expected to be relatively minor with cut depths between about 3 to 5 feet. We assume relatively light foundation loadings, typical of the proposed type of construction. If building loadings, location or grading plans change significantly from those described above, we should be notified to re-evaluate the recommendations contained in this report. SITE CONDITIONS The lot was vacant and the ground surface appeared mostly natural at the time of our field exploration. The terrain is relatively flat with strong slope down to the northwest. Vegetation consists of scattered grass, weeds and sage brush. There are single family residences on the adjacent lots. FIELD EXPLORATION The field exploration for the project was conducted on August 3, 2022. Two exploratory borings were drilled at the locations shown on Figure 1 to evaluate the subsurface conditions. The - 2 - Kumar & Associates, Inc. ® Project No. 22-7-523 boring was advanced with 4-inch diameter continuous flight augers powered by a truck-mounted CME-45B drill rig. The borings were logged by a representative of Kumar & Associates. Samples of the subsoils were taken with 1⅜-inch and 2-inch I.D. spoon samplers. The samplers were driven into the subsoils at various depths with blows from a 140-pound hammer falling 30 inches. This test is similar to the standard penetration test described by ASTM Method D-1586. The penetration resistance values are an indication of the relative density or consistency of the subsoils. Depths at which the samples were taken and the penetration resistance values are shown on the Logs of Exploratory Borings, Figure 2. The samples were returned to our laboratory for review by the project engineer and testing. SUBSURFACE CONDITIONS Graphic log of the subsurface conditions encountered at the site are shown on Figure 2. The subsoils encountered, below about 1 foot of topsoil, consisted of very stiff to stiff, sandy to slightly sandy silt underlain at depths from about 17 to 20½ feet by relatively dense, basalt gravel and cobbles with boulders in a sandy silt and clay matrix. At depths from about 17 to 20½ feet at Boring 2, a layer or zone of medium dense, silty clayey sand with scattered gravel was encountered. Drilling in the coarse granular soils with auger equipment was difficult due to the cobbles and boulders and drilling refusal was encountered in Boring 1 in the deposit. Laboratory testing performed on samples obtained from the boring included natural moisture content and density, and percent finer than sand size gradation analyses. Results of swell- consolidation testing performed on relatively undisturbed drive sample of the silt soils, presented on Figures 4 and 5, indicate low to moderate compressibility under conditions of loading. One sample showed a low collapse potential and the other sample showed a minor expansion potential when the samples were wetted under constant light surcharge. The laboratory testing is summarized in Table 1. No free water was encountered in the boring at the time of drilling and the subsoils were slightly moist. FOUNDATION BEARING CONDITIONS The slightly sandy to sandy silt soils encountered at the site possess low bearing capacity and, based on our experience in the area, tend to settle when wetted. Lightly loaded spread footings bearing on these soils can be used for foundation support of the proposed residence with a risk of settlement. To reduce the risk of settlement, we recommend a minimum 2 feet of the soils below footing areas be removed and replaced in a moistened and compacted condition. The minor - 3 - Kumar & Associates, Inc. ® Project No. 22-7-523 expansion potential encountered in one of the samples is believed to be an anomaly and can be neglected in the foundation (and floor slab) design. Placing the foundation on the underlying dense coarse granular soils such as with piles or piers would provide a relatively low risk of foundation movement. Provided below are recommendations for spread footings bearing on a minimum 2 feet of compacted structural fill consisting of the on-site soils. Precautions should be taken to prevent wetting of the bearing soils below the structural fill. Surface runoff, landscape irrigation and utility leakage are possible sources of water which could cause wetting. If recommendations for piles or piers are desired, we should be contacted to provided them. DESIGN RECOMMENDATIONS FOUNDATIONS Considering the subsurface conditions encountered in the exploratory borings and the nature of the proposed construction, we believe the building can be founded with spread footings bearing on a minimum 2 feet of compacted structural fill with some risk of settlement. Precautions should be taken to prevent wetting of the bearing soils below the structural fill. The design and construction criteria presented below should be observed for a spread footing foundation system. 1) Footings placed on a minimum 2 feet of compacted structural fill should be designed for an allowable soil bearing pressure of 1,200 psf. Based on experience, we expect settlement of footings designed and constructed as discussed in this section will be about 1 inch or less. There could be some additional settlement if the bearing soils below the structural fill were to become wetted. The magnitude of the additional settlement would depend on the depth and extent of the wetting but may be on the order of ½ to 1 inch. 2) The footings should have a minimum width of 20 inches for continuous walls and 30 inches for isolated pads. 3) Exterior footings and footings beneath unheated areas should be provided with adequate soil cover above their bearing elevation for frost protection. Placement of foundations at least 36 inches below exterior grade is typically used in this area. 4) Continuous foundation walls should be heavily reinforced top and bottom to span local anomalies and better withstand the effects of some differential settlement such as by assuming an unsupported length of at least 14 feet. Foundation walls - 4 - Kumar & Associates, Inc. ® Project No. 22-7-523 acting as retaining structures should also be designed to resist a lateral earth pressure corresponding to an equivalent fluid unit weight of at least 50 pcf for the onsite soils as backfill. 5) The topsoil, required depth of soil to provide 2 feet of structural fill, and any loose disturbed soils should be removed in footing areas and the excavation extended down to the natural soils. The exposed soils in footing areas should then be scarified a depth of about 8 inches, moistened to near optimum and compacted. The structural fill below the footings can consist of onsite soils, excluding vegetation and topsoil, and should be compacted to at least 98% of standard Proctor density at a moisture content within about 2% of optimum. Structural fill should extend laterally beyond the edge of footings a minimum distance of one foot. 6) A representative of the geotechnical engineer should observe all footing excavations and test structural fill compaction on a regular basis prior to concrete placement to evaluate bearing conditions. FLOOR SLABS The natural on-site soils, exclusive of topsoil, are suitable to support lightly loaded slab-on-grade construction. To reduce the effects of some differential movement, floor slabs should be separated from all bearing walls and columns with expansion joints which allow unrestrained vertical movement. Floor slab control joints should be used to reduce damage due to shrinkage cracking. The requirements for joint spacing and slab reinforcement should be established by the designer based on experience and the intended slab use. A minimum 4-inch layer of well graded sand and gravel base course should be placed beneath slabs for support and to facilitate drainage. This material should consist of minus 2-inch aggregate with at least 50% retained on the No. 4 sieve and less than 12% passing the No. 200 sieve. All fill materials for support of floor slabs should be compacted to at least 95% of maximum standard Proctor density at a moisture content near optimum. Required fill can consist of the on-site soils devoid of vegetation and topsoil, or of imported aggregate base course. SURFACE DRAINAGE A perimeter foundation drain around shallow (less than 4 feet) crawlspace areas should not be needed with positive surface drainage away from foundation walls. The following drainage - 5 - Kumar & Associates, Inc. ® Project No. 22-7-523 precautions should be observed during construction and maintained at all times after the residence has been completed: 1) Inundation of the foundation excavations and underslab areas should be avoided during construction. 2) Exterior backfill should be adjusted to near optimum moisture and compacted to at least 95% of the maximum standard Proctor density in pavement and slab areas and to at least 90% of the maximum standard Proctor density in landscape areas. 3) The ground surface surrounding the exterior of the building should be sloped to drain away from the foundation in all directions. We recommend a minimum slope of 12 inches in the first 10 feet in unpaved areas and a minimum slope of 3 inches in the first 10 feet in paved areas. 4) Roof downspouts and drains should discharge well beyond the limits of all backfill. 5) Landscaping which requires regular heavy irrigation, such as sod, and lawn sprinkler heads should be located at least 5 feet from foundation walls. Consideration should be given to use of xeriscape to reduce the potential for wetting of soils below the building caused by irrigation. LIMITATIONS This study has been conducted in accordance with generally accepted geotechnical engineering principles and practices in this area at this time. We make no warranty either express or implied. The conclusions and recommendations submitted in this report are based upon the data obtained from the exploratory borings drilled at the locations indicated on Figure 1, the proposed type of construction and our experience in the area. Our services do not include determining the presence, prevention or possibility of mold or other biological contaminants (MOBC) developing in the future. If the client is concerned about MOBC, then a professional in this special field of practice should be consulted. Our findings include interpolation and extrapolation of the subsurface conditions identified at the exploratory borings and variations in the subsurface conditions may not become evident until excavation is performed. If conditions encountered during construction appear different from those described in this report, we should be notified so that re-evaluation of the recommendations may be made. This report has been prepared for the exclusive use by our client for design purposes. We are not responsible for technical interpretations by others of our information. As the project evolves, we should provide continued consultation and field services during construction to review and Kumar & Associates Kumar & Associates Kumar & Associates Kumar & Associates Kumar & Associates TABLE 1 SUMMARY OF LABORATORY TEST RESULTS Project No. 22-7-523 SAMPLE LOCATION NATURAL MOISTURE CONTENT NATURAL DRY DENSITY GRADATION PERCENT PASSING NO. 200 SIEVE ATTERBERG LIMITS UNCONFINED COMPRESSIVE STRENGTH SOIL TYPE BORING DEPTH GRAVEL SAND LIQUID LIMIT PLASTIC INDEX (%) (%) (ft) (%) (pcf) (%) (%) (psf) 1 5 2.4 101 Sandy Silt 15 3.4 90 91 Slightly Sandy Silt 2 2½ 4.8 125 76 Sandy Silt 10 2.4 99 Sandy Silt