Loading...
HomeMy WebLinkAboutObservation of Installation 9.8.2022 September 8, 2022 AS-BUILT CERTIFICATE OF INSPECTION & ACCEPTANCE Onsite Wastewater Treatment System Existing 3-BR Single-Family Dwelling 195 Panoramic Drive Silt, CO 81652 The referenced repair onsite wastewater treatment system (OWTS) was inspected August 25, 2022. At the time of inspection, the OWTS was installed in conformance with engineered design plans prepared June 2022. Please contact WestWater Engineering for any additional information regarding engineered-design OWTS for referenced address. Respectfully, Dean R. Goebel, MS Hydrogeologist, PG WestWater Engineering Reviewed By: Keith Mendenhall, P.E. Project Engineer