HomeMy WebLinkAboutObservation of Installation 9.8.2022
September 8, 2022
AS-BUILT CERTIFICATE OF INSPECTION & ACCEPTANCE
Onsite Wastewater Treatment System
Existing 3-BR Single-Family Dwelling
195 Panoramic Drive
Silt, CO 81652
The referenced repair onsite wastewater treatment system (OWTS) was inspected August 25,
2022. At the time of inspection, the OWTS was installed in conformance with engineered design
plans prepared June 2022. Please contact WestWater Engineering for any additional information
regarding engineered-design OWTS for referenced address.
Respectfully,
Dean R. Goebel, MS Hydrogeologist, PG
WestWater Engineering
Reviewed By:
Keith Mendenhall, P.E.
Project Engineer