Loading...
HomeMy WebLinkAboutApplication:a; '' jli -i ,i- .1-i ;"1 LLJ L-t cf ...-l >-ul l:î* :¿[L :] û¿Þ{=(tı LJ UJ à 'ul(J !Àra Community Development Department 108 8th Street, Suite 401 Glenwood Springs, CO 81601 (9701s4s-82t2 www.ga rfiel d-cou ntv.com Garfield Courtty BU¡LDING PERMIT APPLICATION WPE Commercial/Multi-Famiiy lndustrial Use - Util¡ty natural gas compressor station Manufa 9tu¡ed Home (Single or Mulli-Leve!) Resi dential (SF, Duplex or Townhome) I Accessory Dwelling Unit (ADU) - MAXIMUM SIZE OF 1,000 SQUARE FEET Demolition INVOTVED PARTIES property Owner: Public Service Company of Colorado, Cheryl Diedrich phone:303 571-3116 Mailing Address:1123 West 3rd Ave., Denver, CO 80223 Email Address:cheryl. diedrich@xcelenergy. com contractor: Mears Group, lnc., Mike Dennison Phone:970 628-5473 Mailing Address: 2695 Rocky Mountain Ave Suite 2TOLoveland, CO 80538 Emait Addresr. mike.dennison@mears.net Architect:nla Phone: Mailing Address Email Address: Engineer:Winn-Marion, Katherine Jane Wilczek Phone: ( 918 )877'6000 Mailing Address Email Address: 810 S Cincinnati, Second Floor, Tulsa OK74119 Manufactured Home lnstaller: [/â Phone: (_) Mailing Address Email Address: :i PROJECT DETAITSt,- Describe Work . lnstallation of prefabricated Gas Chromatograph building for the Rifle Compressor Station Recommissioning Project. Job Address:770 County Road 264, Rifle, COB1650 Assessor's parcel Numbe r 2177-182-00-287 516. fì/â Lot Owner's Valuation of Work: $4,976.64 Sq. Ft. of Building:140.84 Property Size (Sq. Ft. or Acres) Heig ¡¡. 9',-8&7/8"f of Floors: 1 Block _ 1 .188 acres Class of Work: Gara8e: n¡" New Attached ,/Remodel/Alteration Detached PROJECT DETAILS CONTINUED Septic: nla Community ríàctr¡cType of Heat: nla I oriue*"v I Permit: | ñoryr_ Natural Gas Propane Other Permit #: Existing driveway to be used Authoritv. This application for a Building Permit must be signed by the Owner of the property, described above, oranauthorizedagent. lfthesignaturebelowisnotthatoftheOwner,aseparateletterofauthority,signedby the Owner, must be provided with this Application. Legal Access. A Building Permit cannot be issued without proof of legal and adequate access to the property for purposes of inspections by the Building Division. Other Permits. Multiple separate permits may be required: (1,) State Electrical Permit, (2) County OWTS Permit, (3) another permit required for use on the property identified above, e.g. State or County Highway/ Road Access or a State Wastewater Discharge Permit. Void Permit. A Building Permit becomes null and void if the work authorized is not commenced within 180 days of the date of issuance and if work is suspended or abandoned for a period of L80 days after commencement. CERTIFICATION I hereby certify that I have read this Application and that the information contained above is true and correct. I understand that the Building Division accepts the Application, along with the plans and specifications and other data submitted by me or on my behalf (submittals), based upon my certification as to accuracy. Assuming completeness of the submittals and approval of thisApplication, a Building Permitwill be issued granting permission to me, as Owner, to construct the structure(s) and facilities detailed on the submittals reviewed by the Building Division. ln consideration of the issuance of the Building Permit, I agree that land my agents will comply with provisions of any federal, state or local law regulating the work and the Garfield County Building Code, OWIS regulations and applicable land use regulations (County Regulation(s)), I acknowledge that the Building Permit may be suspended or revoked, upon notice from the County, if the location, construction or use of the structure(s) and facility(ies), described above, are not in compliance with County Regulation(s) or any other applicable law. I hereby grant permission to the Building Division to enter the property, described above, to inspect the work. I further acknowledge that the issuance of the Building Permit does not prevent the Building Official from: (1) requiring the correction of errors in the submittals, if any, discovered after issuance; or (2) stopping construction or use of the structure(s) or facility(ies) if such is in violation of County Regulation(s) or any other applicable law. Review of this Appl¡cation, including submittals, and inspections of the work by the Building Division do not constitute an acceptance of responsibility or liability by the County of errors, omissions or discrepancies. As the Owner, I acknowledge that responsibil¡ty for compliance with federal, state and local laws and County Regulations rest with me and my authorized agents, including without limitation my architect designer, engineer and/ or builder. I hereby acknowledge that I have read and understand the Notice and Certification above, as well as, have provided the required information which is correct and accurate to the best of my knowledge. txa;; o-.}.J/ Cheryl Diedrich, Senior Agent, Right of Way & Permits September 14,2022 Property Owner Print and Sign Date oFFrcrAtUsEoNtY PltO , +ZZ,rt C.C. e/ru/zoz7,_-S,t+_ Special Conditions: Adiusted Valuationi 6+.qzh.çr{ Plan Permit Fee:z5a '""itlff'""'''lilä Tota/Fees: , '.$ lg?,5b Fees Paid: ë 7z.tt Balance Due: ".=5 BP No: BLco -1807 OWTS No,: N/* Setbacks:oCCG¡J¡p:n'+--J-c'q#v12 Zoning: t?,L , /ö-\\-?BUILDING / PLANNING DIVISION r Signed 6Lf)w Date NOTE: lf any required information is missing, delays in issuing the permit are to be expected. lf determined by the Building Official that additional information is necessary to review the application and/or plans for compliance, the application may be placed on hold untilthe required information is provided. Work may not proceed without the issuance of a permit. The Building Division will collect a Plan Review fee at time of application submittal. The Permit Fee, as well as any Road lmpact fees will be collected when the permit is issued. The permit application must be signed by the owner or by a person having written authority from the owner to act as their representative. I hereby acknowledge I have read, understand, and will abide with the requirements of this checklist. txa;¿-o-$J/ Cheryl Diedrich, Senior Agent, Right of Way & Permits Property Owner Print and Sign September 14. 2022 Date