CONDITION OF PERMIT
BLRE-08 -22-77 62
Robert Wallace Jr
New S/F Dwelling with Attached Garage
(includes non-habitable attic storage above)
70 Cutbow Ln, Carbondale
Coryell Ranch, Lot 20 - 239329402020
ALL WORK SHALL COIVPLY WITH THE 2015 INTERNATIONAL RESIDENTIAL CODE (I.R.C.)AND 2OO9
I NTER NAT| ONAL E N ERGY CONSERVATIO N CODE ( l.E.C.C.)
PROPOSED IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED IN THE
ATTACHED "GARFIELD COUNTY BUILDING REOUIREMENTS". NUMBER REFERENCES NOTËD ON
PLANS REFERTO SPECIFIC ITEMS ON THIS LIST.
ELECTRICAL PERMITTING AND INSPECTIONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL
ROUGH.IN APPROVAL IS REOUIRED AT FRAME INSPECTION. ELECTRICAL FINALAPPROVAL IS
REOUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY.
WILDFIRE N/lTlcATlON REOUIREMENTS: COMPLY WITH WItDFIRE MITIGATION AND DEFENSIBLE
SPACE REOUIREMENTS PER COLORADO STATE FOREST SERVICE AND LOCAL FIRE DISTRICT.
OPEN-HOLE SOILS REPORT REOUIRED AT FOOTING INSPECTION. 1,500 PSI SOIL BEARING
CAPACITY. PROVIDE COPY OF ENGINEER'S OBSERVATION REPORT.
PRE.ENGINEERED ROOFTRUSSES. HAVE ENGINEERING FOR INSPECTOR ATT \4E OF FRAMF
INSPECTION.
DUE TO COMPLEX AND DISPERSED NATURE OF STRUCTURAL DESIGN DETAIL - CONTRACTOR SHALL
BE REOUIRED TO SCHEDULETHE BUILDING FRAMING INSPECTION AS A'STAND ALONE' INSPECTION
TYPE. ALL ELECTRICAL, PLUMBING AND MECHANICAL ROUGH-IN INSPECTIONS SHALL BE PASSED
AND APPROVED PRIOR TO REOUESTING THE FRAMING INSPECTION.
SECOND STORY STORAGE AREA ACCESSED BY TBD LADDER FEATURE IS APPROVED FOR USE AS
NON.HABITABTE STORAG E ON LY.
DEFERRED SUBMITTAL DOCUMENTS REOUIRED AT TIME OF FRAME INSPECTION: TOTAL FIRE AREA
OF THE PROPOSED STRUCTURE EXCEEDS ó,200 SOUARE FEET. IN LIEU OF A FIRE SUPPRESSION
SYSTEM, OWNER REPRESENTATIVE / GENERAL CONTRACTOR AGREES AND SHALL SUPPLY FIRE AREA
SEPARATION WALL DETAILS TO BUILDING INSPECTOR AT FRAMING INSPECTION.
4)
s)
ó)
7)
8)
e)
Firc Ar¿a Scparation Wall:
ln líeu of the Fire Sprìnkler System rcgu¡remen| o "Fire Earríer" may be ased to seporote
or compartmentølíze the buîldìng into smoller sìzed fire oreos (2015 1.8'C., Sectíon 707).
Specific requirements ìnclude the followíng:
A. 2-Hou¡ Fire-Ratcl Aæemblv - lhe lire barrier must camply with a 2-hour rsted
ossembly as opproved by o recagnized listing ogency, lncludÍng {2} løyers of 5/8*
Type X drywoll at both sÍdes of wood-frome walls A.B.C.' Toble 7O7'3.10).
8, Cgnttryttv* The fire borríer sholl extend from top of foundatton up to bottom of
roof sheothing. Except øs noted below lor penetratlons, thê z-hour flre'røtlng ot
the fire borríer shall not be compromÍsed over its entire length ønd height,
C, Pcnctretiow tþrouah Fire Be¡¡¡ícr' Doors and door ossemblìes locoted in the
fhe borrler, shall provide a 9Q-mlnute fíre rotìng w¡th outomot¡c closíng device,
Mechønìcal ductwork penetrotìng the fìre barrier shall be protected by t'ìre-rated
dompers ìnstalled ìn such monw os to allow for regulor Ìnspections, serv¡ce &
ma¡ntenonce.