Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS o F PERMIT BLM F-08-22-7775 4C Ranch Investment LLC NEW IRC/ IBC MODULAR DWELLING ON FOUNDATION CRAWL SPACE WITH ATTACHED CARPORTAND UNFINISHED BONUS ROOM ABOVE, SERVED BY NEW O NSITE WASTEWATER TREATM ENT SYSTEM 9023 CR 3,1 2, NEW CASTLE sEC. 34,T.06, R.90 - 218334300058 1) MANUFACTURED HOUSES ARE REGULATED & TNSPECTED BY COLORADO DEPT. OF HOUSTNG (C.D.O.H.)AND ALL FACTORY-BUtLT RESIDENTIAL STRUCTURES INSTALLED lN GARFIELD COUNTY MUST MEET C.D.O.H. GUIDELINES FOR MANUFACTURE AND INSTALLATION ATTHE JOB SITE. 2l FOUNDATTON CRAWL SPACE & ANY S|TE CONSTRUCTED DECKS i PORCHES AND CARPORTS SHALL COMPLY WITH 2015 I.R.C., 2OO9 I.E.C.C. AND MANUFACTURER'S I NSTALLATION REOUI REMENTS. 3) REFER TO PLAN ATTACHMENTS FOR GARFIELD COUNTY'S BUILDING REOUIREMENÏS AND MAN U FACTU RER'S I NSTALLATION REOU I REMENTS. 4\ ALL pLUMBtNc AND cAS ptptNc CONNECTTONS MUST BE PERFORMED BY A COLORADO LICENSED PLUMBER, AND ALL ELECTRICAL CONNECTIONS MUST BE PERFORMED BY A COLORADO LICENSED ELECTRICIAN. 5) ELECTRTCAL pERMtTTtNc AND TNSPECTTONS BYCOLORADO STATE ELECTRIC BOARD. ELECTRICAL ROUGH.IN APPROVAL IS REOUIRED AT BASEMENT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL REOUIRED FOR FINAL INSPECTION & CERT. OF OCCUPANCY. ó) pRtoRTo FTNAL BUtLDtNG TNSPECTION & CERTIFICATE OF OCCUPANCY, PROVIDE BUILDING INSPECTOR WITH FINAL APPROVAL / SIGN-OFF FROM GARFIELD COUNTY'S PUBLIC HEALTH DEPARTMENT FOR INSTALLATION OF THE ON.SITE WASTEWATER TREATMENT SYSTEM. 7) GARF|ELD COUNTY BUTLDtNG DEPT. INSPECTTONS TO INCLUDE THE FOLLOWING: A. FOOTINGS DESIGNED AT 1,500 psf OPEN HOLE SOILS REPORT lS REOUIRED AT FIRST FOOTING INSPECTION B. FOUNDATION C. SEPTIC SYSTEM CONNECTION D. PLUMBING/GAS E. SITE / CRAWL SPACE FRAMING CONNECTIONS, STICK.BUILT CARPORT / BONUS ROOM FRAMING & PRE-ENGINEERED ROOF TRUSSES, AND ANY EXTERIOR DECKS BALCONIES, STAIRS, DOOR LANDINGS TO BE COMPLETED AT FRAMING INSPECTION. F. FINAL INSPECTION & CERTIFICATE OF OCCUPANCY* *NOTE: GARFIELD COUNTY REOUIRES C.D.O.H. INSTALLATION INSIGNIATO BE AFFTXED pRtOR TO FTNAL BUTLDtNG TNSPECTION & CERTTFTCATE OF QCCUPANCY B) ANy CONSTRUCTTON ACT|VTTY THAT CHANGES THE BASIC CHARACTER OR TOPOGRAPHY OF THE NATURAL LAND LOCATED IN THE 1OO-YEAR FLOODPLAIN MUST FIRST OBTAIN A ,FLOOD PLAI N DEVELOPM ENT PERM IT' TH ROUG H GARFIELD COU NTY'S PLAN N I NG DEPT.