John Plano
Thursday, October 27,202210:34 AM
Colleen Wirth
RE: WALLACE - deferred fire wall submittal plan accepted
Nice job Colleen!
John Plano
Garfíeld County
Chief Building Offical
l-08 8th Street, Suite 401
Glenwood Springs, CO 81601
(e70)e4s-1377 (ß6aI
From: Col leen Wirth <cwirth @garfield-cou nty.com>
Sent: Thursday, October 27,2022 7:20 AM
To: Ryan Flournoy <rflournoy@buildwithrm.com>
Cc: John Plano <jplano@garfield-county.com>
Subject: WALLACE - deferred fire wall submittal plan accepted
Hello Ryan,
RE: WALLACE building application at 70 Cutbow Ln.
We understand and accept creation of a FIRE AREA SEPARATION WALL as the owner's preferred desígn method in lieu of
installing a fíre suppressíon system.
Ryan, no further action steps or deliverables are required from RM Construction at this time.
We will process and accept the FIRE AREA SEPARATION WALL ASSEMBLY DETAIL as DEFERRED SUBMITTAL DOCUMENTS
AT TRAMING INSPECTION.
Only one FIRE AREA SEPARATION WALL is required.
The general contractor, subcontractors and property owner may mutually discuss and determine the desired fíre area
separation wall locatíon.
After discussions with John Plano, Chief Building Official, I do want to point out that locating the fire area separation wall
between the primary dwelling and the attached garage - may allow owner more latitude to further add to residential
square footage on the main residential side of the fire wall in future without triggering fire suppression requirements
(than creatíng the fire wall between the garage breezeway and supplemental líving space. Other factors to consider are
where current/ future occupants wish to see installatíon of a 90-minute fire door (aesthetics) and choosíng the fire
barrier location with least impact on mechanical ductwork penetrations andfor dampers.
Hope this helps, agaín, below is STAMP we will affix to your approved OFFICE AND FIELD COPY OF PRINTS and
incorporate in the attached CONDITIONS OF PERMIT page.
1
Fire Area Separrtion Wall:
ln lteu af the Flre Sprlnkler Sysiem requirentent, o 'Fire Ûørrier" moy be used to seporate
or compartmentolirc the buíldìng ínto smqller sized fíre oreos {2A75 Ll,C., Section 707}
Specific requirements ìnctude the following:
A. 2-Hour Flr*Ratcd Alr,smblv * The flre barríer must comply with o 2-hour rdted
ossemåly os approved by a recognized listing ogency, including (2) layers of 5/8"
Type X drywall ot both sìdes af wood-frome wolls (1.8.C., Table 707.3.1O}
E. Cqnalnul_ty - The flre børrter shall extend from top ol founddtÍon up to bo*om of
roof sheothing. fxcept os nated below for penetrotìons, the 2-hour fire-rating ot
the ftre borrler sholl not be compromÍsed over its entìre length and height.
C. Pcnctretion* thrcueh Firc Ûønicr * Ooors and door ossemblies located ìn the
flre borrler, sholl provide a 9&mlnute fìre roting with automotic closíng device"
Mechanícol duetwork penetrotÍng the fíre borrier shqll be protected by fire^rated
dampers installed in such monner os to allow far regular inspections, servlce &
maintenance.
Footnote on DEFERRED SUBMITTAL DOCUMENTS: other clients proposing similar Alternatíve Methods and Materials ....
Have illustrated the assembly via highlighted wall assemblíes on a floor plan PLUS building section detail of the wall
assemblies. I think the 90- minute door can be referenced on the floor plan wíthout REVISING the separate DOOR
schedule page.
I will continue moving your project forward. There are some adminístrative steps to occur by our able Community
Development Technician staff. Please be patient and WAIT for a call from the front desk once the permit documents
and permlt ínvoices are made ready.
Colleen Wirth
Plans ExamÍner
Garfield County Building Dívision
L08 8th Street, Suite 401
Glenwood Springs, CO 81601
cwirth(ôsarfield-cou ntv.com
office {970} 945-L377 ext. 16L0
From: Ryan Flou rnoy <rflou rnov@ bu ildwithrm. com>
Sent: Wednesday, October 26,2A22 3:09 PM
To: Col leen Wirth <cwi rth @ga Éield-cou ntv.com>
Subject: Re: got your voice message
Great, thank you so much!
Ryan Flournoy
RIVI Construct¡on
5030 County Road 154
Glenwood Springs, CO 81601
Direcr: 9' / U-',3 55-U4U4
Office. 970-300-2025
blake@buildwithrm. com
hup ://www. buil dwithrm. com
From : Col leen Wi rth <cwírth @garfield-cou ntv. com>
Sent: Wednesday, October 26,2A22 2:51 PM
2
To: Ryan Flou rnoy <rflournoy@ buildwithrm. com>
Subject got your voice message
Hello Ryan,
Confirm your voice message and email came through clearly.
I have forwarded ínformation by John Plano, Chief Buíldíng Offícial, and will respond as soon as able
Thank you !