Loading...
HomeMy WebLinkAboutRevised Plan 11.08.2022FLOORPLAN THIS FOUNDATION DESIGN WAS BASED UPON A FLOOR PLAN GENERATED BY: ALLDRAFT DATED: 09-09-2022 FLOOR FRAMING PLAN THIS FOUNDATION PLAN IS BASED ON A FLOOR FRAMING PLAN PROVIDED BY: BOISE CASCADE DATED: 09-01 —2022 JOB# 22-206 THE BUILDER SHALL VERIFY THAT A FLOOR FRAMING PLAN HAS BEEN DESIGNED TO BE COMPATIBLE WITH THIS FOUNDATION PLAN. TRUSS PLAN THIS FOUNDATION PLAN IS BASED ON A TRUSS PLAN PROVIDED BY: DELTA BUILDING CENTER DATED: 09-1 5-2022 PROJECT# TS34191 THE BUILDER SHALL VERIFY THAT A TRUSS PLAN HAS BEEN DESIGNED TO BE COMPATIBLE WITH THIS FOUNDATION PLAN. GENERAL CONTRACTOR TO VERIFY ALL DIMENSIONS AND DETAILS PRIOR TO CONSTRUCTION. CONTRACTOR SHALL NOTIFY ENGINEER OF ANY DESCREPANCIES PRIOR TO CONSTRUCTION. CONCRETE 28 DAY COMPRESSIVE STRENGTH OF 3000 PSI. MIN. TYPE II CEMENT REINFORCING STEEL NEW DEFORMED BILLET STEEL PER ASTM A-615, GRADE 60. LAP ALL #5 REBAR 25" LAP ALL #4 REBAR 20" LAP ALL #3 REBAR 15" FINISHING FLOAT & STEEL TROWEL LIGHT BROOM FINISH — EXTERIOR JOINTING COMPLY W/ ACI-301 —72.1 1.1 SAW CUTTING FILL CUTS W/ EPDXY JOINT COMPOUND PROVIDE TOOLED OR SAW CUTS @ 12' O.C. MAX. TO MINIMIZE CRACKING. CURING COMPLY W/ ACI-301 —72 7 DAYS @ OPT. MOISTURE CONTENT SLOPE EXTERIOR CONCRETE AWAY FROM STRUCTURE A MIN. OF 1/8" : 1'-0" SOIL PREPARATION BUILDER/OWNER IS RESPONSIBLE FOR PROPER SOILS PREPARATION AND SHALL VERIFY THAT SITE PREPARATION IS SUITABLE FOR CONSTRUCTION. GEOTECHNICAL ENGINEERING BY OTHERS THIS DESIGN IS BASED UPON A SOILS REPORT BY OTHERS. KUMAR & ASSOCIATES, INC. — JOB #: 22-7-523 BUILDER/OWNER IS RESPONSIBLE FOR PROPER SOILS PREPARATION AND MUST VERIFY THAT SITE PREPARATION IS IN ACCORDANCE WITH REPORT. N I/1TF—_ ENGINEER AUTHORIZES WET STABBING OF VERTICAL REBAR PLAN COLUMN----_ SIMPSON METAL POST BASE 1'-0110 T.O. CONC. FIELD VERIFY CONCRETE PATIO BY III OTHERS I GEOTECHNICAL ENGINEER FOUR 49 APPROVED COMPACTED NON-SNEWNG BACKFILL SPACED EQUALLY THREE #3 STIRRUPS 120 SONOTUBE OR SPACED EQUALLY ENGINEER APPROVED EQUAL o • THREE #5's �� EACH WAY GEOTECHNICAL ENGINEER APPROVED SUBGRADE EQUAL EQUAL 24" fi 1=CAS P057 SASE r;)fi L SCALE: N.T.S. 1-�" A.B. 4' O.G. (2) #4 GONT.--/ TOP, MID,$ BOT #4 ® 48" O.G. I18 #4 ® 48" O.G. L� 6 (2) #4 GONT. 4"14" e e 0 -1.. m_m mmm SCALE: 3/4" = 1'-0" d) V2" A.B. 4' O.G. (2) #4 GONT.--\ TOP, MID,$ BOT V2" EXPANSION MATERIAL 4" SLAB-i SOILS PER GEOTEGHNI2 ENGINEER _ #4 4 48" O.G. I18 #4 g 48" O.G. L� 6 (2) #4 GONT. e e e 8T' 1 5" 1 8'' SGALE: 3/4" = 1'-0" 4' A.B. ® - 4' O.G. (2) #4 GONT. TOP $ BOT LEDGER MOUNTING SYSTEM AND HANGERS PER VENDOR ENGINEERED JOISTS ® I6" O.G. #4 GONT. ® IS" O.G. #4 @ 48" O.G. 18 #4 @ 48" O.G. �� 6 (2) #4 GONT. V2" EXPANSION MATERIAL 4" SLAB SOILS PER 6EOTEGHNIGAL 4" 4" ENGINEER `t • e m_m EME SCALE: 3/4" = 1'-0" I (2) #4 GONT. TOP, BOT $ 1 4" SLAB-i dJ SOILS PER 6EOTEG1114IGAL ENGINEER POUR SLAB OVER WALL 18 H/ #4 DONELS ® 48" O.G. 18 • e c0 N 4" 4" #4 ®48" O.G. IIS #4 ® 48" O.G. L 6 DRAIN - SEE (2) #4 GONT. • e c0 au 8�� au SCALE: 3/4" = I'-O" THIGKENED GONG. SLAB (6) #4 REBAR EACH WAY 3, 0 1 1/7 GOMPAGTED SUB6RADE 3" BELON SLAB $ FOOTER 3" 36" 42" 5 C7 SCALE: 3/4" = 1'-0" REVISIONS A B p C � � Q D 0 0IE 0 eEj 0 0 0 00 0 0 0 cU � N (UZ3 �F- w LI � 0 x 0 0 3m c a� L O DRAWN BY ALLDRAFT FILE NAIVE - CA D FILE DATE 09— 19-2022 ALE VARIES SHEET si