Loading...
HomeMy WebLinkAboutPermit  Garfield County Public Health  2014 Blake Ave.   Glenwood Springs, CO 81601  Phone: (970) 945‐6614 ext. 8150  For inspections, call: 970‐945‐6614 ext. 8150 and call the Design Engineer, if applicable   Project Address: 9495 County Road 115, Glenwood Springs, CO 81601    Parcel No.: 218736104031  Owner Name: High Aspen Ranch Homeowners Association  Owner Phone: (970) 379‐0643  Designed By: CTL/Thompson, Inc.     Designer Phone: (970) 945‐2809  Contractor: Form 44 Construction Management, Inc.  Contractor Phone: (970) 379‐0643         Number of Bedrooms _4__Minimum Tank Capacity _1,250‐gal__Minimum Absorption_2,450 SF  OWTS PERMIT   KEEP AVAILABLE AT PROJECT SITE   Permit Number _SEPT‐7833________________________  Permit Type X New X Repair X Remodel/addition X Tank only X Field Only X Amendment   Issue Date 11/09/2022    Expiration Date 11/09/2023  Permit Conditions:   This OWTS Permit is approved on the condition of compliance with the design as submitted by  CTL/Thompson, Inc. dated November 2, 2022. Changes must be approved by Garfield County Public  Health and the designer prior to construction.     The new OWTS will serve a new 4‐bedroom residence and a garage/office building. The system will  consist of a new, two‐compartment 1,250‐gallon septic tank set level with access to grade and an  effluent filter in the outlet tee of the septic tank followed by a 500‐gallon pump chamber with a  high‐head pump in the chamber. Effluent will be pressure‐dosed to an Automatic Distribution Valve  (ADV) set level with access to grade at the high point of the system that will distribute effluent to  2,496 ft2 of STA. The new STA will consist of two four‐row chamber beds with 26 Quick4 chambers  per row (104 Quick4 chambers per bed, 208 Quick4 chambers total). The pump line shall consist of  1.5‐inch diameter Schedule 40 PVC. Distribution laterals shall consist of 1.5‐inch diameter Schedule  40 PVC hung on the underside of the chambers and have 1/8‐inch diameter orifices facing upward,  every four‐feet on‐center (O.C.). Every fifth orifice shall be facing downward to allow proper  drainage of the laterals. Laterals shall end in a sweeping ell facing up with a ball valve for flushing.  Inspection ports shall be installed at each corner of each bed. Maintain all setbacks and elevations as  designed.    Contact the designer and Garfield County Public Health at least 48 hours prior to requesting final  inspection of the installed system prior to backfill.  Agreement   All installations must comply with all requirements of the Garfield County OWTS regulations  including but not limited to the conditions specified above.   In consideration of the issuance of the permit, the applicant hereby agrees to comply with all  laws and regulations related to the zoning, location, construction and erection of the proposed  OWTS and associated structures for which this permit is granted. The applicant further agrees  that if the above said regulations are not fully complied with in the zoning, location, erection  and construction of the above described OWTS and structure, the permit may then be revoked  by notice from the Health Department and immediately become null and void.  The issuance of a permit and specifications of terms and conditions therein will not constitute  assumption of liability, nor create presumption that the local public health agency or its  employees may be liable for the failure or malfunctioning of any system. Permit issuance will  not constitute a certification that the system, the equipment used in the system, or any  component used for system operation will ensure continuous compliance with the provision of  the OWTS Act, the regulations adopted thereunder, or any terms and conditions of a permit.   Permit Approval  Plans and specifications for the proposed OWTS have been reviewed and are considered  satisfactory. Permission is hereby given to the property owner(s) to perform the work indicated  in accordance with the Garfield County OWTS Regulation. This Permit will expire 1 year from  the date of issuance unless construction on the system has commenced. An "as‐built" drawing  must be submitted and inspection of the system must be completed by GCPH before final  approval of the system will be issued.        11/09/2022  Issued By: Garfield County Environmental Health  Department  Date