Loading...
HomeMy WebLinkAboutEngineer's Framing Letter Kingdom Engineering, LLC Consulting Structural Engineers 5034 E. Cherry Creek South Dr. Denver, Colorado 80246 (303) 741-4196 November 16, 2022 Mr. Tom Doogan Peak3 Ltd. 310 Market Street Basalt, Colorado 81621 Re: Aspen Glen E3 505 E. Diamond A Ranch Road Lot E-3, Aspen Glen, Filing 1 Carbondale, Colorado This letter is in response to framing clarifications for the subject project as requested by the building department framing inspector following the rough framing inspection. Our responses are as follows: Item 1. Flex Space - Inspector is requesting engineer approval for framing and hanger connections for the roof over the flex space. Response: I have reviewed the photos of the framing and hangers as installed and approve of the framing and hangers as installed. Item 2. Flex Space – Missing all-thread at ridge connection for dormer. Response: Two ¾” diameter all-thread are required per Framing Detail 1-S4. Add additional ¾” all-thread to comply. Item 3. Garage – Glu-lam in garage. Inspector is requesting engineer approval for hole size and spacing. Response: I have reviewed the photos of the hole sizes and spacing for the glu- lam beam in the garage and approve the sizes and spacing of the holes installed. Item 4. Garage – Holes drilled in I-joist for gas piping are located 10” from the face of support to the edge of the hole. Response: The minimum edge distance from the face of the support to the edge of a 2” hole is 1’-0”. The pipe must be removed and relocated so the center of the 2” hole is 24” from the face of the support. The holes must be repaired by installing ½” plywood 9½” high x 1’-6” long each Page 2 side of the web centered of the holes. The plywood should be glued and nailed w/ 10d nails 6” o.c. top and bottom. Item 5. Bedroom 3 – Truss Attachment. The inspector is requesting approval from the engineer for the attachment of the 2x12 ledger to the stud wall framing. Response: The 2x12 ledger should be attached to each stud with a minimum of (7)16d nails. . Respectfully Submitted, Thomas A. Kingdom, P.E. Kingdom Engineering, LLC Consulting Structural Engineers