Loading...
HomeMy WebLinkAboutConditions of PermitCOND ITIONS OF P ERMIT BLRE-1 1 .22-7 B9B Fernando Hernandez Single-Family Dwelling w/ attached gtrage 145 Sage Meadow Rd, Glenwood Springs Pinyon Mesa, Flg 1, Lot 15 1) ALL WORK SHALL COMply W|TH THE 201s TNTERNATIONAL RESIDENTIAL CODE (l.R.C.) AND 2009 INTERNATIONAL ENERGY CONSERVATION CODE (l.E.C.C.) 2) PROPOSED TMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED lN THE ATTACH ED "GARFI ELD COU NTY BU I LDING REOUI REM ENTS". NU M BER REFERENCES NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST. 3) ELECTRTCAL pERMtTTtNc AND TNSPECTTONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL ROUGH-IN APPROVAL IS REOUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL IS REOUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY. 4) WILDFIRE MITIGATION REOUIREMENTS: COMPLY WITH WILDFIRE MITIGATION AND DEFENSIBLE SPACE REOUIREMENTS PER COLORADO STATE FOREST SERVICE AND LOCAL FIRE DISÏRICT. s)' PRE-MANUFACTURED ROOF TRUSSES. HAVE ENGINEERING FOR INSPECTOR AT TIME OF FRAME INSPECTION. ó) opEN HOLE SOTLS REPORT tS REOUIRED AT FOOTING INSPECTION AND PRIOR TO CONCRETE POUR. 1,5OO SOIL BEAR¡NG CAPACIW. PROVIDE COPYOF GEOTECHNICAL ENGINEERS REPORT, INCLUDING STRUCTURAL FILL AND COMPACTION REPORT FINDINGS FROM THE GEOTECH AS MAYAPPLY. TO THE BUILDING INSPECTOR. 7) A LOT TMPROVEMENT CERT|F|CATE, SEALED BY A COLORADO LICENSED SURVEYOR, lS REOUIRED AT FOUNDATION INSPECTION TO VERIFY STRUCTURE - INCLUDING PROPOSED ROOF OVERHANGS, DECKS AND OTHER PROJECTIONS - IS IN COMPLIANCE WIÏH MINIMUM SETBACKS AND/OR BUILDING ENVELOPE REOUIREMENTS.