HomeMy WebLinkAboutEngineer's Framing Letter 11.29.2022______________________________________________________________________________________
802 Rood Avenue ꞏGrand Junction, Colorado 81501
970.241.0900 ꞏ970.243.2430 FAX ꞏwww.lindauerdunn.com
Jeffrey A. Dunn
Principal
Leland J. Lindauer
Emeritus
Lot 2, Ruben Minor Subdivision, County Road 346
Garfield County, Colorado
MEMORANDUM
November 29, 2022
TO: Adonai Custom Builders, Inc.
6799 County Rd. 346
Silt, CO 81652
ATTN: Esau Ruiz
SUBJECT: Lot 2, Ruben Minor Subdivision, County Road 346
Garfield County, Colorado
Lindauer Dunn Job #21.003
____________________________________________________________________________________
It was brought to our attention that the manufactured truss overframing that was noted on the roof
framing plan was not installed. The hand-built overframing that was installed will be adequate;
however, there will need to be some modifications. Install 2x6 collar ties 2/3 the distance from the ridge
down to the roof sheathing. The position of the collar tie can be closer to the roof sheathing, but not the
ridge. Attach the collar ties to the rafters with (6)-0.148 x 3” (10d) nails.
If you have any questions, please do not hesitate to call.
Sincerely,
Lindauer Dunn, Inc.
Frank N. Rinaldi, P.E.