Loading...
HomeMy WebLinkAboutEngineer's Framing Letter 11.29.2022______________________________________________________________________________________ 802 Rood Avenue ꞏGrand Junction, Colorado 81501 970.241.0900 ꞏ970.243.2430 FAX ꞏwww.lindauerdunn.com Jeffrey A. Dunn Principal Leland J. Lindauer Emeritus Lot 2, Ruben Minor Subdivision, County Road 346 Garfield County, Colorado MEMORANDUM November 29, 2022 TO: Adonai Custom Builders, Inc. 6799 County Rd. 346 Silt, CO 81652 ATTN: Esau Ruiz SUBJECT: Lot 2, Ruben Minor Subdivision, County Road 346 Garfield County, Colorado Lindauer Dunn Job #21.003 ____________________________________________________________________________________ It was brought to our attention that the manufactured truss overframing that was noted on the roof framing plan was not installed. The hand-built overframing that was installed will be adequate; however, there will need to be some modifications. Install 2x6 collar ties 2/3 the distance from the ridge down to the roof sheathing. The position of the collar tie can be closer to the roof sheathing, but not the ridge. Attach the collar ties to the rafters with (6)-0.148 x 3” (10d) nails. If you have any questions, please do not hesitate to call. Sincerely, Lindauer Dunn, Inc. Frank N. Rinaldi, P.E.