HomeMy WebLinkAboutOWTS Installation Observations 01.05.2023
January 5, 2023
AS-BUILT CERTIFICATE OF INSPECTION & ACCEPTANCE
Onsite Wastewater Treatment System
5-BR Single-Family Dwelling
2546 Mineota Drive
Silt, CO 81652
The referenced onsite wastewater treatment system (OWTS) was inspected on January 3, 2023.
At the time of inspection, the OWTS was installed in general conformance with the OWTS
design plans prepared in February 2022. Please contact WestWater Engineering for any
additional information regarding engineered-design OWTS for referenced address.
Respectfully,
Dean R. Goebel, MS Hydrogeologist, PG
WestWater Engineering
Reviewed By:
Jeremy Gilliam, P.E.
Project Engineer