Loading...
HomeMy WebLinkAboutOWTS Installation Observations 01.05.2023  January 5, 2023 AS-BUILT CERTIFICATE OF INSPECTION & ACCEPTANCE Onsite Wastewater Treatment System 5-BR Single-Family Dwelling 2546 Mineota Drive Silt, CO 81652 The referenced onsite wastewater treatment system (OWTS) was inspected on January 3, 2023. At the time of inspection, the OWTS was installed in general conformance with the OWTS design plans prepared in February 2022. Please contact WestWater Engineering for any additional information regarding engineered-design OWTS for referenced address. Respectfully, Dean R. Goebel, MS Hydrogeologist, PG WestWater Engineering Reviewed By: Jeremy Gilliam, P.E. Project Engineer