RE: Plan corrections
16411 Hwy 82
BLCO-79s2
l. The entrance door tbr the new exterior restroom has been relocated to allow access , sheet no 2.
Z. The access to the exterior restrooms is through the existing fiont entry door to the barn. Please
note there is alsq an existing ADA bathroom within the barn and accessed the same route. See
sheet 7-
3. An existing 1/8" scale floor plan is now provided fbr reference Sheet 7.1
4- The roof drainage system has been revised. It now is a tapered/sleeper system with bithuthene
and membr*"ãttapty*ood over the fìoor joists. The roof will drain from a high point to each
side and slope to opËn-gutters and downspouts. This system will encompass the area over the
new restrooms.
See sheets 4, 5, and 6
Insulation specifications are on anew section tefer to 416'
The LVL joiits are specfied to be pressure treated, sse sheet 6'
The drainage system has been revised, see no 4 above'
The soils report is attached as well as an addendum dated 1/6/2023.
Clarification on additional conditions during oonstruction are added to the plans as much as
5.
6.
7.
8.
9.
fÞasible.
10. Upo¡ dicovery of existing conditions, the door to the existing mechanical room.will remain,
1.uîh", than be relocated, -There is considerable equipment at the prior proposed location. A
drop down grab bar on a hinge will be installed for compliance at the door This same grab bar
was utilized on the GaruiADAbathroom.
Mark Wa¡d
Architect