Loading...
HomeMy WebLinkAboutApplicationCommunity Development Department 108 8th Street, Suite 401 Glenwood Springs, CO 81601 (e7ol s4s-8212 www.garfield-cou ntv.com WPE OF CONSTRUCTION Commercial/Mu lti-Fami Manufactured Home (5i lgle or Multi-Level) Residential (SF, Duplex or Townhome) Acce ssory Dwelling Unit (ADU)- MAXIMUM SIZE OF 1,000 tr Demolition ;E Reroof SQUARE FEET Garfield County BUILDING PERMIT APPLICATION INVOLVED PARTIES Mailing Address: Email Address: Property Owner:S e ter.n I\-rNE= LL(:'Phone:1r)ÐtLa 8 Phone c:-) Contractor: Mailing Address: Email Address Architect:Phone Maíling Address Email Address: Engineer:Phone: Mailing Address Email Address: Manufactured Home lnstaller:Phone: (_) Mailing Address: Email Address: PROJECT DETAIIS Describe Work: Job Address Owner's Valuation of Workl ÈP Sq. Ft. of Building:1,1 tÞ Class of Work:New Property Size (Sq. Ft. or Acres): # of Floo 3 : &rrs¿,^-¡,-P\ e35't ù Assessor's Parcel Numbe rt â4A-l l8 4oft;þ sua.{ltcnq¡nîtf Cf'et l¿V¿i!-ct¡.o, Q etock l6 Addition Garage Attached Height Alteration Detached E JAs it:Perm PROJECT DETAII.s CONTINUED Septic:Community Type of Heat:Natural Gas Propane Electric Other Driveway pt Permit # NOTICE Authoritv. This application for a Building Permit must be signed by the Owner of the property, described above, oranauthorizedagent. lfthesignaturebelowisnotthatoftheOwner,aseparateletterofauthority,signedby the Owner, must be provided with this Application. Leeal Access. ABuildingPermitcannotbeissuedwithoutproof of legal andadequateaccesstothepropertyfor purposes of inspections by the Building Division. Other Permits. Multiple separate permits may be required: (1) State Electrical Permit, (2) County OWTS Permit, (3) another permit required for use on the property identified above, e.g. State or County Highway/ Road Access or a State Wastewater Discharge Permit. VoidPermit. ABuildingPermitbecomesnull andvoidiftheworkauthorizedisnotcommencedwithinL80days the date of issuance and if work is suspended or abandoned for a period of 180 days after commence CERTIFICATION hereby certify that I have read this Application and that the information contained above is true and correct. I understand that the Building Division accepts the Application, along with the plans and specifications and other data submitted by me or on my behalf (submittals), based upon my certification as to accuracy. Assuming completeness of the submittals and approval of this Application, a Building Permit will be issued granting permission to me, as Owner, to construct the structure(s) and facilities detailed on the submittals reviewed by the Building Division. ln consideration of the issuance of the Buildíng Permit, I agree that land my agents will comply with provisions of any federal, state or local law regulating the work and the Garfield County Building Code, OWTS regulations and applicable land use regulations (County Regulation(s)). I acknowledge that the Building Permit may be suspended or revoked, upon notice from the County, if the location, construction or use of the structure(s) and facility(ies), described above, are not in compliance with County Regulation(s) or any other applicable law. I hereby grant permission to the Building Division to enter the property, described above, to ¡nspect the work. I further acknowledge that the issuance of the Building Permit does not prevent the Building Official from: (1) requiring the correction of errors in the submittals, if any, discovered after issuance; or (2) stopping construction or use of the structure(s) or faclllty(ies) if such is ¡n violat¡on of County Regulation(s) or any other applicable law. Review of this Application, including submittals, and inspections of the work by the Building Division do not constitute an acceptance of responsibility or liability bythe County of errors, omissions or discrepancies. As the Owner, I acknowledge that responsibility for compliance with federal, state and local laws and County Regulations rest with me and my authorized agents, including without limitation my architect ; designer, engineer and/ or builder. I hereby acknowledge that I have read and understand the Notice and Certification above, as well as, have provided the required information which is correct and accurate to the best of my knowledge. / -.4Ò-,7){t3 Print and Sign Date ,l P OFFICIAI USE ONTY 3 sæ a ttu¿l4 e¿ ØN D/ 77a/1/S Special Conditions: WE'äMIu"Plan Check Fee +â., å \ Permit Fee:lll,%Manu. Home Fee,u/+Fets:/NMisc. ñt Totãf Fees: t g3.sb F ees Paid: -)a,Ò\Balance Due:Ill 2^5 BP No:Mv-nu OWTS No:-,MTA Setbacks: ¡ ¡¿h> üvtnao oTw Const. Tvoe:-T-r [t'-'PT'i^ì\ ,/ BUILDING / PLANNING DIVISION Signed Approval a-v23 Date Gørfield County BUILDING ÐEPARTMENT 708 Eighth Street, suke 4o7, Glenwood Springs, Co 81æ7 Tel: (97a) 5-8212 Building lssues PLAN REVIEW C HECKLIST Permit No: elÆ- 0/-2C- V7/ Planning/Zoning lssues P"6F4 ¿/6el4 Engíneered Foundation Property Line Setbacks ú'ft. Str""r Setbacks Flood Plain Building Height Zoning Sign-Off Road lmpact Fees Grade/ Topography 40% Planning lssues Subdivision Plat , nOthþ€r*er,vay Permit ilal surveyed Site ptan Nrt Septic Permit and Setbacks aùúS^ae/ ropog ra p hy 3o% NA CONÞ- Aüach Residential Plan Review List Subdivisíon Plat Notes Fire Department Revíew Valuation Determinatíonf Fees Red Line Plans/ Stamps/ Sticker Attach Condítions Applícation Sígned Plan Revíewer to Sign Application Parcel/schedule No. 40# Snowload Letter - Manu. Homes Descri on & Summa ,íulrut/c/ tza/aa*fu =,á1laoo ân#a.*rry *T Ferrh/h Framing plans for each floor level and roof. All beams, columns, joists, rafters and trusses specified. Pre-manufactured structures require the engineers stamp, signature and date. Framing /connection details, braced wall lines, shear wall schedule, location and hold downs. NOTE: lf any required information is missing, delays in issuing the permit are to be expected. lf determined by the Building Official that additional information is necessary to review the application and/or plans for compliance, the application may be placed on hold until the required information is provided. Work may not proceed without the issuance of a permit. The Building Division will collect a Plan Review fee at time of application submittal. The permit fee, as well as any Road lmpact fees will be collected when the permit is issued. The permit application must be signed by the owner or by person having written authority from the owner to act as their representative. Building cannot be occupied until a Certificate of Occupancy (CO) is issued. Using the building without a CO will be considered an illegal occupancy and may be grounds for vacating the premises. (Final/CO inspection requirements will be attached to your approved field set of plans.) I hereby acknowledge I have read, understand and will abide by the requirements of this checklist. /-,1t;,)tâ 4 Property Print and Sign Date a a