Loading...
HomeMy WebLinkAboutRoof Modification Letter from Architect 04.15.2022P.O. Box 2544 • Crested Butte CO 81224 USA • ph: 970.349.5922• f: 970.349.5926 Red House Architecture 4/15/22 Bruce Barth 815 Blake Ave. Glenwood Spring, CO 81601 RE: Baeumler Residence – Roof modification for Mech Equipment Bruce, We understand that you need to modify one or maybe two prefab roof trusses. We have been working with Troy at TrusFab on the below solution. For any trusses you modify you will need to add a 11 7/8”LVL to the bottom of the roof sheathing that will span from wall to beam. The new LVL will be supported at the wall and at the beam. At the bottom chord you will need to add a 7 ¼” LVL to support the unit. Or you could add two 5 ½”LVL. Please let us know if you have any further questions or need anything else. Sincerely, Mike Arbaney P.E. C STRUCTU RAL S COLORADO •ENG INEERING S ERVICES•