Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLRE-03 -23-8009 Aaron Borah New Barn with 970 sq ft Dwelling Unit 3207 CR 342 S¡lt Lot 3-4 - 245502200038 1) ALL WORK SHALL COMPLY WITH THE 2015 INTERNATIONAL RESIDENTIAL CODE (I.R.C.) AND 2009 TNTERNATIONAL ENERGY CONSERVATION CODE (l.E.C.C.) 2) PROPOSED TMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTATNED rN THE ATTACH ED "GARFI ELD COUNTY BU I LDI NG REOU I REMENTS". NUM BER REFERENCES NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST. 3) ELECTRTCAL PERMtTTtNG AND TNSpECT|ONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL ROUGH-IN APPROVAL IS REOUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL IS REOUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY. 4) WILDFIRE MITIGATION REOUIREMENTS: COMPLY WITH WILDFIRE MITIGATION AND DEFENSIBLE SPACE REOUIREMENTS PER COLORADO STATE FOREST SERVICE AND LOCAL FIRE DISTRICT. 5) OPEN-HOLE SOTLS REPORT REOUTRED AT FOOTTNG TNSPECTION. 2,000 PSF SOrL BEARING CAPACITY. PROVIDE COPY OF ENGINEER'S OBSERVATION REPORT (INCLUDING ANY FINDINGS REGARDING STRUCTURAL FILL). ¿) PRE-ENGTNEERED ROOF TRUSSES. HAVE ENGTNEERTNG FOR INSPECTOR AT TIME OF FRAME INSPECTION. 7) ON-SITE WASTEWATER TREATMENT SYSTEM (OWTS) TO BE INSPECTED BY A PROFESSIONAL ENGINEER LICENSED IN THE STATE OF COLORADO. PROVIDE ENGINEER'S FINAL REPORT PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY. 8) MAIN LEVEL MUD / ENTRY, MECHANICAL ROOM AND UNDERSTAIR STORAGE SPACES ARE OPEN TO, OR, ACCESSSED DIRECTLY OFF OF THE GARAGE / STORAGE U OCCPANCY -- AND THEREFORE CURRENTLY CLASSIFIED AS PART OF THE GARAGE OCCUPANCY. GARAGE SPACE(S) SHALL BE SEPARATED FROM THE RESIDENCE PURSUANT TO (2015 IRC) TABLE R302.ó. ANY APPLIANCES INSTALLED IN THESE SPACES SHALL COMPLY WITH (201s rRc) sEcTroN M1307.3 ELEVATION OF IGNITION SOURCE. 9) BUILDING STRUCTURE REVIEWED WITH PRIVATE USE GARAGE / STORAGE / AGRICULTURAL STALL OCCUPANCIES ON MAIN LEVEL AND 970 SO FT DWELLING UNIT ABOVE. FUTURE CHANGES THAT INCREASE OVERALL RESIDENTIAL SOUARE FOOTAGE OF THE DWELLING UNIT OR CHANGE IN OCCUPANCY OR USE OF BOTH STORIES, MAY FIRST BE SUBJECT TO NEW LAND USE AND BUILDING CODE REVIEWS AND/OR A LAND USE CHANGE PERMIT PRIOR TO COMMENCING FUTURE WORK.