HomeMy WebLinkAboutSiding Installation Observation Letter 03.29.2023
2757 design co 1 | 1 po box 1764 carbondale, co 81623
March 29, 2023
re:
178 blue heron - permit no. BLRE-12-12-6636
To Whom It May Concern:
Please review this letter as requested in response to the inspection of siding install at 178
Blue Heron.
The assembly as listed below, is consistent with rain screen siding applications- gapped
boards over drainage substrates. Additionally, Thad Eshleman has installed metal strips in
larger gapped locations, all of the conditions being a thoughtful reuse of reclaimed
materials.
barn siding assembly
(exterior of wood stud framing)
Framing: 2x6 wood w/ 1/2” sheathing
Drainage: double layer of 30 lb felt paper
Finish: gapped wood siding (3/4” - 2” thick) w/ metal strip infill
In this install, the double layer of felt paper will help with UV concerns. Overall, we believe
to be satisfactory of rain screen siding assemblies, also an aesthetic solution
complimentary of traditional rural barns.
Thank you again and please let us know if you have any questions.
signed:
brian golden, principal