Closeout Letter 2023-12862_180 County Rd 109_3-20-23 Page 1 of 2
3/20/2023
FRWC
2575 Highway 6 & 50
Grand Junction, CO 81501
DL Engineering Inc. reviewed the progress of construction from photos provided by the contractor for
the subject project on March 20, 2023. The following is a summary of the observations made:
NEW OBSERVATIONS :
PUSH PIERS
• Reviewed the (2) push piers. Below is a table summarizing pier locations:
Pier Quantity Wall Location (N/S/E/W) Pier Spacing (on center)
2 Chimney Per-Plans
The pier spacing was observed and appears to be in general conformance with
the construction documents.
The piers were installed to refusal or to a depth no less than that specified in the
construction documents.
The push piers appear to be installed in conformance with the structural
mitigation plan.
Existing foundation condition was reviewed, and condition was found to be
adequate to support the existing design. No special considerations were required.
HOUSE PERIMETER CONDITIONS
• Site grading around the perimeter of the house did not appear to be modified.
• Vegetation around the perimeter of the house did not appear to be modified.
VOLATILE SOILS:
The moisture around the foundation elements must be controlled for the useful life of the building. Time
has shown that Colorado soils can be unstable, and structures can experience damaging movements due
to expanding and shrinking soils, primarily when moisture changes occur. Maintaining consistent soil
moisture contents around all foundation elements is crucial to minimizing foundation movements. Even
with properly engineered/constructed foundation systems these volatile soils can still exert excessive
pressures causing damage in the residence. If the Owner would like further insight about the on-site soil
conditions and preventative measures, a Geotechnical Engineer should be consulted.
CLOSEOUT OBSERVATION
Job# 2023-12862 (Client #:44775)
180 County Rd. 109
Carbondale, CO 81623
9100 W Jewell Ave STE. 200
Lakewood, CO 80232
720-440-9450
www.dlengineer.com
Closeout Letter 2023-12862_180 County Rd 109_3-20-23 Page 2 of 2
GEOTECHNICAL CONSIDERATION:
It is possible that the piers may consolidate the soil under the piers. Because of this, periodic surveys of
the supported structures should be conducted to assure project success. The Owner should be responsible
for annual surveys certifying project success. It is recommended that a baseline survey be conducted
immediately. The Owner should report all findings and reports to the Structural Engineer. If vertical
movement of the foundation walls is discovered, the piers should be re-pressurized. A Geotechnical
Engineer should be present for the re-pressurizing of the piers.
DISCLAIMER
In as much as the site review of an existing structure for the purpose of observing the structure conditions
requires that certain assumptions be made regarding existing conditions and because some of these
assumptions may not be verifiable without expending additional sums of money or destroying otherwise
adequate or serviceable portions of the building, the Client agrees that, except for negligence on the part
of the Engineer, the Client will hold harmless, indemnify and defend Engineer from and against any and
all claims arising out of the professional services we have provided.
If you should have any further questions, please feel free to contact me at (720) 440-9450 or
dgabrrielson@dlengineer.com.
Sincerely,
Dave Gabrielson
Under the direct supervision of,
Ross Whitcher, PE
Digitally signed by Ross Whitcher
PE
DN: C=US, O=DL Engineering Inc.,
CN=Ross Whitcher PE,
E=rwhitcher@DLengineer.com
Reason: I am the author of this
document
Location: your signing location here
Date: 2023.04.06 13:41:00-06'00'
Foxit PhantomPDF Version: 10.1.1
Ross
Whitcher
PE