Loading...
HomeMy WebLinkAboutEngineer's Framing Letter 04.13.2023SGM lnc. I 18 Wesl Sixth StreeT. Suile 200 Glenwood Springs, CO 8l ó01 gSGM CONSTRUCTION OBSERVATION REPORT DATE: PROJEGT: PURPOSE: BY: CONTRACTOR: WEATHER: 4t13t2023 Yea-Lih Yen Residence Review of framing Correction items from County lnspector John Partch, P.E. Msion Builderc - Hector Arias Clear TIME: SGM JOB NO. 1:00 PM 202',t-552.001 CONSTRUCTION ACTIVITIES: a4n8no23 I SGM visíted the site on 4113f2023 and again on 411812023 and observed the items listed for the engineer by the building ofücial, John Hendricks' Correction Notice: 1. Engineer Detail for all lookout hangers.2. Engineer detail on truss hangers bearing at garage ledger and 4 pack with 3 pack hanger,3, Engineer approve for change of beam pocket to fabricate hanger. These items were observed in the field and reviewed for conformance with the structural design. Locations of the items reviewed where applicable are noted here: .: ICAC-,M-I é Corrætion Nolic€ Item n3 ffi v . Responses are as noted here: 1. Alternative to the details provided for the lookout framing consist of attachments to the subfascia and trusses or rafters with one of the following: 1.1. For 2X8 Lookouts: Minimum of (4)-16d Face Nails, (5)-16d Toenails, Simpson LUS joist hanger, (2) - Simpson L50 angles (one each side). Ë, ü1 it È. lth'Ð Correcl¡on Item #2 Poge i of 2 Ê € I s!* NI $ Ð(STING (4It I 7/s Ll/L EEAM Ð(ISTINGJOISTI]ANGER Ð(ISTING DOUBLE TOP PIATE 3/a'PIAff E'(ISTINE WTSTEEL BHM LÛx&r3/¿ FITANGLETIGHT TOBOTTOMOF BHM, SHIMAS NEEDED TO PROVIDEFULL L TNSTALL(6Ì r/tØx6- SIMPSONSDS SaREWS(3)EACH SIDEOFGIRDER TRUSSI#NEER BARINGl- Ð(ISTINGBEAMAND TRUSSBEARING, SEERETROFIT DETAIL ì sIt2' 'T fiil ¡il ¡;¡ ilü -tSCALE I lob No 202t,552.001 )00Ø0ð( ô4.r4.r3Ddê: QC: IEP PT:JEP sh.l of 00 F¡lç: BËAM AND TRUSS HANGER RETROFIT DETAILS ESGM I l8 W6r Sinh Sr@r, Suire 200 Glenwood Springs, CO Iló01 970.945.1OO4 w.sgminc.com YEA-IIH YEN RESIDENCE RANCH 27, LOOKOUT MOUNTAIN RANCH GLENWOOD SPRINGS, CO