Loading...
HomeMy WebLinkAboutCorrections and Conditions of Approval 04.20.2023Gørfield County Re: Community I)evelopment Department 0412012023 Owner: New Creation Church of Glenwood Springs 44881 Highway 6 &24 New Castle, CO 81623 Architect: N/A Designer: Solutions Limited Contractor: Jon's Custom Woodworking 411 CR261 sitt, co 81652 Corrections and Conditions of Approval New Creation Church Addition Job Address: 44881 Highway 6 & 24 Dear New Creation Church, The plans have been reviewed to the currently adopted codes in Garfield County. lf an item is missed during review, it is the applicant's obligation to comply with all adopted codes in Garfield County. Below is a list of conditions to be addressed during construction. There is no response needed, compliance will be required during field inspections. Documentation is to be provided during construction, if needed. Please contact me if clarification is required. 108 Eighth Street, Suite 401 Glenwood Springs, Colorado 81601 (e7o) 94s-82t2 Gonditions to be addressed durinq construction: The approved plans are to be on-site for inspections Sanitary facilities are required to be provided for workers. A list of required inspections will be attached to the plans. The State is to permit and approve the electrical work. https://www.colorado.qov/pacific/dora/DPO Electrical Plumbino Permits Underground utility locates is the responsibility of the owner or contractor. 81 1 is the Colorado Utility Locate Hot Line. Electrical Code compliance will be determined based on field inspections performed by the State Electrical lnspector, (303) 869-3458. Please have the inspector sign the building card or provide written documentation of the inspections. The Electrical Code requires a separate Electrical Permit for low voltage fire alarms that has an alarm panel and send a notification to the Fire District when under alarm. A Rough-ln inspection with the State Electrical lnspector is required (303) 869-3458. Please have the inspector sign the building card or provide written documentation of the inspection. The fire sprinkler and alarm are required to be inspected and approved by the Local Fire Protection District. Please provide shop drawings to the Fire District for review and schedule the inspections accordingly. Please have the Fire Marshal sign the inspection card when the rough inspection is approved and when the final inspection is approved. All accessible door hardware shall have a shape that is easy to grip, including pocket and sliding doors. (ANSI A117.1 -404.2.6) An exterior light will be required outside the new exterior door to the Cold Storage, There is a plat note that the light be directed downward, toward the interior of the subdivision. The County's Land Use Code requires the light to be shielded. An lmprovement Location Certificate (lLC - survey) is required to be submitted and approved prior to scheduling a final inspection. Sincerely, John Plano Building Official 108 Eighth Srreer, Suite 401 Glenwood Springs, Colorado 81601 (e70) e4s-8212