HomeMy WebLinkAboutCorrections and Conditions of Approval 04.20.2023Gørfield County
Re:
Community I)evelopment Department
0412012023
Owner:
New Creation Church of Glenwood Springs
44881 Highway 6 &24
New Castle, CO 81623
Architect:
N/A
Designer: Solutions Limited
Contractor:
Jon's Custom Woodworking
411 CR261
sitt, co 81652
Corrections and Conditions of Approval
New Creation Church Addition
Job Address: 44881 Highway 6 & 24
Dear New Creation Church,
The plans have been reviewed to the currently adopted codes in Garfield County. lf an item is
missed during review, it is the applicant's obligation to comply with all adopted codes in Garfield
County. Below is a list of conditions to be addressed during construction. There is no response
needed, compliance will be required during field inspections. Documentation is to be provided
during construction, if needed. Please contact me if clarification is required.
108 Eighth Street, Suite 401
Glenwood Springs, Colorado 81601
(e7o) 94s-82t2
Gonditions to be addressed durinq construction:
The approved plans are to be on-site for inspections
Sanitary facilities are required to be provided for workers.
A list of required inspections will be attached to the plans. The State is to permit and
approve the electrical work.
https://www.colorado.qov/pacific/dora/DPO Electrical Plumbino Permits
Underground utility locates is the responsibility of the owner or contractor. 81 1 is the
Colorado Utility Locate Hot Line.
Electrical Code compliance will be determined based on field inspections performed by the
State Electrical lnspector, (303) 869-3458. Please have the inspector sign the building card
or provide written documentation of the inspections.
The Electrical Code requires a separate Electrical Permit for low voltage fire alarms that has
an alarm panel and send a notification to the Fire District when under alarm. A Rough-ln
inspection with the State Electrical lnspector is required (303) 869-3458. Please have the
inspector sign the building card or provide written documentation of the inspection.
The fire sprinkler and alarm are required to be inspected and approved by the Local Fire
Protection District. Please provide shop drawings to the Fire District for review and schedule
the inspections accordingly. Please have the Fire Marshal sign the inspection card when the
rough inspection is approved and when the final inspection is approved.
All accessible door hardware shall have a shape that is easy to grip, including pocket and
sliding doors. (ANSI A117.1 -404.2.6)
An exterior light will be required outside the new exterior door to the Cold Storage, There is
a plat note that the light be directed downward, toward the interior of the subdivision. The
County's Land Use Code requires the light to be shielded.
An lmprovement Location Certificate (lLC - survey) is required to be submitted and
approved prior to scheduling a final inspection.
Sincerely,
John Plano
Building Official
108 Eighth Srreer, Suite 401
Glenwood Springs, Colorado 81601
(e70) e4s-8212