Loading...
HomeMy WebLinkAboutEngineer's Framing Letter 05.01.2023 CIVCO Engineering, Inc. Civil Engineering Consultants P.O. Box 1758 365 West 50 North, Suite W-1 Vernal, Utah 84078 Phone (435)789-5448 * Fax (435)789-4485 Email: vanceking@civcoengineering.com May 1, 2023 Ryan Locke 207 Buckhorn Road New Castle, CO 81647 Dear Ryan, Subject: Truss Transition Framing – 329 CR 216, Rifle, Colorado In leu of the A34 framing angles that I specified in the construction drawing dated 09/20/2022, joists ‘J1’ and ‘J2’ may be nailed to blocking between joists that in turn is nailed to the trusses from which the joists are to be hung. Size blocking to match the joist being hung. Sincerely, Vance V. King, PE Engineer CIVCO Engineering, Inc. Cc: Project File