HomeMy WebLinkAboutEngineer's Framing Letter 05.01.2023
CIVCO Engineering, Inc.
Civil Engineering Consultants
P.O. Box 1758
365 West 50 North, Suite W-1
Vernal, Utah 84078
Phone (435)789-5448 * Fax (435)789-4485
Email: vanceking@civcoengineering.com
May 1, 2023
Ryan Locke
207 Buckhorn Road
New Castle, CO 81647
Dear Ryan,
Subject: Truss Transition Framing – 329 CR 216, Rifle, Colorado
In leu of the A34 framing angles that I specified in the construction drawing dated 09/20/2022, joists ‘J1’ and ‘J2’
may be nailed to blocking between joists that in turn is nailed to the trusses from which the joists are to be hung.
Size blocking to match the joist being hung.
Sincerely,
Vance V. King, PE
Engineer
CIVCO Engineering, Inc.
Cc: Project File