Loading...
HomeMy WebLinkAboutEngineered Foundation SpecsCRAWLSPACE GARAGE - SLAB ON GRADE 28 27 26 25 24 23 22 21 20 6 7 8 9 10 11 12 13 14 15 16 17 18 19 43 42 41 40 39 38 1 2 3 4 5 44 45 29303132 33 34 35 36 37 2.0ft. 6.0ft. 6.0ft. 6.0ft. 6.0ft. 2.0ft.6.0ft.6.0ft.6.0ft.4.0ft.6.0ft.6.0ft.6.0ft.6.0ft.6.0ft.6.0ft.6.0ft.6.0ft.6.0ft. 17.7ft. 60.0ft. 3.0ft.1.0ft. 6.0ft. 6.0ft. 6.0ft. 6.0ft. 6.0ft. 6.0ft. 6.0ft. 6.0ft. 2.0ft. 2.5ft.6.5ft.6.5ft.6.5ft. 3.0ft. 3.0ft. 6.5ft. 6.5ft. 6.5ft. 6.5ft. 3.0ft.6.0ft.6.0ft.6.0ft.6.0ft.6.0ft.2.0ft. 2.0ft. 4.0ft. 2.0ft. 21.3ft. 10.0ft. N (N) PUSH PIER: 1-45 WOODEN DECK ENGINEERS STATEMENT THE REPAIR IS INTENDED TO PROVIDE STABILITY TO THE FOUNDATION OF THE HOME TO ALLEVIATE FUTURE SETTLEMENT. IT IS RECOMMENDED THAT THE HOMEOWNER WAIT 3-6 MONTHS AFTER PUSH PIER INSTALLATION TO MAKE REPAIRS TO DRYWALL IN THE HOME. THIS IS INTENDED TO ALLOW TIME FOR THE FOUNDATION TO STABILIZE BEFORE REPAIRS ARE MADE. THIS PROJECT IS NOT A GUARANTEE THAT FURTHER SETTLEMENT OR WALL CRACKING WILL NOT OCCUR IN OTHER PARTS OF THE HOUSE NOT INCLUDED IN THIS PROJECT, OR THAT SETTLEMENT OR MOVEMENT OF UNPREPARED PORTION WILL NOT RESULT IN ADDITIONAL CRACKING IN THE REPAIRED SECTIONS. PROPER GRADING AND DRAINAGE WILL HELP PROTECT THE REPAIR WORK FROM BECOMING A CONDUIT FOR MOISTURE INTRUSION TO THE DEEPER SOIL STRUCTURES. REPAIRING A FOUNDATION SYSTEM IN A SUDDEN OR DRAMATIC FASHION USING TECHNIQUES LIKE HELICAL PIERS,PUSH PIERS, PRESSURE GROUTING, OR OTHER QUICK-ACTING LEVELING WITHOUT PROPER METHODOLOGIES CAN HAVE ADVERSE EFFECTS. SUCH AS EXTENSIVE INTERIOR FINISH (DRYWALL) DAMAGE,CRACKS IN TILE FLOORS BUCKLING OR SEPARATION OF WOOD FLOORS, STICKING OR NON-FUNCTIONING WINDOW AND DOOR JAMBS. CONTACT ENGINEER IF UNEXPECTED FIELD CONDITIONS ARE DISCOVERED. NOTES-LOAD SUMMARY 1.ELEVATION - ~6000 FT ABOVE SEA LEVEL 2.ROOF-40 PSF LIVE LOAD (LL) SNOW 3.ASPHALT SHINGLE ROOF 15 PSF DL 4.1ST STORY-40 PSF LL+ 15 PSF DL 5.ATTIC - 10 PSF LL+15 PSF DL 6.STEM WALLS CONCRETE-125 PSF 7.2000 PSF SOIL BEARING STRENGTH-ASSUMED 8.115 MPH Vult WIND SPEED 9.SEISMIC ZONE B PUSH PIER NOTES 1.INSTALL 45 SUPPORTWORKS MODEL 288 PUSH PIERS. 2.PUSH PIERS ON CENTERLINES SHOWN AND MAXIMUM 3 FT. FROM FOUNDATION CORNER. 3.PUSH PIERS CAN BE MOVED UP TO 6" DUE TO FIELD CONDITIONS WITHOUT NOTIFYING ENGINEER. 4.PUSH PIERS MAY BE INSTALLED FROM THE INTERIOR OR EXTERIOR OF THE STRUCTURE, AT THE CONTRACTOR'S DISCRETION. 5.DRIVE CYLINDER MUST BE IDENTIFIED IN PIER LOG FOR FORCE CORRELATION. 6.NO LIFT SHOULD BE ATTEMPTED WITH PUSH PIERS. 2015 IRC/IBC Criterium Cona Engineers 6400 S Fiddlers Green Cir Suite 250 Greenwood Village, CO 80111 PUSH PIER INSTALLATION PREPARED FOR: ERINN TOZER 05.31.2023 309.339.8045 PUSH PIER-DETAIL 1. 48" EXTERNAL SLEEVE 2. BRACKET FLUSH WITH FACE OF STEM WALL-REMOVE FOOTER LIP MATERIAL. 3.FS288BV BRACKET - 36.7 KIP CAPACITY 4. FS35DC DRIVE CYLINDER (RED) 9.62 SQ. IN EFFECTIVE AREA 5. DRIVE PIERS TO 4000 PSI OR UNTIL INITIAL MOVEMENT OF FOOTER IS ACHIEVED 6. DO NOT LIFT STRUCTURE WITHOUT ENGINEER APPROVAL. 2015 IRC/IBC PUSH PIER DETAIL PREPARED FOR ERINN TOZER 05.31.2023309.339.8045 Criterium Cona Engineers 6400 S Fiddlers Green Cir Suite 250 Greenwood Village, CO 80111