Loading...
HomeMy WebLinkAboutEngineer's Framing DetailFrom: Chris Wattier chriswattier@sunlightremodeling.com / Subiect: FW: 1438 River Bend Way: Deck Stair RFls Date: May 28,2023 at 10:07 AM To: Tamara Davies tamidavies@mac.com Can you please print th¡s for me? From: Heidi Hendricks <heidi @evolvestruct.com> Date: Wednesday, May 3, 2023 at 9:05 AM To : Ch ris Wattier <chriswattier @ sunlightremodel i ng.com> Subject: 1438 River Bend Way: Deck Stair RFls Good morning Chris, This email is in response to your questions regarding changes to the Deck Stair Addition drawings at 1438 River Bend Way, dated0312112023.. The 6x6 pressure treated columns as called out ¡n 1/S0.01 may be substituted with 6x6 Redwood columns.. The 518" Ø A.B. specified for the A8A662 may be substituted with an 518" Ø Wedge-All SS Anchor embedded 3" minimum into concrete - Contractor to verify wedge anchor projection compatib¡lity with post base manufacturer.. The double 2xB stringer @ 1 2"o.c. as called out on 1/50.01 may be substituted with (1)2x6 sistered to (1) 2x10 stringers @ 12"o.c. o The stringer connector at top of stair shall be applied to the 2x1O member.¡ All other information including multi-ply attachments shall be as called out on the Construction Documents noted above. Feel free to reach out if you have any questions. Thank you, -Heidi sïlT ijüTuttÅL ü [ s å ü t'¡