HomeMy WebLinkAboutConditions of PermitCONDITIONS OF P ERMIT
BLMF-O4-23-8076
sEPT-04-23-8077
GUTIERREZ. REYES & CARAVEO
2-STORY MANUFACTURED DWELLING & 831 SO FT. UNFINISHED ATTIC LOFT
TBD HARVEST LN, NEW CASTLE
GILEAD GARDENS, LOT 2, 21B1O72O3OO2
MANUFACTURED HOUSES ARE REGUI.ATED & INSPECTED BY COLORADO DEPT. OF HOUSING (C.D.O.H.)
AND ALL FACTORY.BUILT RESIDENT¡AL STRUCTURES INSTALLED IN GARFIELD COUNTY MUST MEET
C.D.O.H. GUIDELINES FOR MANUFACTURE AND INSTALLATION ATTHE JOB SITE.
1)
2)
3)
FOUNDATION CRAWL SPACE & EXTERIOR DOOR LANDING / STAIRS SHALL COMPLY WITH 2015 I.R.C.,
2009 I.E.C.C. AND MANUFACTURER'S INSTALLATION REOUIREMENTS.
REFER TO PLAN ATTACHMENTS FOR GARFIELD COUNTY'S BUILDING REOUIREMENTS AND
MANUFACTURER'S I NSTALLATION REOUI REM ENTS.
WILDFIRE MITIGATION RECOMMENDATIONS: SHOULD COMPLY WITH WILDFIRE MITIGATION AND
DEFENSIBLE SPACE RECOMMENDATIONS COLORADO STATE FOREST SERVICE AND LOCAL FIRE
DISTRICT. PLEASE REFER TO THE GARFIELD COUNry COMMUNITY DEVELOPMENT WEBSITE FOR
ADDITIONAL I NFORMATION.
ALL PLUMBING AND GAS PIPING CONNECTIONS MUST BE PERFORMED BYA COLORADO LICENSED
PLUMBER, AND ALL ELECTRICAL CONNECTIONS MUST BE PERFORMED BY A COLORADO LICENSED
ELECTRICIAN.
ELECTRICAL PERMITTING AND INSPECTIONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL
ROUGH-IN APPROVAL, IF ANY, WORK PROPOSED IN ATTIC LOFT. ELECTRICAL FINALAPPROVAL
REOUIRED FOR FINAL INSPECTION & CERT. OF OCCUPANCY.
PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY, PROVIDE BUILDING
INSPECTOR WITH FINAL APPROVAL / SIGN-OFF FROM GARFIELD COUNTY'S PUBLIC HEALTH
DEPARTMENT FOR INSTALLATION OF THE ON-SITE WASTEWATER TREATMENT SYSTEM.
SEPARATE BUILDING PERMIT IS REOUIRED FOR FUTURE ATTIC FINISH. FINISH OF HABITABLE LIVING /S
NOT INCLUDED UNDER THIS PERMIT.
GARFIELD COUNTY BUILDING DEPT. INSPECTIONS TO INCLUDE THE FOLLOWING:
A. FOOTINGS DESIGNED AT 1,500 PSF, VERIFY 3ó INCH MINIMUM FROST DEPTH & UFERGROUND
INSTALLED. OPEN HOLE SOILS REPORT IS REQUIRED AT FIRST FOOTING INSPECTION, 1,500 PSF.
B. FOUNDATION
C. SEPTIC SYSTEM CONNECTION
D. PLUMBING/GAS
E. SITE FRAMING, STAIRS, HANDRAILS AND ON-SITE INSTALLATION AND FINISH OF ITEMS 1-8 OF
THE COLORADO DOLA LETTER DATED APRIL 9, 2021.
F. FINAL INSPECTION & CERTIFICATE OF OCCUPANCY*
*NOTE: GARFIELD COUNTY REOUIRES C.D.O.H. INSTALLATION INSIGNIA TO BE AFFIXED PRIOR
TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY
4)
s)
ó)
7)
8)
9) OWNER tS RESPONSTBLE TO RECETVE FROM GARFIELD COUNTY ROAD & BRIDGE DEPT A DRIVEWAY
PERMIT OR DRIVEWAY EXEMPTION LETTER FOR BUILDING PERMIT FILE RECORDS. OWNER SHALL CONTACT
GARFTELD COUNTY ROAD & BRIDGE AT (970) 625-8601.
10) PURSUANTTOATTACHED PLAT(RECEPTTON 733191)TESTTNG FOR RADON GAS OR RADON
MITIGATION TO BE COMPLETED PRIOR TO CERTIFICATE OF OCCUPANCY.
ßst coroRAÞo
Dé¡rårtnênt of lpcal Alai¡g
Ðivision of Housing
AC (alternative construction) INSPECTTON REQUIRED NOTICE
The following ¡s based on information provided to the Codes Sêclion and may be modified based on the
actual findings of the field inspection.
DATE: April9,2021
MANUFACTURER: BonnaVilla lD NO.: 3276
Mike Monow / mike. mgrroJv@chigfind.com
CONTACT: Kevin Gartner/FAX NO
MODEL NCI.: PlD5522 P/A NO.; 5167114C
I NSPECTION REQUI REMENTS:
Check on-site installation/finishing of:
1) Collar-tie installations.
2) Truss lateral bracing.
3) Ðormer installations, including flashing.
4') Roof sheathing, underlayment, flashing, and roof covering.
5) Completion of thermal envelope. Lofi is to be unconditioned. The sta¡rwell is to be conditioned
and thermally isolated from Lofr (including door). The door to the Loft should be seeled on all four
sides.6) Loft should have an interconnecled smoke detector and at least one líght that can be activated by
an occupant upon entering the Loft from the stainrell.7l Completion of the stairway, handrails.8l Siding,
Site Add
The local building department by signing this form takes responsihility for inspecting the site built
construction stalëd above to approved plans and current codes.
Normal permits and fees for these inspedions ane to be per the local jurisdÍction.
State approved plans for Factory Buìlt Constructíon may be obtained from the Builder/Manufacturcr
Building Official Printed Nâ h*.Ð
Building Official
Local jurisdiction may check box to defer inspectlon to the Ðivision of Housing,
or DOH approved lnspector.
1-æ
lnitials
5n
¡ol¡r¡ mou¡nrolÞðrruNltT
1313 Sherman St., Rm 320, Denver, CO 80203 | (303) 864-7810 I cdola.cotorado.govlhousing
ßçt COLORADO
Depa¡ltnent of Locat Aüairt
Divlsion of Houskrg
A copy of this Notice must be included with the ¡nstallation instructions and shipped with the unit.
Please direct questions to DOH Engineer, @ 303-864-7835
13.t3 Sherman Sr,, Rm 320, Denver, CO 80203 | (303) 8ô4-7810 | cdota.c{,tÕr"rtr..,,qtl-ïCl,l.ng
' '. ..: :.
Tr
¡orrâr Fclntt{ooPtortutlÛY