HomeMy WebLinkAboutCover Letter-Scope of Work@ x"elEnergy' Xcel Energy Rifle Compressor Station Building Permit E€ngineering" INSTRUMENT AIR BUILDING RIFLE COMPRESSOR STATION RECOMMISSIONING PROJECT QUESTAR INTERCONNECT ADDRESS: 613 COUNTY ROAD 264, RIFLE, CO 8L650 DESIGN SPECIFICATIONS: SEE BUILDING PACKAGE 08/22/2022 9.ogt ¡È vtorV @ XcelEnergy' RESPONSIBTE BY NATUREO 1800 Larimer Street, Suite 1300 Denver, Colorado 80202 Telephone: (832) 326-5994 Trent. M.Johnson@xcelenerqv.com September 8,2022 Garfield County Community Development, Building Division Attention: Sam lrmen 108 Bth Street, Suite 401 Glenwood Springs, CO 81601 RE: Rifle Compressor Station Recommissioning Project, Building Permit Applications - Control Building, Main Compressor Building, and lnstrument Air Building Public Service Company of Colorado (PSCo), dba Xcel Energy, is proposing to construct, operate, and maintain the Rifle Compressor Station Recommissioning Project (Project) in unincorporated Garfield County, Colorado. This Project will update and return-to-service PSCo's existing natural gas compression facility in the same footprint. Community Development approved the Project's Amended Special Use permit - Minor Modification in July 2022. The Project also has an approved Grading Permit. Enclosed are the Building Permit applications for the Control Building, Main Compressor Building, and lnstrument Air Building associated with the Project. Each Building Permit application includes the application form as well as architectural, structural, and civil drawings. We will be submitting a separate building permit application for the Gas Chromatograph Building at a later date. pSCo understands that backfilling and concrete pouring specifically related to the building foundations are not allowed before Building Permits are approved and the inspection is completed. PSCo respectfully notes that the natural gas compressor skid foundation (shown in red in Exhibit 1) is intentionally separate from the compressor station building foundation (shown in green in Exhibit 1) and will not support the building. PSCo plans to complete the compressor skid foundation (i.e., the red area) under the Project's approved Amended Special Use Permit and Grading Permit. PSCo willwait for the approved Building permit and inspection before pouring the concrete for the compressor station building foundation (i.e., the green area). Completing the compressor skid foundation ahead of the building foundation will allow scheduled follow-on activities, including building foundation construction and building erection to be performed as planned. pSCo understands that Garfield County processes Building Permit applications in the order received. Given the relatively simple design and construction of these prefabricated buildings, PSCo respectfully requests that the enclosed Building Permit applications be reviewed as quickly as possible to meet the construction schedule, which allows for in-servicing of the project prior to year end and enables receipt of this new Source of gas in the area to support the upcoming winter heating Season. We look fon¡vard to your review of the application submittal. lf you have any questions regarding the structural design, please contact the structural engineer, Ernesto Costa, at ecosta@enengineering.com stililE0 Itand 630-473-3619, For other q with Tetra Tech, lnc., at (303) Sincerely, environmental consultant, Stephanie Phippen Æ*r;fr,Ár** Trent Johnson Project Manager Xcel Energy Exhibit 1: Compressor Building Foundation Notes Attachments Attachment A. Control Building Permit Application Attachment B. Main Compressor Building Permit Application Attachment C. lnstrument Air Building Permit Application Attachment D. Civil Drawings Showing Building Locations