HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT
BLRE-06-23-8L48
Erinn Tozer
Foundation Repair
47 White Peaks Ln, GWS
lronbridge, Lot I45
1) ALL WORK MUST COMply W|TH 201s TNTERNATTONAL RESIDENTIAL CODE (lRC) AND
ENGINEER OF RECORDS SOIL EVALUATION AND STRUCTURAL REPAIR PLAN.
2) THtS PERMtT tS TSSUED FOR FOUNDATION REPAIRS ONLY. ADDITIONAL REPAIRS TO THE
RESIDENTIAL BUILDING STRUCTURE _ IF DEEMED NECESSARY - MAY REQUIRE A
SEPARATE BUILDING PERMIT. IF ADDITIONAL STRUCTURAL DEFICIENCIES ARE
ENCOUNTERED DURING FOUNDATION REPAIR WORK, THEN A SUBSEQUENT
EVALUATION AND STRUCTURAL DETAILS MAY BE DEEMED NECESSARY FROM THE
ENGINEER OF RECORD.
3) ENGTNEER OF RECORD SHALL FTELD VERTFY TNSTALLATION OF (4s) PUSH PIERS
COMPLETED PER REPAIR PLAN. ENGINEER,S STAMPED APPROVAL REPORT IS REQUIRED
AT BUILDING FINAL INSPECTION.
4) tF GAS METER tS DTSCONNECTED, A GAS PIPE PRESSURE TEST AND INSPECTION MAY BE
REQUIRED FOR METER RECONNECTION.
5) FINAL BUILDING INSPECTION BY GARFIELD COUNry BUILDING DEPT IS REQUIRED AFTER
COMPLETION OF FOUNDATION REPAIRS.
REVIEWED FOR CODE COMPTIANCE
s t' lll LCT TO NOTED EXCEPTIONS & TNSPECTTONS
GAR TJIËLD COUNTY COMMUNITY DEVELOPMENT
DArE b-1h23 ""Ùt),i,r*ln
rLc
\)
LÛ
(-)tt
l-L
ô
w,
-C¡I
-tt,.T¡E
E¡EL
g¡
.1=
-ts.lt
El ,-.FS
EL +¡Et trl.ry, -lL! E¡EEã'E -llll '-
¡¡:
-L
-La-
E-t¿¡¡Lo¡Ntrtl-
NO INSPECTION lryITHOUT THESE PLANS ON SIÎE
RIïilM @
G EERS
Cona Engineers LLC
lndependently Owned and Opented
6400 S Fiddlers Green Cir
Suite 250
Greenwood Village, CO 80í l1
309.339.8045 Phone
l.lay 3I't,2023
Aspen Foundation Repair
732 Buckhorn Dr
Unit B
Rifle, CO 81650
47 White Peaks Ln
Glenwood Springs, CO 81601
RE: Structural Inspection
' ;.1' i .r i,l.;i. irt[:!Ìi']'ll'l'Tl f'iG & I hilìPËeT lON$,4RË
,,, i ,l ' i:ii:írAllil STATF Ë|"[CTR|CAL ßtARn
ENGINEER SHALL BE ON SITE DURING
PIER, PILE, OR CAISSON INSTALI.ATION"
PROVIDE APPROVAL REPORTAT
FOUNDATION INSPECTION
To Whom It May Concern;
In accordance with your request, we reviewed the structural requirements
for the subject address. The property was visited on Thursday,
0511812023 by Joe O'Neil, P.E. The scope of work was determined by
Aspen Foundation Repair and accepted by the owner prior to the
involvement of Criterium-Cona Engineers.
DESCRIPTION
All descriptions of the structure are based on observation from White
Peaks Ln. The front of the structure is assumed to face east for the
purpose of this report.
The subject structure is a two-story home reportedly built in 2005. The
home is wood-framed construction with lapped siding and board and
batten exterior. Structure has a complex gable/hip-style, asphalt-shingle
roof with gutters and downspouts for drainage. There is an attached two-
car garage on the left side of the home.
The foundation of the home is a concrete stem wall and an assumed
footer. The footer could not be directly observed. No foundation or as-
built construction drawings were available for review for this project. No
soils testing was available for this report.
LICENSED
PROFESSIONAL
ENGINEERS
HOME AND BUILDING INSPECTION
STRUCTURAL EVALUATION
DESIGN
@
nñtrtfl tf,ilw ^eQ^^l^TlrlÀl cEÞ\/l^trQ